3 floors · 3 apartments · 3,400 sq ft · built 1988 · class C0 · owner of record: Kamara, Amadu A
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 408 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 6, 2026 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR DEPARTMENT RECORDS. AT TIME OF INSPECTION, OBSERVED BASEMENT ALTERED AND ARRANGED WITH THREE SINGLE-ROOM OCCUPANCIES EQUIPPED WITH DEADBOLT #39187406X | Jan 29, 2027 PENDING | $6,250 |
| May 18, 2023 | Construction CLASS - 1 OCCUPANCY IN CONTRARY TO THAT ALLOWED BY C/O AND/OR DEPARTMENT OF BUILDING RECORD. ILLEGAL CLASS "A" APARTMENT CREATED AT THE CELLAR WITH ONE FULL BATHROOM AND KITCHEN VACATE IS WARRANTED DUE TO NO 2ND MEANS OF #35482592P | Apr 30, 2024 IN VIOLATION | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 30, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 3, 2026 |
| Jun 5, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 8, 2025 |
| Apr 2, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 6, 2024 |
| Jun 12, 2023 | C | Apt BASEME · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SUMP-PUMP AT FLOOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 18, 2023 |
| Jun 12, 2023 | B | Apt BASEME · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 15 SQFT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 17, 2023 |
| Jun 12, 2023 | C | Apt BASEME · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ALL ROOMS THRU-OUT IN THE ENTIRE APARTMENT LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 18, 2023 |
| Jun 12, 2023 | A | Apt BASEME · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE AT FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 15, 2023 |
| Jun 12, 2023 | B | Apt BASEME · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 17, 2023 |
| Jun 12, 2023 | B | Apt BASEME · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 17, 2023 |
| Jun 12, 2023 | A | Apt BASEME · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT WASHBASIN CABINET DOORS IN THE BATHROOM LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 15, 2023 |
| Jun 12, 2023 | B | Apt BASEME · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 17, 2023 |
| Jun 12, 2023 | B | Apt BASEME · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 17, 2023 |
| May 22, 2023 | B | Apt CELLAR · § 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE, GAS RANGE INSTALLED AT KITCHEN CREATED AT ILLEGAL CLASS A CELLAR APARTMENT IN THE ENTIRE APARTMENT LOCATED AT CELLAR APT CELLAR | Jun 26, 2023 |
| May 22, 2023 | B | Apt CELLAR · § 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION 3 STORY, 3 FAMILY MUTIPLE DWELLING BUILDING ILLEGALLY CONVERTED INTO 3 STORY 4 FAMILY MULTIPLE DWELLING CONSISTING OF ILLEGAL CLASS A CELLAR APA | Jun 26, 2023 |
| May 22, 2023 | B | Apt CELLAR · § 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS BEHIND WALLS AND UNDER FLOOR AT BATHROOM WITHIN ILLEGAL CLASS A CELLAR APARTMENT IN THE ENTIRE APARTMENT LOCATED AT CELLAR APT CELLAR | Jun 26, 2023 |
| Mar 16, 2023 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jun 19, 2023 |
| Feb 17, 2022 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | May 23, 2022 |
| Apr 2, 2021 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 6, 2021 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 1:19 PM ET. BBL 2049030058.