Brooklyn · Block 1390 · Lot 51 · 11213

1123 Eastern Parkway

2 floors · 3,500 sq ft · built 1900 · class M3 · owner of record: St Matthews Rc Ch

7open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
69dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 69 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-05 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (7)
IssuedViolationStatus
Sep 16, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS: BROKEN WINDOW PANES 1ST FLOOR AT EXPOSURE 2,3 & 4. ALSO DETECTED STEEPLE ROOF, SPALLING, STEP CRACK AND DAMAGED OPEN JOINTS. REMEDY: REPAIR AND/OR REPLACE
#SR0801NS
DOB VIOLATION - ACTIVE
Nov 20, 2025CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE. NOTED AT TIME OF INSPECTION OBSERVED DAMAGED CORNICE OR FLASHING AT PARAPET LEVEL ALSO VERTICAL STEP CRACK AT EXPOSURE THREE. REMEDY: REPAIR AND/OR REPLACE
#SR0801BB
DOB VIOLATION - ACTIVE
May 11, 2012ELEVATOR

#9027/424277
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#28626
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#31350
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#28627
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#31349
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 16, 2026DOBCONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS: BROKEN WINDOW PANES 1ST FLOOR AT EXPOSURE 2,3 & 4. ALSO DETECTED STEEPLE ROOF, SPALLING, STEP CRACK AND DAMAGED OPEN JOINTS. REMEDY: REPAIR AND/OR REPLACEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 5:07 AM ET. BBL 3013900051.

Look up another building