5 floors · 12 apartments · 6,115 sq ft · built 1900 · class C1 · owner of record: St. Marks Ev Realty, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 311 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-17 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 27, 2026 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION. DAMAGE OBSERVED TO HAVE BEEN SUSTAINED. PREMISES IS A 5 STORY M/D IN WHICH 2 TREES DISLODGED AND ENDED UP LEANING AGAINST BUILDING DAMAGING WINDOW AT 4TH FLOOR LEVEL AND GUARD RAIL ON ROOF NO STRUCTURAL DAMAGE OBSERVED #26-02312 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #40258 | DOB VIOLATION - ACTIVE |
| Feb 12, 1997 | CONSTRUCTION #B3GM02 | VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE |
| Feb 16, 1994 | CONSTRUCTION #STC01 | VIOLATION UNSERVED ECB-ACTIVE |
| Feb 16, 1994 | PLUMBING #STC01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 22, 2026 | C | Apt 8 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING 1ST WINDOW FROM WEST ON NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 8, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 28, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 22, 2026 | HPD C | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING 1ST WINDOW FROM WEST ON NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 8, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 27, 2026 | DOB | CONSTRUCTION: STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION. DAMAGE OBSERVED TO HAVE BEEN SUSTAINED. PREMISES IS A 5 STORY M/D IN WHICH 2 TREES DISLODGED AND ENDED UP LEANING AGAINST BUILDING DAMAGING WINDOW AT 4TH FLOOR LEVEL AND GUARD RAIL ON ROOF NO STRUCTURAL DAMAGE OBSERVED | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 3:14 PM ET. BBL 1004360041.