Brooklyn · Block 5241 · Lot 31 · 11210

1111 Ocean Avenue

6 floors · 103 apartments · 157,493 sq ft · built 1954 · class D4 · owner of record: 1111 Ocean Ave Owners Corp

61open violations
$450,140ECB/OATH penalties owed
17HPD class C (immediately hazardous)
67dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 67 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-06-25 (Accepted). Agency page

Dec 31, 2026
in 67 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 83 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 157,493 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 188 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 188 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 311 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 432 days
Next cycle year 2027
Energy audit and retro-commissioning (2031) Likely applies
Local Law 87 · Calendar year 2031
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5241). Agency page

Dec 31, 2031
in 1893 days
Next due 2031

Open violations

ECB / OATH (205) · $450,140 owed
IssuedViolationHearingBalance
May 13, 2026Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTED:OBSERVED BROKEN WINDOWS AT FIRST FLOOR LEVEL AT EXP 1(W. ELEV) AND EXP3(E. ELEV) LOCATED AT 4TH FLOOR LEVEL. REMEDY: MAINTAIN EXTERIOR FACAD
#35729735P
Feb 4, 2027
$5,000
Dec 19, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35645013P) ISSUED ON 01/12/2022 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170954X
Nov 24, 2026
$1,250
Dec 19, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35662506H) ISSUED ON 10/02/2023 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170955H
Nov 24, 2026
$1,250
Dec 16, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35634271Y) ISSUED ON 10/27/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170582Y
Nov 24, 2026
$1,250
Dec 16, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35644730N) ISSUED ON 01/12/2022 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170588P
Nov 24, 2026
$1,250
Dec 15, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35575519L) ISSUED ON 07/23/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170421N
Nov 19, 2026
$1,250
Dec 15, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35575260L) ISSUED ON 08/13/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170406P
Nov 19, 2026
$1,250
Dec 15, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35577854H) ISSUED ON 06/11/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170440Z
Nov 19, 2026
$1,250
Dec 15, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35561348Z) ISSUED ON 05/14/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170403J
Nov 19, 2026
$1,250
Dec 15, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35577717L) ISSUED ON 06/02/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170427Y
Nov 19, 2026
$1,250
Dec 15, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (345575442M) ISSUED ON 08/11/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DA
#39170413N
Nov 19, 2026
$1,250
Dec 15, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35576928R) ISSUED ON 10/27/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170425K
Nov 19, 2026
$1,250
Dec 15, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35577718N) ISSUED ON 06/02/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170438J
Nov 19, 2026
$1,250
