Brooklyn · Block 5759 · Lot 1 · 11219

1105 67 Street

2 floors · 15,302 sq ft · built 1931 · class M9 · owner of record: Coptic Orthodox Church Of St George Patr Iarchate

34open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
798dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 798 days
Next cycle year 2028
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-28 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (11)
IssuedViolationStatus
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#10921
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#10920
DOB VIOLATION - ACTIVE
Jan 26, 2018(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#00086
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#08676
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#08677
DOB VIOLATION - ACTIVE
Nov 14, 2016(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#00082
DOB VIOLATION - ACTIVE
Oct 31, 2014PRIVATE RESIDENTIAL ELEVATOR
2013 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS)
#00176
DOB VIOLATION - ACTIVE
Mar 31, 2014PRIVATE RESIDENTIAL ELEVATOR
2012 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS)
#00210
DOB VIOLATION - ACTIVE
Dec 13, 2011PRIVATE RESIDENTIAL ELEVATOR
2010 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS (1 OR 2 FAMILY DWELLINGS)
#00605
DOB VIOLATION - ACTIVE
Nov 12, 2010PRIVATE RESIDENTIAL ELEVATOR
VIOLATION ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS (1 OR 2 FAMILY DWELLINGS)
#00905
DOB VIOLATION - ACTIVE
Jan 3, 2008LOCAL LAW 62/91 - BOILERS

#15030
DOB VIOLATION - ACTIVE
DOB NOW Safety (23)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Sep 11, 2024Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2021 Cat1 Test Report
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Jan 26, 2018Elevators ACJ1
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Nov 14, 2016Elevators ACJ1
Active
Oct 31, 2014Elevators JVIOS
Active
Mar 31, 2014Elevators JVIOS
Active
Dec 13, 2011Elevators JVIOS
Active
Nov 12, 2010Elevators JVIOS
Active
Jan 3, 2008Boiler LL6291
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 10:18 PM ET. BBL 3057590001.

Look up another building