2 floors · 1 apartments · 2,080 sq ft · built 1931 · class S1 · owner of record: 1121 39th Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2025-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 430 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-15 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #11293 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #31713 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #17110 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 24, 2025 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Jun 29, 2026 | B | Apt 2NDFL · § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT THE SINK IN THE KITCHEN LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 3, 2026 |
| Jun 29, 2026 | B | Apt 2NDFL · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 3, 2026 |
| Jun 29, 2026 | A | Apt 2NDFL · § 27-2010, 2011, 2012 ADMIN CODE: CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT CAULKING, GROUTS JOINTS OF THE CERAMIC TILES AT SOUTH, WEST AND EAST WALLS AROUND BATHTUB, IN THE BATHROOM LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 2, 2026 |
| Jun 29, 2026 | B | Apt 2NDFL · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCHSET ASSEMBLY OF THE DOOR LOCKING, AT APARTMENT DOOR, IN THE ENTRANCE LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 3, 2026 |
| Jun 29, 2026 | B | Apt 2NDFL · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 30 SQUARE FEET AT THE CEILING IN THE BATHROOM LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 3, 2026 |
| Jun 29, 2026 | C | Apt 2NDFL · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 27, 2026 |
| Jun 29, 2026 | B | Apt 2NDFL · § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT THE SINK IN THE KITCHEN LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 3, 2026 |
| Dec 5, 2025 | A | Apt '2 · § 27-2010, 2011, 2012 ADMIN CODE: CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT GROUT JOINTS OF THE CERAMIC TILES AT EAST AND SOUTH WALLS AROUND BATHTUB, IN THE BATHROOM LOCATED AT APT '2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 10, 2026 |
| Dec 5, 2025 | B | Apt '2 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT '2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 9, 2026 |
| Dec 5, 2025 | C | Apt '2 · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT '2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 5, 2025 |
| Dec 5, 2025 | C | Apt '2 · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT '2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 5, 2025 |
| Dec 5, 2025 | B | Apt '2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT '2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 9, 2026 |
| Dec 5, 2025 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Mar 10, 2026 |
| Dec 5, 2025 | B | Apt '2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 30 SQUARE FEET AT THE CEILING, EAST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT '2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 9, 2026 |
| Mar 10, 2025 | C | Apt 2FL · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 9, 2025 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 7:30 PM ET. BBL 3052900023.