Dec 15, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35576119R) ISSUED ON 01/12/2022 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170424Z
Sep 14, 2026
IN VIOLATION
$625
Dec 15, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35575441K) ISSUED ON 08/11/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170410H
Nov 19, 2026
$1,250
Dec 12, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35542373R) ISSUED ON 12/02/2020 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170251J
Jun 17, 2026
IN VIOLATION
$1,250
Dec 12, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35259449K) ISSUED ON 09/29/2017 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170228L
Apr 15, 2026
IN VIOLATION
$1,250
Dec 12, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35378232L) ISSUED ON 03/12/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170237N
Apr 15, 2026
IN VIOLATION
$625
Dec 12, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35285126P) ISSUED ON 09/29/2017 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170235J
Apr 15, 2026
IN VIOLATION
$1,250
Dec 12, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35561341X) ISSUED ON 05/14/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170272Z
Apr 15, 2026
IN VIOLATION
$625
Dec 12, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35559878N) ISSUED ON 05/07/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170255R
Apr 15, 2026
IN VIOLATION
$625
Dec 12, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35538614R) ISSUED ON 06/02/2020 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170248Z
Apr 15, 2026
IN VIOLATION
$625
Dec 12, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35561347R) ISSUED ON 05/14/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170274M
Sep 14, 2026
IN VIOLATION
$625
Dec 12, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35549072P) ISSUED ON 03/12/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170253N
Apr 15, 2026
IN VIOLATION
$1,250
Dec 11, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35577717L) ISSUED ON 06/02/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170058H
Nov 19, 2026
$1,250
Dec 11, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35644730N) ISSUED ON 01/12/2022 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170064Y
Nov 19, 2026
$1,250
Dec 11, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35285125N) ISSUED ON 09/29/2017 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170051P
Nov 24, 2026
$1,250
Dec 11, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35542373R) ISSUED ON 12/02/2020 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170056Y
Nov 24, 2026
$1,250
Dec 11, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (35173831Y) ISSUED ON 12/28/2016 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170129X
Nov 19, 2026
$1,250
Dec 11, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (39050384R) ISSUED ON 11/01/2021 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170077N
Nov 19, 2026
$1,250
Dec 11, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (39096932M) ISSUED ON 10/12/2023 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170128Y
Nov 19, 2026
$1,250
Dec 11, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION# (39078474P) ISSUED ON 01/26/2023 AND TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, NO CORRECTION AS OF DAT
