13 floors · 172 apartments · 156,650 sq ft · built 1921 · class D4 · owner of record: 111 Fourth Avenue Associates
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 556). Agency page | Dec 31, 2026 in 65 days | Due this year |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-13 (Inspection Supervisor Review). Agency page | Dec 31, 2026 in 65 days | 3 of 3 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $42,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 117 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 156,650 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 6, 2025 | Construction CLASS - 2 OBSERVED CROSS BEAMS FOR DUNNAGE IN A STATE OF DISREPAIR (RUSTED AND DETERIORATING). DUNNAGE IS SUPPORTING A/C EQUIPMENT ON ROOF LEVEL. TEMPORARY SHORING IN PLACE., REPAIR AND/OR REPLACE; MAKE REPAIRS #39140614M | Oct 24, 2025 IN VIOLATION | $1,250 |
| Nov 18, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OFCORRECTION W/ THE DOB. NOTE:AT TIME OF INSPECTION OBSERVED THAT RESPONDENT DID NOT FILE C OF C FOR ECB#35458566L DATED 8/4/2020. REMEDY:FILE #35542359K | Feb 11, 2021 IN VIOLATION | $1,250 |
| Oct 6, 2020 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. APPROX 60'X30' TO SECTION OF EIFS STUCCO SYSTEM COLLAPSED FROM EXP#3 INTO THE PARKING LOT. REMEDY: REPAIR OR REPLACE. #35502965Y | Jun 17, 2021 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Mar 6, 2025 | CONSTRUCTION FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD STEEL FRAMED ROOF DMG IN A STATE OF DISREPAIR W/HEAVY DETERIORATION OF STUB COLUMNS,ANGLE BRACES,&SOME BEAMS.SPALLNG CNCRTE COVER@SOME BEAMS.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT.FILE FOR RPAIRS BY 4/7/25.SGN OFF RPA #FEU10302AK | DOB VIOLATION - ACTIVE |
| Mar 6, 2025 | CONSTRUCTION EMERGENCY WORK ORDER.@TIME OF INSPECTION,OBSRVD STEEL FRAMED ROOF DMG IN A STATE OF DISREPAIR W/HEAVY DETERIORATION OF STUB COLUMNS, ANGLE BRACES,&SOME BEAMS.SPALLNG CNCRTE COVER@SOME BEAMS.OWNR TO IMMED ENGAGE NYSPE&ENDRSD CNTRCTR TO SHRE/CRIB/BRACE &STBILIZE THE CMPRMSD ROOF DMG UNDR EMGRNCY WRK.E #FEU10301AK | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #01377 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 1:42 PM ET. BBL 1005560044.