4 floors · 154,051 sq ft · built 1993 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 154,051 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 428 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 15820). Agency page | Dec 31, 2030 in 1524 days | Next due 2030 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-11 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 26, 2026 | Construction CLASS - 2 REISSUE ECB #35692073Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT ALL LEVELS IN CORRIDORS MISSING CEILING TILES. REMEDY: REPAIR AND/OR REPLACE. #35727378R | May 15, 2026 POP/IN-VIO | $0 |
| Mar 26, 2026 | Construction CLASS - 2 REISSUE ECB #35692071P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. PROVIDE REQUIRED CORRIDOR WIDTH PER BC 1016.2; 27-369. REMEDY:PROVIDE PROPER CORRIDOR WIDTH. #35727379Z | May 15, 2026 POP/IN-VIO | $0 |
| Mar 26, 2026 | Construction CLASS - 2 REISSUE ECB #35692074K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: SMOKE DOORS ON 3RD FLOOR CORRIDOR BY 316, 2 FLOOR CORRIDORBY 209, 217, 1ST FLOOR CORRIDOR BY 102, 108, 111, 128, AND BY EXIT #35727377P | Apr 20, 2026 POP/IN-VIO | $0 |
| Mar 27, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 3 FLOOR CORRIDOR BY 316, 2FL. CORRIDOR BY 209, 217, 1FL. CORRIDOR BY 102, 108, 111, 128 AND BY EXIT 3 DOORS ARE NOT CLOSING PROPERLY. REMEDY: REPA #35692074K | Apr 23, 2025 POP/IN-VIO | $0 |
| Mar 27, 2025 | Construction CLASS - 2 REISSUE #35678751H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT ALL LEVELS IN CORRIDORS AT CEILINGS MISSING CEILING TILES. REMEDY: MAKE NECESSARY REPAIRS. #35692073Z | Apr 23, 2025 POP/IN-VIO | $0 |
| Mar 27, 2025 | Construction CLASS - 2 REISSUE #35678753L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: PROVIDE REQUIRED CORRIDOR WITH PER BC 1016.2; 27-369. NOTED AT CELLAR CORRIDOR WIDTH BLOCKED BY PILES OF BOXES AND MISCELLANEOUS ITEMS #35692071P | Apr 23, 2025 POP/IN-VIO | $0 |
| Oct 10, 2024 | Elevators CLASS - 1 : FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. SERVICE ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-987. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE, CREATING A HAZARDOUS CONDITION PER 1RCNY #39127189Y | Oct 18, 2024 POP/IN-VIO | $0 |
| Jul 10, 2024 | Elevators CLASS - 1 IN CAR EMERGENCY STOP SWITCH BROKEN (CU). IN CAR RUN STATION UP BUTTON MISSING (CU). #39118865X | Jul 27, 2024 POP/IN-VIO | $0 |
| Apr 22, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANER:PROVIDE REQUIRED CORRIDOR WIDTH PER BC 1006.2;27-369.NOTED:AT CELLAR CORRIDOR WIDTH BLOCKED BY PILES OF BOXES ALL OVER THE CORRIDOR CREATING A HAZARD IN CASE #35678753L | Jul 3, 2024 POP/IN-VIO | $0 |
| Apr 22, 2024 | Construction CLASS - 2 REISSUE#35671768M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:MISSING CEILING TILES IN THE CORRIDORS AND TEACHER LUNCH ROOM THROUGHOUT THE BUILDING.REM:MAKE NECESSARY REPAIRS. #35678751H | Jul 3, 2024 POP/IN-VIO | $0 |
| Apr 13, 2023 | Construction CLASS - 2 REISSUE#35654972P(4/13/2022)FAILURE TO BUILDING IN CODE-COMPLIANT MANNER:ONGOING CONSTRUCTION ACTIVITY IN FACADE AND ALARM SYSTEMS WORK.SECTION OF WALL AND CEILING MISSING FILES,PLYWOOD PATCHES DRYWALLS DAMAGE #35671768M | Aug 15, 2023 POP/IN-VIO | $0 |
| Apr 13, 2022 | Construction CLASS - 2 REISSUE #35486809P NOTED:DUE TO RECENT & ONGOING FIRE ALARM WORK SECTIONS OF WALLS & CEILINGS HAVE DAMAGE MISSING & AREAS THAT HAVE BEEN PATCHED UP WITH PLYWOD.REMEDY:REPAIR AND/OR REPLACE #35654972P | Jul 26, 2022 POP/IN-VIO | $0 |
| Apr 30, 2020 | Construction CLASS - 2 FAILURE TO MAINTAIN BUIDLING IN CODE COMPLIANT MANNER NOTED AT TIME OF INSPECTION IT WAS OBSERVED THAT AN ONGOING (FIRE ALAMR WORK )JOB HAS LEFT SEVERAL LOCATIONS WITH OPEN CEILING SOME OPENING HAVE BEEN PATCHE #35486809P | Aug 25, 2020 POP/IN-VIO | $0 |
| Jan 15, 2020 | Elevators CLASS - 2 11I10: (11,I,10) CAR STATION BUTTON DAMAGE #38272982Y | Apr 14, 2020 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 10:01 AM ET. BBL 4158200001.