#39170117Z
Nov 19, 2026
$1,250
Nov 21, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE THE CERTIFICATE OFCORRECTION WITH DEPARTMENT OF BUILDINGS. NOTED: AS PER PROPERTY REVIEWIT WAS REVEALED THAT THE PROPERTY OWNER DID NOT FILE A CERTIFICATE OF
#35717974Y
Jan 28, 2026
IN VIOLATION
$1,250
Nov 21, 2025Construction CLASS - 1
FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: OBSERVED AT EXP 1(W. ELEV) AND EXP 3(E. ELEV) OBJECTS AT FIRE ESCAPES AT MULTIPLE LOCATIONS. REMEDY: REMOVE OBSTRUCTIONS.
#35726156R
Jan 28, 2026
IN VIOLATION
$1,250
Nov 21, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE THE CERTIFICATE OFCORRECTION WITH DEPARTMENT OF BUILDINGS. NOTED: AS PER PROPERTY REVIEWIT WAS REVEALED THAT THE PROPERTY OWNER DID NOT FILE A CERTIFICATE OF
#35717973M
Jan 28, 2026
IN VIOLATION
$1,250
Nov 21, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE THE CERTIFICATE OFCORRECTION WITH DEPARTMENT OF BUILDINGS. NOTED: AS PER PROPERTY REVIEWIT WAS REVEALED THAT THE PROPERTY OWNER DID NOT FILE A CERTIFICATE OF
#35726155P
Jan 28, 2026
IN VIOLATION
$1,250
Jul 3, 2024Construction CLASS - 1
UNLAWFUL ACTS: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER AS STATED IN ECB# 35662506H ISSUED ON 10/02/2023 AND FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 FOR FAILURE TO MAINTAIN BUI
#39118348H
Sep 11, 2024
IN VIOLATION
$2,500
Jun 6, 2024Unknown CLASS - 2
AT THE TIME OF MY INSPECTION OF A 7 STORY BUILDING, I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE # 1, 2 AND 3. UPON REVIEW OF THE DEPARTMENT RECORD IT REVEAL THAT THE SIDEWALK SHED PERMIT HAS BEEN EXPIRED FROM
#39529388Z
Aug 14, 2024
IN VIOLATION
$1,250
Apr 19, 2024Construction CLASS - 1
UNLAWFUL ACTS.FAILURE TO COMPLY WITH COMMISSIONER'S ORDER AS PER VIOLATION#072820CLLFA01CN WHICH WAS ISSUED ON 07/28/2020 OWNER WERE TO IMMEDIATELY RETAIN NYS LICENSED PROFESSIONAL TO EVALUATE FACADE AND ITS AP
#35682194X
Mar 18, 2025
IN VIOLATION
$2,500
Apr 19, 2024Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES AS NOTEDAT TIME OF INSPECTION I OBSERVED ON EXPOSURE#1 WEST ELEVATION & 4 SOUTH ELEVATION.CRACKS IN BRICK WORK AT PARAPET AND DAMAGED DETERIORATED M
#35682195H
Nov 4, 2024
IN VIOLATION
$1,250
Jan 29, 2024Construction CLASS - 1
UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 39103319R ISSUED ON 1/11/24 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. (FAILURE
#39104603Z
Apr 3, 2024
IN VIOLATION
$1,250
Jan 29, 2024Construction CLASS - 1
UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 35576928R ISSUED ON 10/27/21 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. (FAILURE
#39104605M
Apr 3, 2024
IN VIOLATION
$1,250
Jan 23, 2024Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSION ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR THE NOTICE OF VIOLATION # 39076711K ISSUED ON 12/30/2022 PURSUANT TO 28-204.4:, FILE A CERTIF
#39104081K
Apr 3, 2024
IN VIOLATION
$1,250
Jan 12, 2024Construction CLASS - 2
AN ECB SUMMONS#39077277L ISSUED ON 1/9/2023 AND RESPONDENT WAS FOUND IN VIOLATION. AS OF 1/12/2024 NO CERTIFICATE OF CORRECTION WAS RECEIVED BY DOB AS REQUESTED BY COMMISSIONER'S ORDER, FILE A CERTIFICATE OF CO
#39103456N
Mar 20, 2024
IN VIOLATION
$1,250
Jan 11, 2024Construction CLASS - 2
AN ECB SUMMONS # 39077315N ISSUED ON 3/15/2023 AND RESPONDENT WAS FOUND IN VIOLATION. AS OF 1/11/2024 NO CERTIFICATE OF CORRECTION WAS RECEIVED BY DOB AS REQUESTED BY COMMISSIONER'S ORDER., FILE A CERTIFICATE O
