| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 311 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-09 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 5, 2026 | Construction CLASS - 1 NO C OF C SUBMITTED FOR CLASS 1 VIOLATION #39185271Z ISSUED 4/20/2026, CITING CONDITIONS CONSISTENT WITH ORIGINAL VIOLATION #39101167H ISSUED 12/12/2023 FOR ROOF A/C INSTALLATION. NO ACCESS TO VERIFY THE A/C IN #39206673L | Dec 10, 2026 PENDING | $6,250 |
| Oct 5, 2026 | Construction CLASS - 1 NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE AS PER COMMISSIONER'S REQUEST FOR CLASS 1 WORK-WITHOUT-PERMIT VIOLATION #39191167H ISSUED 12/12/2023, CITING TWO A/C UNITS INSTALLED ON THE ROOF WITHOUT A PERMIT. #39206671H | Dec 10, 2026 PENDING | $2,500 |
| Oct 5, 2026 | Construction CLASS - 2 UNABLE TO GAIN ACCESS. NO CERTIFICATE OF CORRECTION SUBMITTED FOR CLASS 1 FAILURE-TO-MAINTAIN VIOLATION #39101168J ISSUED 12/12/2023, CITING POORLY MAINTAINED ROOF PLYWOOD INSTALLATION. VIOLATION REMAINS OPEN P #39206672J | Dec 10, 2026 PENDING | $1,250 |
| Apr 20, 2026 | Construction CLASS - 1 NO CERTIFICATE OF CORRECTION ON FILE AS PER REQUEST OF COMMISSIONER FOR CLASS 1 WORK WITH OUT PERMIT VIOLATION #39101167H ISSUED ON 12/12/2023 FOR A/C UNITS INSTALLED AT ROOF ALONG WITH KITCHEN, VENT, & EXHAUST #39185271Z | Jun 25, 2026 DEFAULT | $12,500 |
| Apr 20, 2026 | Construction CLASS - 2 NO ACCESS. CERTIFICATE OF CORRECTION NOT ON FILE FOR CLASS 1, FAILURE TO MAINTAIN ROOF AND BULKHEAD VIOLATION#39101168J ISSUED 12/12/2023., FILE A CERTIFICATE OF CORRECTION #39185272K | Jun 25, 2026 DEFAULT | $6,250 |
| Dec 12, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN, POORLY MAINTAINED ROOF. OBSERVED NON TREATED/NON SECURE PLYWOOD INSTALLED ON EXISTING ROOF, CAUSING ROOF TO BE SOFT AND SLIPPERY. SMAE PLYWOOD INSTALLED ON BULKHEAD, REPAIR AND/REPLACE; REP #39101168J | Aug 1, 2024 DEFAULT | $6,250 |
| Dec 12, 2023 | Construction CLASS - 1 WORK WITHOUT A PERMIT. OBSERVED ON ROOF, 2 A/C UNITS INSTALLED WITHOUT A PERMIT. KICHEN VENT/EXHAUST INSTALLED WITHOUT A PERMIT, OBTAIN PERMIT; OBTAIN PERMIT #39101167H | Mar 21, 2024 IN VIOLATION | $2,500 |
| Jul 6, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:PROVIDE REQUIREDCORRIDOR/STAIRCASE.NOTED:UPON INSPECTION OBSERVED MULTIPLE PIECES OF FURNITURE EXCESSIVE DEBRIS AND PROPANE TANK,LEADING TO AND ON ROOF OF B #35333075H | Feb 25, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 17, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00004 | DOB VIOLATION - ACTIVE |
| Mar 20, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00002 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Apr 17, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 20, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 5, 2026 | ECB | Construction: NO C OF C SUBMITTED FOR CLASS 1 VIOLATION #39185271Z ISSUED 4/20/2026, CITING CONDITIONS CONSISTENT WITH ORIGINAL VIOLATION #39101167H ISSUED 12/12/2023 FOR ROOF A/C INSTALLATION. NO ACCESS TO VERIFY THE A/C IN | Open |
| Oct 5, 2026 | ECB | Construction: NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE AS PER COMMISSIONER'S REQUEST FOR CLASS 1 WORK-WITHOUT-PERMIT VIOLATION #39191167H ISSUED 12/12/2023, CITING TWO A/C UNITS INSTALLED ON THE ROOF WITHOUT A PERMIT. | Open |
| Oct 5, 2026 | ECB | Construction: UNABLE TO GAIN ACCESS. NO CERTIFICATE OF CORRECTION SUBMITTED FOR CLASS 1 FAILURE-TO-MAINTAIN VIOLATION #39101168J ISSUED 12/12/2023, CITING POORLY MAINTAINED ROOF PLYWOOD INSTALLATION. VIOLATION REMAINS OPEN P | Open |