5 floors · 49 apartments · 45,300 sq ft · built 1927 · class C7 · owner of record: 1125-1127 S Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 45,300 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 21, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN; NOTED SOLAR PANELS WERE INSTALLED ON THE ROOFTOP UNDER PERMIT X01260995-I1-SL. HOWEVER, THERE IS NO CLEAR, UNOBSTRUCTED, DIRECT, OR NATURAL PATH TO THE FIRE ESCAPES. ADDITIONALLY, METAL PIP #39197034N | Apr 19, 2027 PENDING | $2,500 |
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #907555. REMEDY: FILE ACCEPTABLE REPORT. #37036840H | Feb 22, 2027 PENDING | $1,250 |
| May 21, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDINGS IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED, AT PAPAYA RESTAURANT'S BATHROOM AND STORAGE ROOM'S CELLING COLLAPSED DUE TO WATER LEAKING FROM THE TOP., REPAIR AND/OR RE #39041536M | Oct 1, 2021 IN VIOLATION | $0 |
| Mar 30, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER I OBSERVED ON GROUND FLOOR IN PAPAYE RESTAURANT IN THE BATHROOM UNDER THE SINK WASTE LINE IS LEAKING. ALSO SINK IS NOT CAULKED. IN THE KITCHEN AREA USING PV #39038571K | Jun 18, 2021 IN VIOLATION | $0 |
| Dec 5, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. AS NOTED EXPOSURE 1 VERTICAL CRACK ON PARAPET WALL,DAMAGED MORTAR JOINTS WOOD ON WINDOW SILL,OBJECT ON FIRE ESCAPE. EXPOSURE 3 SPALLING BRICK,VERT #35444862Z | Jan 31, 2020 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 3, 2023 | HAZARDOUS CONDITION (FACADE) CYCLE 9A UNSAFE REPORT FILED #911283 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00807 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 3, 2023 | Facades FISPHAZ CYCLE 9A UNSAFE REPORT FILED | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 18, 2026 | B | Apt 4B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 4B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' ORIGINAL VIOLATION 18947894 ISSUED 12-MAY-26 HAS BEEN UPGRADED TO CLASS B PER ADMIN | Oct 23, 2026 |
| Jul 2, 2026 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SOLAR PANELS IMPEDING EGRESS FROM BULKHEADS TO FIRE ESCAPES AT ROOF | Oct 5, 2026 |
| Jul 2, 2026 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SOLAR PANELS IMPEDING EGRESS FROM BULKHEADS TO FIRE ESCAPES AT ROOF | Jul 8, 2026 |
| Jun 30, 2026 | B | Apt 5C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE DOOR TO SOUTH WALL PANEL IN THE FOYER LOCATED AT APT 5C, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Aug 4, 2026 |
| Jun 3, 2026 | C | Apt 1C · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES GAS RANGE IN THE KITCHEN LOCATED AT APT 1C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH | Jun 9, 2026 |
| Jun 3, 2026 | C | Apt 1C · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GAS SHUT OFF VALVE BEHIND GAS RANGE IN THE KITCHEN LOCATED AT APT 1C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH | Jun 9, 2026 |
| May 21, 2026 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Jun 16, 2026 |
| Oct 9, 2025 | C | 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, G | Nov 4, 2025 |
| Feb 3, 2025 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''1125'', AT SOUTH | Mar 1, 2025 |
| Jan 22, 2025 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''1125'' | Feb 17, 2025 |
| Dec 20, 2024 | B | Apt 2C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 2C, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Jan 24, 2025 |
| Nov 15, 2024 | B | Apt 2C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 2C, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''1127'' | Dec 20, 2024 |
| Oct 21, 2024 | C | Apt 3A · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FURNITURES (BED) OBSTRUCTION WINDOW LEADING TO FIRE ESCAPE IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Oct 27, 2024 |
| Apr 16, 2024 | B | Apt 3A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 3A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | May 21, 2024 |
| Apr 10, 2024 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''1125'', AT SOUTH | May 6, 2024 |
| Jan 15, 2024 | C | Apt 4E · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Feb 8, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Closed |
| Sep 18, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 4B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' ORIGINAL VIOLATION 18947894 ISSUED 12-MAY-26 HAS BEEN UPGRADED TO CLASS B PER ADMIN | Open |
| Jul 21, 2026 | ECB | Construction: FAILURE TO MAINTAIN; NOTED SOLAR PANELS WERE INSTALLED ON THE ROOFTOP UNDER PERMIT X01260995-I1-SL. HOWEVER, THERE IS NO CLEAR, UNOBSTRUCTED, DIRECT, OR NATURAL PATH TO THE FIRE ESCAPES. ADDITIONALLY, METAL PIP | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 10:25 AM ET. BBL 2024560075.