#39103352Z
Mar 20, 2024
IN VIOLATION
$1,250
Jan 11, 2024Construction CLASS - 2
AN ECB SUMMONS # 39078199J ISSUED ON 1/23/2023 AND RESPONDENT WAS FOUND IN VIOLATION. AS OF 1/11/2024 NO CERTIFICATE OF CORRECTION WAS RECEIVED BY DOB AS REQUESTED BY COMMISSIONER'S ORDER., FILE A CERTIFICATE O
#39103319R
Mar 20, 2024
IN VIOLATION
$1,250
Jan 11, 2024Construction CLASS - 2
AN ECB SUMMONS # 39077640R ISSUED ON 1/12/2023 AND RESPONDENT WAS FOUND IN VIOLATION. AS OF 1/11/2024 NO CERTIFICATE OF CORRECTION WAS RECEIVED BY DOB AS REQUESTED BY COMMISSIONER'S ORDER., FILE A CERTIFICATE O
#39103513K
Mar 27, 2024
IN VIOLATION
$1,250
Jan 5, 2024Construction CLASS - 2
AN ECB SUMMONS #39077342Z, WAS ISSUED ON 1/10/2023 AND RESPONDENT WAS FOUND IN VIOLATION. AS OF 1/5/2024 NO CERTIFICATE OF CORRECTION WAS RECEIVED BY DOB AS REQUESTED BY COMMISSIONER'S ORDER., FILE A CERTIFICAT
#39102925M
Mar 13, 2024
DEFAULT
$3,125
Jan 5, 2024Construction CLASS - 2
AN ECB SUMMONS #39077299M, WAS ISSUED ON 1/09/2023 AND RESPONDENT WAS FOUND IN VIOLATION. AS OF 1/5/2024 NO CERTIFICATE OF CORRECTION WAS RECEIVED BY DOB AS REQUESTED BY COMMISSIONER'S ORDER., FILE A CERTIFICAT
#39102826R
Mar 13, 2024
IN VIOLATION
$1,250
Jan 5, 2024Construction CLASS - 2
AN ECB SUMMONS #39077342Z, WAS ISSUED ON 1/10/2023 AND RESPONDENT WAS FOUND IN VIOLATION. AS OF 1/5/2024 NO CERTIFICATE OF CORRECTION WAS RECEIVED BY DOB AS REQUESTED BY COMMISSIONER'S ORDER., FILE A CERTIFICAT
#39102780K
Mar 13, 2024
IN VIOLATION
$1,250
Jan 5, 2024Construction CLASS - 2
AN ECB SUMMONS #35378232L, WAS ISSUED ON 3/12/2021 AND RESPONDENT WAS FOUND IN VIOLATION. AS OF 1/5/2024 NO CERTIFICATE OF CORRECTION WAS RECEIVED BY DOB AS REQUESTED BY COMMISSIONER'S ORDER., FILE A CERTIFICAT
#39102809P
Mar 13, 2024
IN VIOLATION
$1,250
Jan 5, 2024Construction CLASS - 2
AN ECB SUMMONS #39077299M, WAS ISSUED ON 1/09/2023 AND RESPONDENT WAS FOUND IN VIOLATION. AS OF 1/5/2024 NO CERTIFICATE OF CORRECTION WAS RECEIVED BY DOB AS REQUESTED BY COMMISSIONER'S ORDER., FILE A CERTIFICAT
#39102980P
Mar 13, 2024
DEFAULT
$3,125
Jan 5, 2024Construction CLASS - 2
AN ECB SUMMONS #35378232L, WAS ISSUED ON 3/12/2021 AND RESPONDENT WAS FOUND IN VIOLATION. AS OF 1/5/2024 NO CERTIFICATE OF CORRECTION WAS RECEIVED BY DOB AS REQUESTED BY COMMISSIONER'S ORDER., FILE A CERTIFICAT
#39102957R
Mar 13, 2024
DEFAULT
$3,125
Dec 27, 2023Elevators CLASS - 2
MISALIGNED CAB MIRROR. ADJUST FLOOR STOPS. PROVIDE KEYS TO ROOF/MACHINE ROOM.
#39102239M
Mar 6, 2024
IN VIOLATION
$625
Dec 18, 2023Construction CLASS - 2
FAILURE TO FILE CERTIFICATE OF CORRECTION OR COMPLY WITH VIOLATION NUMBER 39076612P, AT TIME OF INSPECTION, NO CERTIFICATE OF CORRECTIONS HAS BEEN RECEIVED BY DOB AS REQUIRED BY COMMISSIONERS ORDER., FILE A CER
#39101705X
Feb 21, 2024
IN VIOLATION
$1,250
Dec 18, 2023Construction CLASS - 2
FAILURE TO FILE CERTIFICATE OF CORRECTION OR COMPLY WITH VIOLATION NUMBER 39076921Z. OBSERVED NON COMPLIANCE TO PRIOR VIOLATION NUMBER LISTED., FILE A CERTIFICATE OF CORRECTION
#39101699Z
Feb 21, 2024
IN VIOLATION
$1,250
Dec 18, 2023Construction CLASS - 2
FAILURE TO FILE CERTIFICATE OF CORRECTION OR COMPLY WITH VIOLATION NUMBER 39077310Y. AT TIME OF INSPECTION OBSERVED NO COMPLIANCE TO PRIOR VIOLATION NUMBER LISTED FOR FAILURE TO COMPLY WITH COMMISSIONERS ORDER.
