Manhattan · Block 1213 · Lot 23 · 10024

113 West 82 Street

4 floors · 10 apartments · 5,195 sq ft · built 1889 · class C5 · owner of record: West 82 Equities, Llc

4open violations
$22,500ECB/OATH penalties owed
1HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-10 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (5) · $22,500 owed
IssuedViolationHearingBalance
May 22, 2025Unknown CLASS - 2
SIDEWALK SHED FOUNDING NOT AS PER CODE. AT TIME OF INSPECTION OBSERVED A SIDEWALK SHED ERECTED AT EXPOSURE#1 OF PROPERTY. UPON INSPECTION IT WAS OBSERVED THAT ALL MUDSILLS USED AS FOUNDATION WERE NOT PROPERLY S
#39148703K
Jul 31, 2025
DEFAULT
$5,000
May 21, 2025Construction CLASS - 1
FAILURE TO COMPLY WITH SIDEWALK SHED DRAWING # EQ-100.00, DATED ON 05/23/2024 NYC DOB JOB NUMBER M01031744-I1, AND FAILURE TO COMPLY WITH CODES 3307.6.2 FOR ADDITIONAL COVERAGE (EXTENSION 5 FEET) ON BOTH SIDES
#39540452L
Jul 31, 2025
DEFAULT
$6,250
May 21, 2025Construction CLASS - 2
SHED PLACED AT EXPOSURE ONE.
#39540453N
Jul 31, 2025
DEFAULT
$3,125
Dec 6, 2024Construction CLASS - 2
FAILURE TO COMPLY WITH SIDEWALK SHED DRAWING # EQ-100.00, DATED ON 05/23/2024 NYC DOB JOB NUMBER M01031744-I1, AND FAILURE TO COMPLY WITH CODES 3307.6.2 FOR ADDITIONAL COVERAGE (EXTENSION 5 FEET) ON BOTH SIDES
#39534952R
Feb 13, 2025
DEFAULT
$5,000
Aug 23, 2024Construction CLASS - 2
AT TIME OF INSPECTION OF 4 STORY RESIDENTIAL BUILDING OBSERVED SIDEWALK SHED IN PLACE WITHOUT INFORMATION PANEL ON PARAPET.PROVIDE INFORMATION PANEL
#39531735R
Oct 31, 2024
DEFAULT
$3,125
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (4) · C 1 · B 3 · A 0
IssuedClassViolationCorrect by
Oct 8, 2019C§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING ASSEMBLY AT FRONT ENTRANCE DOOR TO BUILDINGOct 16, 2019
Sep 9, 2019B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT VESTIBULE AREA AT PUBLIC HALL, 1st STORYOct 14, 2019
Aug 20, 2019B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AT VESTIBULE DOOR AT PUBLIC HALLSep 24, 2019
Aug 18, 2008BD26-10.01 ADM CODE REPLACE WITH NEW THE MISSING FIRE DOOR CELLAR AT CENTER TO REAR SECTION.Sep 22, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 1:05 PM ET. BBL 1012130023.

Look up another building