5 floors · 38,798 sq ft · built 2014 · class H3 · owner of record: Marino Realty Ny Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 38,798 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 6, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 39152366K., FILE A CERTIFICATE OF CORRECTION #39206930N | Dec 15, 2026 PENDING | $1,250 |
| Oct 6, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 39177894P., FILE A CERTIFICATE OF CORRECTION #39206931P | Dec 15, 2026 PENDING | $1,250 |
| Feb 19, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED HOLE PENETRATIONS COVERED WITH UNPERMITTED PLASTIC ACCESS PANELS. PLASTIC NOT FIRE RATED. POTENTIAL HAZARD. LOCATED ON THE 1ST FLOOR LOBBY 3RD AND #39177894P | Nov 17, 2026 PENDING | $6,250 |
| Jun 30, 2025 | Construction CLASS - 1 UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT. OBSEVERED EXCESSIVE UNSAFE STORAGE UNDERNEATH STAIRCASE A. (RUGS, FLOORING, BOXES, WOOD) POTENTIAL FIRE HAZARD., MAINTAIN STORAGE IN COMPLIANCE WITH FIRE CO #39152366K | Apr 21, 2026 IN VIOLATION | $0 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 6, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 39152366K., FILE A CERTIFICATE OF CORRECTION | Open |
| Oct 6, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 39177894P., FILE A CERTIFICATE OF CORRECTION | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 12:48 PM ET. BBL 4020130026.