Queens · Block 9431 · Lot 1 · 11419

113-06 101 Avenue

5 floors · 18,116 sq ft · built 2023 · class M9 · owner of record: Baba Makhan Shah Lobana Sikh Center Inc.

18open violations
$20,625ECB/OATH penalties owed
0HPD class C (immediately hazardous)
64dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 64 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)

Open violations

ECB / OATH (14) · $20,625 owed
IssuedViolationHearingBalance
Jul 13, 2026Construction CLASS - 2
OBSERVED: ACTIVE SITE UPON REQUEST FOR SSP AND SUPER,ORIENTATION,PRESHIFT, AND TOOL BOX LOG BOOKS NONE WAS PROVIDED CONTRARY TO BUILDING CODE . STOP ALL WORK UNDER PERMIT 421133534MAINTAIN ALL DOCUMENTATION ON
#39556549Y
Mar 16, 2027
PENDING
$1,250
Jul 13, 2026Construction CLASS - 1
OBSERVED: SITE WITH HOUSEEKEEPING ISUES AT GROUND LEVEL NOTED GREAT AMOUNT OF BLACK PLASTIC BAGS,AT 5TH FLOOR ROOF PILE OF BROKEN TILES ,STERAFOAM , PIECES OF SHETROCK AND WOOD PALETS,DEBRIS OF CONSTRUCTION MAT
#39556550L
Mar 16, 2027
PENDING
$2,500
Jul 13, 2026Unknown CLASS - 2
OBSERVED ACTIVE SITE POURING CONCRETE AT CELLAR AND PLACED TILE ON 5TH FLOOR , REQUESTED FOR RAGHBIR SINGH CS OR CP NO ONE KNOWS THEM, THEY WAS'ENT PRESENT., CS FAILURE TO PERFORM DUTIES ,FAILURE TO DESIGNATE
#39556545R
Mar 23, 2027
PENDING
$5,000
Jul 13, 2026Unknown CLASS - 2
PROPOSED 5 STORY NEW BUILDING, ACTIVE JOB SITE, I OBSERVED WORKER JOSE MARINO IN 5TH FLOOR PERFORMING TILE PLACEMENT. UPON REQUEST FOR THE REQUIRED SAFETY TRAINING CONNECT CARD, SST NONE WAS PROVIDED.THIS TRAI
#39556552P
Mar 16, 2027
PENDING
$2,500
Jun 25, 2024Construction CLASS - 2
TEMPORARY CONSTRUCTION EQUIPMENT/INSTALLATION ON SITE EXPIRED PERMIT SIDE. AS NOTED: AT TIME OF INSPECTION CONSTRUCTION SITE WAS OF A PROPOSED 5 STORY BUILDING WAS CLOSED. OBSERVED CONSTRUCTION SIDEWALK SHED WI
#35685457M
Sep 3, 2024
DEFAULT
$0
Jun 25, 2024Construction CLASS - 2
TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT. AS NOTED: AT TIME OF INSPECTION CONSTRUCTION SITE WAS CLOSED. OBSERVED CONSTRUCTIONPLYWOOD FENCE PERMIT HAD EXPIRED ON 02/01/2024 WITH PERMIT #Q00473674-
#35685456K
Sep 3, 2024
DEFAULT
$0
Feb 27, 2024Construction CLASS - 2
TEMPORARY CONSTRUCTION EQUIPMENT ONSITE-EXPIRED PERMIT.AS NOTED:AT TIME OF INSPECTION CONSTRUCTION SITE WAS CLOSED,OBSERVED CONSTRUCTION PLYWOOD FENCE PERMIT HAD EXPIRED ON 02/01/2024 WITH PERMIT#Q00473674-I1-F
#35682204K
May 7, 2024
DEFAULT
$6,250
Jan 12, 2024Construction CLASS - 2
FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAP. 33.AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE IN WHICH WAS ALREADY AT THE 5TH FLOOR LEVEL. OBSERVED STAYFORMS INSTALLED ADJ
#35679780L
Apr 16, 2024
ADMIT/IN-VIO
$0
Dec 21, 2023Construction CLASS - 2
GC FAILED TO FILE COC FOR A IMMEDIATE HAZARDOUS VIOLATION. CONDITION MUST CORRECT AND NEED TO SUBMIT COC IMMEDIATELY. VIOLATION # 39521258Y WAS ISSUED FOR MISSING/ INADEQUATE OHP FOR ADS AT EXPOS 4. CORRECT CO
