4 floors · 36 apartments · 4,503 sq ft · built 2019 · class R1 · owner of record: 1129 Halsey Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 63 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 307 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 25, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. FAILURE TO PROVIDE THE REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR AS PER BC1021.1(2014); BC1006.3(2022) AND 27-366 FOR TRANSIENT USE AT APARTMENT #35679292M | Jan 28, 2025 IN VIOLATION | $2,500 |
| Jun 25, 2024 | Construction CLASS - 1 BC907.2.8. FAILURE TO PROVIDE THE REQUIRED CLASS "J" FIRE ALARM SYSTEMFOR TRANSIENT USE AT APARTMENT 1. REMEDY: DISCONTINUE ILLEGAL OCCUPANCY. #35679293Y | Jun 12, 2025 IN VIOLATION | $2,500 |
| Sep 11, 2018 | Construction CLASS - 2 BC3302.2.3 NO TEMPORARY LIGHTING. AT TIME OF INSPECTION OF A 4 STY BUILDING, OBSERVED NO TEMPORARY LIGHTING THROUGHOUT ENTIRE BUILDING. NO TEMPORARY LIGHTING CREATES A HAZARD FOR A TRIP AND FALL ACCIDENT. ALSO #35350833M | Mar 6, 2019 IN VIOLATION | $625 |
| Sep 11, 2018 | Construction CLASS - 1 SCAFFOLD MAINTENANCE. AT TIME OF INSPECTION OF A 4 STORY BUILDING. OBSERVED SCAFFOLDING AT EXP 2 & 4 THAT WAS COVERED IN DEBRIS, NETTING WAS MISSING AND PLANKING WAS NOT FULL OR SECURED DOWN CREATING A HAZARD F #35350834Y | Mar 4, 2019 IN VIOLATION | $2,500 |
| Sep 11, 2018 | Construction CLASS - 2 BC3309.10 ROOF PROTECTION, EXP #2. AT TIME OF INSPECTION ON AN ACTIVE 4 STORY BUILDING. UPON INSPECTION, I OBSERVED THAT ADJACENT PROPERTY ROOF AT EXP #2 WAS NOT PROTECTED WITH ANY ROOF PROTECTION, NO ROOF PROT #35350835X | Mar 6, 2019 IN VIOLATION | $625 |
| Sep 11, 2018 | Site Safety CLASS - 1 BC3301.7 NO DESIGN DRAWING. AT TIME OF INSPECTION ON AN ACTIVE 4 STY BUILDING. OBSERVED AT EXP, SCAFFOLD BUILT ON AN UNDESIGNED PLATFORM, BUILT ON ADJACENT PROPERTY ROOF..NO DESIGN DRAWING CREATES A HAZARD FOR #35350832K | Mar 6, 2019 IN VIOLATION | $1,250 |
| Sep 11, 2018 | Construction CLASS - 2 STAIR FILLING. AT TIME OF INSPECTION OF A 4 STY BUILDING UPON INSPECTION, I OBSERVED STAIR LANDINGS WITH NO FILL-INS CREATING A POTENTIAL TRIP HAZARD, LANDING VOID WAS 1.5 INCHES DEEP AND UNEVEN CREATING A HAZA #35350837J | Mar 6, 2019 IN VIOLATION | $625 |
| Sep 11, 2018 | Site Safety CLASS - 1 NO DESIGNATED SUPER ON SITE AT TIME OF INSPECTION ON AN ACTIVE 4 STY SITE UPON ENTRY I ASKED TO SPEAK W/SUPER OR DESIGNATED COMPETENT PERSONNONE WERE AVAILABLE JOB SITE WAS RUNNING W/NO SUPERVISION. STOP ALL WO #35350828H | Jul 1, 2019 IN VIOLATION | $10,000 |
| Sep 11, 2018 | Construction CLASS - 1 WORK W/O A PERMIT/EXP PERMIT. AT TIME OF INSPECTION OF AN ACTIVE 4 STYBLDG UPON ARRIVAL I OBSERVED WORKERS DOING ALL KINDS OF WORK & A LOOK IN BIS HAD ALTERED ME THAT BLDG PERMIT HAD EXP ON 7/18/18 & WORK WAS #35350831Z | Mar 4, 2019 IN VIOLATION | $800 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 7:40 PM ET. BBL 3034037501.