1 floors · 10,900 sq ft · built 1972 · class E1 · owner of record: Jumabe Realty, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 18, 2024 | Construction CLASS - 2 OBSERVED IN SMI CONSTRUCTION MANAGEMENT INC ON THE GROUND FLOOR NO ACTIVE SPRINKLER SYSTEM IN PLACE SPRINKLER VALVE IS CLOSED GAGES READING ZERO SPRINKLER HEADS COVERED IN DUST WHICH CONTRARY TO CODE BC 903.3.3 #39125215J | Jan 24, 2025 STIPULATION/IN-VIO | $0 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 12:31 AM ET. BBL 2037360006.