Bronx · Block 4903 · Lot 58 · 10466

1118 East 225 Street

3 floors · 3 apartments · 3,400 sq ft · built 1988 · class C0 · owner of record: Kamara, Amadu A

21open violations
$8,750ECB/OATH penalties owed
2HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 43 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 59 days
Annual
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 408 days
Next cycle year 2027

Open violations

ECB / OATH (2) · $8,750 owed
IssuedViolationHearingBalance
May 6, 2026Construction CLASS - 1
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR DEPARTMENT RECORDS. AT TIME OF INSPECTION, OBSERVED BASEMENT ALTERED AND ARRANGED WITH THREE SINGLE-ROOM OCCUPANCIES EQUIPPED WITH DEADBOLT
#39187406X
Jan 29, 2027
PENDING
$6,250
May 18, 2023Construction CLASS - 1
OCCUPANCY IN CONTRARY TO THAT ALLOWED BY C/O AND/OR DEPARTMENT OF BUILDING RECORD. ILLEGAL CLASS "A" APARTMENT CREATED AT THE CELLAR WITH ONE FULL BATHROOM AND KITCHEN VACATE IS WARRANTED DUE TO NO 2ND MEANS OF
#35482592P
Apr 30, 2024
IN VIOLATION
$2,500
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
Active
HPD (18) · C 2 · B 8 · A 8
IssuedClassViolationCorrect by
Apr 30, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 3, 2026
Jun 5, 2025A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Sep 8, 2025
Apr 2, 2024A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 6, 2024
Jun 12, 2023CApt BASEME · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SUMP-PUMP AT FLOOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 18, 2023
Jun 12, 2023BApt BASEME · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 15 SQFT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 17, 2023
Jun 12, 2023CApt BASEME · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ALL ROOMS THRU-OUT IN THE ENTIRE APARTMENT LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 18, 2023
Jun 12, 2023AApt BASEME · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE AT FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 15, 2023
Jun 12, 2023BApt BASEME · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 17, 2023
Jun 12, 2023BApt BASEME · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 17, 2023
Jun 12, 2023AApt BASEME · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT WASHBASIN CABINET DOORS IN THE BATHROOM LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 15, 2023
Jun 12, 2023BApt BASEME · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 17, 2023
Jun 12, 2023BApt BASEME · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT BASEME, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 17, 2023
May 22, 2023BApt CELLAR · § 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE, GAS RANGE INSTALLED AT KITCHEN CREATED AT ILLEGAL CLASS A CELLAR APARTMENT IN THE ENTIRE APARTMENT LOCATED AT CELLAR APT CELLARJun 26, 2023
May 22, 2023BApt CELLAR · § 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION 3 STORY, 3 FAMILY MUTIPLE DWELLING BUILDING ILLEGALLY CONVERTED INTO 3 STORY 4 FAMILY MULTIPLE DWELLING CONSISTING OF ILLEGAL CLASS A CELLAR APAJun 26, 2023
May 22, 2023BApt CELLAR · § 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS BEHIND WALLS AND UNDER FLOOR AT BATHROOM WITHIN ILLEGAL CLASS A CELLAR APARTMENT IN THE ENTIRE APARTMENT LOCATED AT CELLAR APT CELLARJun 26, 2023
Mar 16, 2023A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jun 19, 2023
Feb 17, 2022A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.May 23, 2022
Apr 2, 2021A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 6, 2021

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 1:19 PM ET. BBL 2049030058.

Look up another building