2 floors · 15,000 sq ft · built 1989 · class H4 · owner of record: Shri Sidhdhy Vanayak,Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-19 (Accepted). Agency page | Dec 31, 2026 in 42 days | 2 of 2 without an accepted 2026 report yet |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 407 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 12, 2026 | Construction CLASS - 1 OBSERVED IN BASEMENT, NO SPRINKLER COVERAGE IN STORAGE ROOM, E BIKE BEING STORED. FAILURE TO HAVE UPDATED MONTHLY INSPECTION ON SPRINKLER SYSTEM WHICH IS CONTRARY TO CODE SECTION BC 101.4.5, REPAIR AND/REPLACE #39180256H | Dec 11, 2026 | $2,500 |
| Mar 12, 2026 | Construction CLASS - 1 OBSERVED THROUGHOUT THE BUILDING PIPE PENETRATION WITH NO FIRE STOP AND SLOP SINKS INSTALLED WITH PVC WASTE LINES. ON THE FIRST FLOOR SLOP SINK INSTALLED WITHOUT A TRAP ON THE WASTE LINE. IN BASEMENT SPRINKLER #39180255X | Dec 11, 2026 | $2,500 |
| Mar 12, 2026 | Construction CLASS - 1 OBSERVED IN BASEMENT JIMS CAPS FERNCO COUPLINGS ARE INSTALLED ON WASTE LINES. IN THE BOILER ROOM FUTURE ON GAS LINE, LACK OF SUPPORT ON SPRINKLER SYSTEM IN LAUNDRY ROOM GAS DRYERS EXHAUST VENT NOT USING THE PRO #39180257J | Dec 11, 2026 | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #15684 | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 2:27 AM ET. BBL 2047050011.