Queens · Block 3340 · Lot 13 · 11375

111-32 76 Avenue

6 floors · 74 apartments · 75,455 sq ft · built 1938 · class D1 · owner of record: 111-32 76th Avenue Estates Llc

13open violations
$1,530ECB/OATH penalties owed
2HPD class C (immediately hazardous)
64dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 64 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 64 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 80 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 75,455 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 308 days
Registered through 2027-09-01
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3340). Agency page

Dec 31, 2030
in 1525 days
Next due 2030
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-11 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $1,530 owed
IssuedViolationHearingBalance
Oct 22, 2024Elevators CLASS - 1
CEASE USE ITEM: DOOR ZONE RESTRICTOR INOPERATIVE. THIS IS A SAFETY FEATURE WHICH ENSURES PASSENGER SAFETY. REMEDY: TO RESTORE SERVICE, CALL OR EMAILTHE D.O.B. EIR@BUILDINGS.NYC.GOV. ELEVATOR DIVISION AT (212) 3
#39128124H
Mar 18, 2027
$1,280
Mar 19, 2024Construction CLASS - 3
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED; AT APT. 7J IN LIVING ROOM AREA CLOSEST TO WINDOW OBSERVED WATER MARKS WITH SLIGHT PAINT PEELED AREA APPROX 2FT X 2FT. IN BATHROOM ENTIRE CEILING P
#39109122K
Apr 8, 2027
DEFAULT
$250
DOB (1)
IssuedViolationStatus
May 13, 2008ELEVATOR

#9444/253480
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jul 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Active
HPD (11) · C 2 · B 9 · A 0
IssuedClassViolationCorrect by
Aug 31, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING AT SOUTH YARDOct 5, 2026
Aug 20, 2026BApt 7J · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES IMPROPERLY INSTALLED - STANDARD REQUIRED AT WALL 4 INCHES TO 12 INCHES FROM CEILING IN THE ENTIRE APARSep 24, 2026
Aug 20, 2026BApt 7J · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS IMPROPERLY INSTALLED - STANDARD REQUIRED AT WALL 4 INCHES TO 12 INCHES FROM CEILING IN THE ENTIRE APSep 24, 2026
Apr 22, 2024CApt 7L · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES, IN THE ENTRANCE LOCATED AT APT 7L, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WESTMay 6, 2024
Apr 5, 2024BApt 7J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE KITCHEN LOCATED AT APT 7J, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''F-J''May 10, 2024
Apr 5, 2024BApt 7J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 7J, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''F-J''May 10, 2024
Apr 5, 2024BApt 7J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING ,EAST, SOUTH AND WEST WALLS IN THE BATHROOM LOCATED AT APT 7J, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''F-J''May 10, 2024
Apr 5, 2024BApt 7J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 7J, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''F-J''May 10, 2024
Sep 30, 2019CApt 3L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 21, 2019
Dec 17, 2018BApt 7I · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE LOCATED AT APT 7I, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WESTJan 21, 2019
Aug 3, 2015BApt 7L · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AND MILDEW WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 7L, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTSep 7, 2015

Issued in the last 120 days

DateSourceWhatNow
Aug 31, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING AT SOUTH YARDOpen
Aug 20, 2026HPD B§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES IMPROPERLY INSTALLED - STANDARD REQUIRED AT WALL 4 INCHES TO 12 INCHES FROM CEILING IN THE ENTIRE APAROpen
Aug 20, 2026HPD B§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS IMPROPERLY INSTALLED - STANDARD REQUIRED AT WALL 4 INCHES TO 12 INCHES FROM CEILING IN THE ENTIRE APOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 10:36 PM ET. BBL 4033400013.

Look up another building