32 floors · 480 apartments · 503,310 sq ft · built 1962 · class D7 · owner of record: Hp Rachel Bridge Housing Development Fun D
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual boiler inspection (7 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-08 (Accepted). Agency page | Dec 31, 2026 in 58 days | 1 of 7 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 503,310 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 302 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 423 days | Next cycle year 2027 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $2,005,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 841 days | Filing window not open yet |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2162). Agency page | Dec 31, 2032 in 2250 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 1, 2026 | Elevators CLASS - 2 RTS FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER, SERVICE ELEVATOR EQUIPMENT AS PER CODE BC3001.2 & 27-987. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE, CREATING A HAZARDOUS CONDITION FOR #39206272K | Dec 10, 2026 PENDING | $625 |
| Sep 1, 2026 | Elevators CLASS - 1 CLASS1 ITEM: RTS FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER, SERVICE ELEVATOR EQUIPMENT AS PER CODE BC3001.2 & 27-987. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE, CREATING A HAZARDOUS #39202538K | Nov 5, 2026 PENDING | $1,250 |
| Nov 18, 2025 | Elevators CLASS - 1 97/X/17 ENTIRE DEVICE INOPERATIVE REPAIR #39167337N | Jan 11, 2027 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| May 20, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPE CTION,I OBSERVED BROKEN WINDOW PANE ON FOURTH FLOOR AT EXP1 WEST ELEV THAT IS HAZARDOUS TO THE PUBLIC.EXP3 EAST ELEV OBJECT HANGING OVER BAL CONY RAIL ON 27TH AND 28TH FLOORS.ALSO DAMAGED METAL OANEL ON 3RD FL.R EMEDY:REPAIR AND/ #SR1202RF | DOB VIOLATION - ACTIVE |
| Dec 18, 2020 | ELEVATOR CEASE USE 1P26790/1P26791 #3214H310089 | DOB VIOLATION - ACTIVE |
| May 27, 2020 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS #00046 | DOB VIOLATION - ACTIVE |
| May 26, 2020 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS #00047 | DOB VIOLATION - ACTIVE |
| May 26, 2020 | HAZARDOUS CONDITION (FACADE) UNSAFE REPORT FILED #88894 | DOB VIOLATION - ACTIVE |
| May 1, 2014 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00833 | DOB VIOLATION - ACTIVE |
| Jul 19, 2002 | ELEVATOR #9011/155903 | DOB VIOLATION - ACTIVE |
| Mar 29, 1990 | CONSTRUCTION #D3JM01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2026 | Parking Structures FTF-PS-INITL Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Active |
| Sep 23, 2026 | Parking Structures FTF-PS-INITL Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| May 26, 2020 | Facades FISPHAZ UNSAFE REPORT FILED | Active |
| May 26, 2020 | Facades FISPHAZ UNSAFE REPORT FILED | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| Feb 20, 2013 | Facades LL11/98 CYCLE 7 UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 13, 2024 | B | Apt 20K · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 18 SQ. FT. AT THE CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 20K, 20th STORY, 5th APARTMENT FROM SOUTH AT WEST | Apr 17, 2024 |
| Mar 13, 2024 | C | Apt 20K · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0; WG TO REPLACE = 0; WG TO REPAIR = 2; IN THE ENTIRE APARTMENT LOCATED AT APT 20K, 20th STORY, 5th A | Apr 8, 2024 |
| Mar 13, 2024 | C | Apt 20K · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR KNOB AND LATCH AT DOOR TO TERRACE IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 20K, 20th STORY, 5th APARTMENT FROM SOUTH AT WEST | Apr 8, 2024 |
| Mar 13, 2024 | B | Apt 20K · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF NON- GROUND FAULT CIRCUIT INTERRUPTER (G.F.C.I.) ELECTRICAL OUTLET AT EAST WALL LIGHT FIXTURE WITHIN 6 FT. OF WATER CLOSET, WASHBASIN AND BATHTUB CREATING A HAZARD IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 20K, 20th STORY, 5th APA | Apr 17, 2024 |
| Mar 13, 2024 | B | Apt 20K · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF NON- GROUND FAULT CIRCUIT INTERRUPTER (G.F.C.I.) ELECTRICAL OUTLET AT WEST WALL WITHIN 6 FT. OF SINK CREATING A HAZARD IN THE KITCHEN LOCATED AT APT 20K, 20th STORY, 5th APARTMENT FROM SOUTH AT WEST | Apr 17, 2024 |
| Mar 13, 2024 | B | Apt 20R · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF NON- GROUND FAULT CIRCUIT INTERRUPTER (G.F.C.I.) ELECTRICAL OUTLET AT NORTH WALL WITHIN 6 FT. OF SINK CREATING A HAZARD IN THE KITCHEN LOCATED AT APT 20R, 20th STORY, 5th APARTMENT FROM NORTH AT EAST | Apr 17, 2024 |
| Mar 13, 2024 | B | Apt 20R · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF NON- GROUND FAULT CIRCUIT INTERRUPTER (G.F.C.I.) ELECTRICAL OUTLET AT WEST WALL LIGHT FIXTURE WITHIN 6 FT. OF WATER CLOSET, WASHBASIN AND BATHTUB CREATING A HAZARD IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 20R, 20th STORY, 5th APA | Apr 17, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 1, 2026 | ECB | Elevators: RTS FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER, SERVICE ELEVATOR EQUIPMENT AS PER CODE BC3001.2 & 27-987. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE, CREATING A HAZARDOUS CONDITION FOR | Open |
| Sep 23, 2026 | DOB Safety | Parking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Open |
| Sep 23, 2026 | DOB Safety | Parking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Open |
| Sep 1, 2026 | ECB | Elevators: CLASS1 ITEM: RTS FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER, SERVICE ELEVATOR EQUIPMENT AS PER CODE BC3001.2 & 27-987. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE, CREATING A HAZARDOUS | Open |
| Jul 24, 2026 | ECB | Elevators: CLASS 2 ITEMS: ACCESS TO ELEVATOR MACHINE ROOM WAS NOT PROVIDED AT TIME OF INSPECTION, PREVENTING INSPECTION AND ACCESS TO ELEVATOR EQUIPMENT, IN VIOLATION OF ASME A17.1-2013 2.7.3 AND 8.6.1.2.1, AND NYC ADMINI | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 11:44 AM ET. BBL 1021620001.