#39101687L
Feb 21, 2024
IN VIOLATION
$1,250
Dec 14, 2023Construction CLASS - 2
FAILURE TO FILE CERTIFICATE OF CORRECTION OR COMPLY WITH VIOLATION NUMBER 39077305J. NOTE: AT TIME OF INSPECTION, FOUND NO COMPLIANCE, OR CERTIFICATE OF CORRECRION ON DOB RECORDS FOR VIOLATION # 39077305J ISSUE
#39101389N
Feb 21, 2024
IN VIOLATION
$1,250
Dec 14, 2023Construction CLASS - 2
FAILURE TO FILE CERTIFICATE OF CORRECTION OR COMPLY WITH VIOLATION NUMBER 39077646H. NOTE: AT TIME OF INSPECTION, FOUND NO COMPLIANCE, OR CERTIFICATE OF CORRECRION ON DOB RECORDS FOR VIOLATION # 39077646H ISSUE
#39101380R
Feb 21, 2024
IN VIOLATION
$1,250
Dec 14, 2023Construction CLASS - 2
FAILURE TO FILE CERTIFICATE OF CORRECTION OR COMPLY WITH VIOLATION NUMBER 39077651M. NOTE: AT TIME OF INSPECTION, A SEARCH OF DOB RECORDS FOUND NO COMPLIANCE,. OR CERTIFICATE OF CORRECTION FILED FOR VIO # 39077
#39101412M
Feb 21, 2024
IN VIOLATION
$1,250

Showing 60 of 205. Full list on the agency site.

DOB (1)
IssuedViolationStatus
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#03318
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Sep 23, 2026Parking Structures FTF-PS-INITL
Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13
Active
HPD (59) · C 17 · B 30 · A 12
IssuedClassViolationCorrect by
Oct 20, 2026B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 6th STORY, SECTION AT NORTHNov 24, 2026
Oct 20, 2026C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT PUBLIC HALL, 6th STORY, SECTION AT NORTHOct 26, 2026
Oct 20, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 6th STORY, SECTION AT NORTHJan 23, 2027
Oct 19, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE THREAD FROM 1ST FROM BOTTOM AT BUILDING FRONT AT STOOPNov 23, 2026
Oct 15, 2026B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING NORTH SECTION AT PUBLIC HALL, 6th STORYNov 19, 2026
Oct 15, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT PUBLIC HALL, 1st STORYNov 19, 2026
Oct 15, 2026B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AT PUBLIC HALL, 1st STORYNov 19, 2026
Oct 15, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING NORTH SECTION AT PUBLIC HALL, 6th STORYNov 19, 2026
Oct 15, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING NORTH SECTION AT PUBLIC HALL, 6th STORYJan 18, 2027
Oct 15, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE THREAD AT NORTH FIRE STAIRS FIRST AND SECOND FROM BOTTOM AT PUBLIC HALL STAIRS, 1st STORYNov 19, 2026
Sep 25, 2026C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTICE LOCK LEADING TO BUILDING ENTRANCE DOOR AT PUBLIC HALLOct 1, 2026
Sep 23, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS, PLASTER AT CEILING AND EAST WALL , SOUTH SECTION, AT PUBLIC HALL, 6th STORYOct 28, 2026
Sep 23, 2026AApt 617 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEAT RISER AT WEST WALL IN THE BATHROOM LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Dec 27, 2026
Sep 23, 2026BApt 617 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCKING DEVICE AT, DOOR IN THE ENTRANCE, EAST WALL, IN THE FOYER LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Oct 28, 2026
Sep 23, 2026BApt 617 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT, LOWER SASH WINDOW TO FIRE ESCAPE , NORTH WALL, IN THE KITCHEN LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Oct 28, 2026
Sep 23, 2026AApt 617 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE KITCHEN LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Dec 27, 2026
Sep 23, 2026BApt 617 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES INOPERATIVE IN THE ENTIRE APARTMENT LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , Oct 28, 2026
Sep 23, 2026BApt 617 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS INOPERATIVE IN THE ENTIRE APARTMENT LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST Oct 28, 2026
Sep 23, 2026BApt 617 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Oct 28, 2026
Sep 23, 2026BApt 617 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE BATHROOM LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Oct 28, 2026
Sep 23, 2026AApt 617 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT OBSERVED AT NORTH WINDOW FRAME IN THE BATHROOM LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Dec 27, 2026
Sep 23, 2026AApt 617 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Dec 27, 2026
Sep 23, 2026CApt 617 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 617, 6th STORY, 3rd APAOct 19, 2026
