Bronx · Block 3741 · Lot 1 · 10472

1113 Ward Avenue

5 floors · 51 apartments · 43,200 sq ft · built 1927 · class C7 · owner of record: 1111 Ward Ave Llc

17open violations
$0ECB/OATH penalties owed
12HPD class C (immediately hazardous)
62dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 62 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 62 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 78 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 43,200 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 183 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 183 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 306 days
Registered through 2027-09-01
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-05 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#42526
DOB VIOLATION - ACTIVE
Apr 29, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2002580
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 29, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
HPD (13) · C 12 · B 1 · A 0
IssuedClassViolationCorrect by
Apr 9, 2026C567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GMay 5, 2026
Apr 9, 2026C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS AT BOTTOM PANE AT WINDOW AT NORTH WALL, AT 1ST STORY INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, SECTION ''1111''Apr 15, 2026
Aug 31, 2022CApt 4E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE KITCHEN LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''south''Sep 24, 2022
Aug 31, 2022CApt 4E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTISep 24, 2022
Aug 31, 2022CApt 4E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''south''Sep 24, 2022
Aug 22, 2022CApt 5H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 29 SQ FT AT WINDOW FRAME APPROX 2 SQ FT IN THE BATHROOM LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTHSep 17, 2022
Jun 13, 2022CApt 5H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING 20 SQ.FT. ,EAST WALL 6 SQ.FT. IN THE BATHROOM LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH ORIGINAL VIOLATION 14834898 ISSUED 17-FEB-22 HAS BEEN UPGRADEDJul 9, 2022
Apr 29, 2022CApt 5H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING 20 SQ.FT. NORTH WALL 12 SQ.FT. SOUTH WALL 6 SQ.FT. AND WEST WALL 12 SQ.FT. IN THE KITCHEN. IN THE KITCHEN LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''1113'', 1st FROM WEST AMay 25, 2022
Apr 8, 2022CApt 5H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 90 SQ. FT AT THE CEILING APPROX. 80 SQ. FT. AT THE WEST WALL APPROX. 20 SQ. FT. AT THE EAST WALL IN THE KITCHEN LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST''May 4, 2022
Feb 22, 2022CApt 5H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING 30 SQ.FT. NORTH 12 SQ.FT. WEST WALL 20 SQ.FT .AND SOUTH WALL 20 SQ.FT. IN THE KITCHEN LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTHMar 20, 2022
Jun 21, 2019BApt 5G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 10 SQ.FT. SOUTH WALL IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTJul 26, 2019
Jun 18, 2019CApt 5G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL (APPROX. 10 SQ. FT. ) IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 12979341 ISSUED 25-MAR-19 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIVE CODE ''Jul 9, 2019
Mar 29, 2019CApt 5H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CEILING AND ALL WALLS APPROX. 30 SQUARE FEET IN THE KITCHEN LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTHApr 19, 2019

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 9:31 AM ET. BBL 2037410001.

Look up another building