5 floors · 59 apartments · 26,165 sq ft · built 1926 · class C1 · owner of record: Cloth Pillars I Housing Development Fund Corporat
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 26,165 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-13 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 20, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION GAINED ACCESS INTO APARTMENT 4B OBSERVE ISSUES WITH CEILING BLACK PLASTIC BAG COVERING APPROXIMATE SIX BY SIX HOLE., REPAIR AND/OR REPLACE #39208494P | Dec 24, 2026 PENDING | $1,250 |
| May 10, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED IN BEDROOM OF APT #1D (CLOSET AREA) SECTION OF WIRE LATH PLASTER WALL MISSING AT BASE OF WALL APPROX 6" IN HEIGHT AND 30" IN LENGTH., REPAIR AND/OR R #39114070Y | Sep 5, 2024 IN VIOLATION | $312 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Feb 28, 2025 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Dec 2, 2024 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 2, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT VESTIBULE AT PUBLIC HALL, 1st STORY | Nov 8, 2026 |
| Sep 17, 2026 | B | Apt 3J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 3J, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 22, 2026 |
| Jun 23, 2026 | C | Apt 2M · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2M, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 19, 2026 |
| Jun 23, 2026 | C | Apt 2M · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2M, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 19, 2026 |
| Jul 7, 2025 | B | Apt 1G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE KITCHENETTE LOCATED AT APT 1G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 11, 2025 |
| Jul 7, 2025 | B | Apt 1G · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 11, 2025 |
| Jul 7, 2025 | B | Apt 1G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL, SOUTH WALL AND WEST WALL IN THE BATHROOM LOCATED AT APT 1G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 11, 2025 |
| Jul 7, 2025 | B | Apt 1G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHTUB IN THE BATHROOM LOCATED AT APT 1G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 11, 2025 |
| Mar 24, 2025 | C | Apt 2L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) WES | Apr 17, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Nov 2, 2026 | HPD C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT VESTIBULE AT PUBLIC HALL, 1st STORY | Open |
| Oct 20, 2026 | ECB | Construction: AT TIME OF INSPECTION GAINED ACCESS INTO APARTMENT 4B OBSERVE ISSUES WITH CEILING BLACK PLASTIC BAG COVERING APPROXIMATE SIX BY SIX HOLE., REPAIR AND/OR REPLACE | Open |
| Sep 17, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 3J, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 3:29 PM ET. BBL 1020100021.