Sep 23, 2026C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HOLES IN FLOOR WITH 6>INCHES IN DIAMETER AT PUBLIC HALL, 6th STORYSep 29, 2026
Sep 23, 2026C§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT SOUTH SECTION, AT PUBLIC HALL, 6th STORYSep 29, 2026
Sep 23, 2026BApt 617 · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE RADIATOR ACCESS DOOR AT NORTH WALL IN THE KITCHEN LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Oct 28, 2026
Sep 1, 2026BApt 604 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH AT 1ST WINDOW FROM NORTH AT EAST WALL. IN THE 1st ROOM FROM EAST LOCATED AT APT 604, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTOct 6, 2026
Sep 1, 2026AApt 306 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAT 10 SQUARE FEET OBSERVED AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 306, 3rd STORY, 4th APARTMENT FROM NORTH AT EASTDec 5, 2026
Sep 1, 2026CApt 604 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 604, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTSep 27, 2026
Sep 1, 2026BApt 604 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE THRESHOLD AT DOOR IN THE BATHROOM LOCATED AT APT 604, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTOct 6, 2026
Sep 1, 2026BApt 604 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 604, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTOct 6, 2026
Sep 1, 2026BApt 604 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 604, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTOct 6, 2026
Sep 1, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALLDec 5, 2026
Sep 1, 2026BApt 604 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM THE BUILDING ENTRANCE DOOR TO PANEL AT WEST WALL IN THE FOYER LOCATED AT APT 604, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTOct 6, 2026
Sep 1, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING APPROX 10 SQ FT. AT PUBLIC HALLOct 6, 2026
Aug 17, 2026AApt 617 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WESTNov 20, 2026
Aug 11, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS PLASTER AT CEILING AT , BUILDING'S LOBBY, BASEMENT STORY AT PUBLIC HALLSep 15, 2026
Aug 11, 2026B§ 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL BX CABLE WIRES AT CEILING AND SOUTH WALL , SOUTH SECTION, AT PUBLIC HALL, 6th STORYSep 15, 2026
Aug 11, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED FIRE RETARDANT MATERIALS AT CEILING AND EAST WALL, SOUTH SECTION, AT PUBLIC HALL, 6th STORYSep 15, 2026
Jun 30, 2026CApt 404 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 404, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTHJul 26, 2026
Jun 30, 2026CApt 404 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 404, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTHJul 26, 2026
Jun 15, 2026BApt 605 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT THE CEILING AND WINDOW FRAME IN THE BATHROOM LOCATED AT APT 605, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT NORTHJul 20, 2026
Feb 2, 2026C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT TREADS 11, 9, 5, 4, AND 2 UP FROM BOTTOM AT SECOND STAIRWELL FROM NORTH AT PUBLIC HALL STAIRS, 1st STORY, SECTION ''NORTH ''Feb 8, 2026
Jun 27, 2025CApt 617 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 617, 6th STORY, 3rd APJul 23, 2025
Nov 7, 2024CApt 611 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0; WG TO REPLACE = 0; WG TO REPAIR = 2; IN THE ENTIRE APARTMENT LOCATED AT APT 611, 6th STORY, 1st APDec 3, 2024
Mar 13, 2024CApt 617 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 617, 6th STORY, 3rd APAApr 8, 2024
Dec 1, 2023C§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE MARBLE TILES AT NORTH WALL AT FRONT ENTRANCE TO BUILDINGDec 7, 2023
Nov 27, 2023CApt 608 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER SASH AT WINDOW IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 608, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTDec 3, 2023
Nov 9, 2023BApt 608 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE SADDLE IN THE ENTRANCE LOCATED AT APT 608, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHDec 14, 2023
Nov 6, 2023AApt 102 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH AND NORTH WALLS (2 SQ. FT.) IN THE 1st BATHROOM FROM EAST LOCATED AT APT 102, 1st STORY, 3rd APARTMENT FROM SOUTH AT WESTFeb 9, 2024
