Manhattan · Block 436 · Lot 41 · 10009

111 St Marks Place

5 floors · 12 apartments · 6,115 sq ft · built 1900 · class C1 · owner of record: St. Marks Ev Realty, Llc

7open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
67dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 67 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 83 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 311 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 798 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-17 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (5)
IssuedViolationStatus
Sep 27, 2026CONSTRUCTION
STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION. DAMAGE OBSERVED TO HAVE BEEN SUSTAINED. PREMISES IS A 5 STORY M/D IN WHICH 2 TREES DISLODGED AND ENDED UP LEANING AGAINST BUILDING DAMAGING WINDOW AT 4TH FLOOR LEVEL AND GUARD RAIL ON ROOF NO STRUCTURAL DAMAGE OBSERVED
#26-02312
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#40258
DOB VIOLATION - ACTIVE
Feb 12, 1997CONSTRUCTION

#B3GM02
VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE
Feb 16, 1994CONSTRUCTION

#STC01
VIOLATION UNSERVED ECB-ACTIVE
Feb 16, 1994PLUMBING

#STC01
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
HPD (1) · C 1 · B 0 · A 0
IssuedClassViolationCorrect by
Oct 22, 2026CApt 8 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING 1ST WINDOW FROM WEST ON NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 8, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 28, 2026

Issued in the last 120 days

DateSourceWhatNow
Oct 22, 2026HPD C§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING 1ST WINDOW FROM WEST ON NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 8, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 27, 2026DOBCONSTRUCTION: STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION. DAMAGE OBSERVED TO HAVE BEEN SUSTAINED. PREMISES IS A 5 STORY M/D IN WHICH 2 TREES DISLODGED AND ENDED UP LEANING AGAINST BUILDING DAMAGING WINDOW AT 4TH FLOOR LEVEL AND GUARD RAIL ON ROOF NO STRUCTURAL DAMAGE OBSERVEDOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 3:14 PM ET. BBL 1004360041.

Look up another building