#39524276L
Jul 22, 2024
DEFAULT
$1,875
Nov 13, 2023Construction CLASS - 1
DURING THE INSPECTION OF A NEW 5-STORY BUILDING, IT WAS OBSERVED THAT STRUCTURAL WORK WAS UNDERWAY. HOWEVER UPON CHECKING THE DEPARTMENT OF BUILDINGS (DOB) WEBSITE, IT WAS DETERMINED THAT NO PERMITS HAD BEEN IS
#39523344J
Feb 20, 2024
IN VIOLATION
$1,250
Aug 31, 2023Construction CLASS - 2
INADEQUATE FIRE EXTINGUISHERS//AT THE TIME OF MY INSPECTION OF ACTIVE CONSTRUCTION JOB SITE I OBSERVED 2FIRE EXTUINGUISHERS-WITH EXPIRED TAGS(LAST SERVICED FEBRUARY 2022),NOT MONTHLY CHECKED,1 OF DIAL SHOWING F
#39521261P
Dec 5, 2023
ADMIT/IN-VIO
$0
Aug 31, 2023Construction CLASS - 1
INADEQUATE OVERHEAD PROTECTIO/AT THE TIME OF MY INSPECTION I OBSERVED BUILDING IN SUPERSTRUCTURE PHASE AT 2ND FLOOR LEVEL -OBSERVED AT EXP#4 NO OVERHEAD PROTECTION FOR ADJOINING PROPERTY YARD WHILE WORK BEING P
#39521258Y
Dec 5, 2023
ADMIT/IN-VIO
$0
Apr 5, 2023Construction CLASS - 2
FAILURE TO PROVIDE SPECIAL INSPECTION OF CONCRETE PLACEMENT TR1 AND TR2 CONCRETE SAMPLING AND TESTING.AS NOTED AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 5 STORY BUILDING OBSERVED A CONCRETE POUR
#35670882L
Dec 19, 2023
ADMIT/IN-VIO
$0
Jun 3, 2006Unknown Hazardous
NOTED:ACCESS DENIED.VIOLATION IN BASED UPON NO RECORD OF CORRECTION FOR#34442501X ON 11/29/04 FOR WORK W/O A WORK PERMIT.ERECTED AT THE CELLAR LEVEL.1 APT.WITH 3 PIECE BATH.INSTALLING WASTE + WATER LINES.
#34526052J
Jul 18, 2006
WRITTEN OFF
$0
DOB (1)
IssuedViolationStatus
Nov 22, 2023FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00264
DOB VIOLATION - ACTIVE
DOB NOW Safety (5)
IssuedViolationStatus
Aug 19, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
Nov 22, 2023AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 19, 2026DOB SafetyAEUHAZ: Open
Jul 13, 2026ECBConstruction: OBSERVED: ACTIVE SITE UPON REQUEST FOR SSP AND SUPER,ORIENTATION,PRESHIFT, AND TOOL BOX LOG BOOKS NONE WAS PROVIDED CONTRARY TO BUILDING CODE . STOP ALL WORK UNDER PERMIT 421133534MAINTAIN ALL DOCUMENTATION ONOpen
Jul 13, 2026ECBConstruction: OBSERVED: SITE WITH HOUSEEKEEPING ISUES AT GROUND LEVEL NOTED GREAT AMOUNT OF BLACK PLASTIC BAGS,AT 5TH FLOOR ROOF PILE OF BROKEN TILES ,STERAFOAM , PIECES OF SHETROCK AND WOOD PALETS,DEBRIS OF CONSTRUCTION MATOpen
Jul 13, 2026ECBUnknown: OBSERVED ACTIVE SITE POURING CONCRETE AT CELLAR AND PLACED TILE ON 5TH FLOOR , REQUESTED FOR RAGHBIR SINGH CS OR CP NO ONE KNOWS THEM, THEY WAS'ENT PRESENT., CS FAILURE TO PERFORM DUTIES ,FAILURE TO DESIGNATEOpen
Jul 13, 2026ECBUnknown: PROPOSED 5 STORY NEW BUILDING, ACTIVE JOB SITE, I OBSERVED WORKER JOSE MARINO IN 5TH FLOOR PERFORMING TILE PLACEMENT. UPON REQUEST FOR THE REQUIRED SAFETY TRAINING CONNECT CARD, SST NONE WAS PROVIDED.THIS TRAIOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 8:30 AM ET. BBL 4094310001.

Look up another building