Feb 15, 2023CApt 303 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCKS INSTALLED AT DOOR TO FIRE ESCAPE IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 21, 2023
Nov 25, 2022BApt 303 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 30, 2022
Nov 25, 2022BApt 303 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 30, 2022
Nov 25, 2022BApt 303 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 30, 2022
Jan 19, 2022A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION STORAGE ROOM CONVERTED TO LAUNDRY ROOM AT BASEMENT, SECTION AT SOUTHApr 24, 2022
Nov 5, 2021CApt 601 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTHNov 29, 2021
Nov 3, 2021A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION STORAGE ROOM CONVERTED TO LAUNDRY ROOM AT BASEMENTFeb 6, 2022
Nov 1, 2021BApt 507 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL AT BATHTUB IN THE 1st BATHROOM FROM EAST LOCATED AT APT 507, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''Dec 6, 2021
Aug 12, 2021CApt 303 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTSep 7, 2021

Issued in the last 120 days

DateSourceWhatNow
Oct 20, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 6th STORY, SECTION AT NORTHOpen
Oct 20, 2026HPD C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT PUBLIC HALL, 6th STORY, SECTION AT NORTHOpen
Oct 20, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 6th STORY, SECTION AT NORTHOpen
Oct 19, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE THREAD FROM 1ST FROM BOTTOM AT BUILDING FRONT AT STOOPOpen
Oct 15, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING NORTH SECTION AT PUBLIC HALL, 6th STORYOpen
Oct 15, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT PUBLIC HALL, 1st STORYOpen
Oct 15, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AT PUBLIC HALL, 1st STORYOpen
Oct 15, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING NORTH SECTION AT PUBLIC HALL, 6th STORYOpen
Oct 15, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING NORTH SECTION AT PUBLIC HALL, 6th STORYOpen
Oct 15, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE THREAD AT NORTH FIRE STAIRS FIRST AND SECOND FROM BOTTOM AT PUBLIC HALL STAIRS, 1st STORYOpen
Sep 25, 2026HPD C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTICE LOCK LEADING TO BUILDING ENTRANCE DOOR AT PUBLIC HALLOpen
Sep 23, 2026DOB SafetyParking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13Open
Sep 23, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS, PLASTER AT CEILING AND EAST WALL , SOUTH SECTION, AT PUBLIC HALL, 6th STORYOpen
Sep 23, 2026HPD A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEAT RISER AT WEST WALL IN THE BATHROOM LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Open
Sep 23, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCKING DEVICE AT, DOOR IN THE ENTRANCE, EAST WALL, IN THE FOYER LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Open
Sep 23, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT, LOWER SASH WINDOW TO FIRE ESCAPE , NORTH WALL, IN THE KITCHEN LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Open
Sep 23, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE KITCHEN LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Open
Sep 23, 2026HPD B§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES INOPERATIVE IN THE ENTIRE APARTMENT LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , Open
Sep 23, 2026HPD B§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS INOPERATIVE IN THE ENTIRE APARTMENT LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST Open
Sep 23, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Open
Sep 23, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE BATHROOM LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Open
Sep 23, 2026HPD A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT OBSERVED AT NORTH WINDOW FRAME IN THE BATHROOM LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Open
Sep 23, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 617, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Open
Sep 23, 2026HPD C§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 617, 6th STORY, 3rd APAOpen
Sep 23, 2026HPD C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HOLES IN FLOOR WITH 6>INCHES IN DIAMETER AT PUBLIC HALL, 6th STORYOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 5:49 AM ET. BBL 3052410031.

Look up another building