1 floors · 3,300 sq ft · built 1925 · class K1 · owner of record: 1106 Garrison Avenue Realty Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 23, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR OF BUILDING. AT EXPOSURE 1, A SECTION OF THE BRICK FACADE HAS BEEN REMOVED AND REPLACED WITH PLYWOOD, LEAVING PORTIONS OF THE BUILDING OPEN TO THE ELEMENTS. ADDITIONALLY, THE WOOD S #39205266J | Dec 4, 2026 PENDING | $2,500 |
| Aug 7, 2026 | Construction CLASS - 2 GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039555207J ISSUED 6.08.2026.. #39557671M | Jan 4, 2027 | $1,250 |
| Aug 7, 2026 | Construction CLASS - 2 GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039555210K ISSUED 6.08.2026.. #39557672Y | Jan 4, 2027 | $1,250 |
| Jun 8, 2026 | Unknown CLASS - 2 1 STORY ALT1 ACTIVE SITE.OBSERVED MULTIPLE UNSAFE CONDITIONS ONSITE NOT NOTED ON SUPERINTENDENT(CS) LOGBOOKS.AS PER STOP WORK ORDERS/OATH ISSUED ONSITE ECB#39555207J/08L/09N/10K/11M. 1 NO SITE SAFETY PLAN.2 INA #39555213X | Nov 16, 2026 | $5,000 |
| Jun 8, 2026 | Construction CLASS - 2 1 STORY ALT1 HORIZONTAL ENLARGEMENT ACTIVE SITE.OBSERVED NO/MISSING OR INADEQUATE CONSTRUCTION FENCE IN PLACE AT ADJOINING PROPERTIES REAR YARDS AT EXP#2.CONSTRUCTION WORK/ACTIVITY CONCRETE FORMWORK WORKER'S RE #39555209N | Nov 16, 2026 | $1,000 |
| Jun 8, 2026 | Construction CLASS - 2 1 STORY ALT1 ACTIVE SITE. OBSERVED MATERIAL STORAGE ZONE AT EXP#1 IN PLACE WITH YODOK BARRIERS DOT PERMIT EXPIRED ON 6/5/2026. ALSO OBSERVED BLUE TARP ATTACHED TO ROOF. NO PLANS & NO MANUFACTURERS SPECIFICATION #39555211M | Nov 16, 2026 | $1,250 |
| Jun 8, 2026 | Construction CLASS - 1 1 STORY ALT1 ACTIVE SITE.OBSERVED WORK CONTRARY TO PLANS ONSITE,CELLAR MISSING PIPE SCAFFOLD SHORING UNDER WOOD FLOOR JOIST. MAKESHIFT TIMBER WOOD SHORING ATTACHED TO FL JOIST.MISSING EGRESS/INGRESS STAIRS FROM #39555208L | Nov 16, 2026 PENDING | $2,500 |
| Jun 8, 2026 | Construction CLASS - 1 1 STORY ALT1 HORIZONTAL ENLARGEMENT OF BUILDING ACTIVE SITE.OBSERVED CMU WALL APPROXIMATELY 10-15 FT IN HEIGHT REBAR ATTACHED AT EXP#4. NO GUARDRAILS IN PLACE TO PREVENT WORKERS FROM FALLING 10-15 FT POSSIBLE I #39555210K | Nov 16, 2026 | $5,000 |
| Jun 8, 2026 | Site Safety CLASS - 1 ALT1 HORIZONTAL ENLARGEMENT OF AN EXISTING 1 STORY BUILDING ACTIVE SITE. UPON REQUEST TO COMPETENT PERSON FOR REQUIRED DOCUMENTS SITE SAFETY PLANS. NONE PROVIDED ONSITE, SITE SAFETY PLANS ARE REQUIRED TO BE ONS #39555207J | Nov 16, 2026 | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 16, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 23, 2026 | ECB | Construction: FAILURE TO MAINTAIN EXTERIOR OF BUILDING. AT EXPOSURE 1, A SECTION OF THE BRICK FACADE HAS BEEN REMOVED AND REPLACED WITH PLYWOOD, LEAVING PORTIONS OF THE BUILDING OPEN TO THE ELEMENTS. ADDITIONALLY, THE WOOD S | Open |
| Sep 16, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 7, 2026 | ECB | Construction: GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039555207J ISSUED 6.08.2026.. | Closed |
| Aug 7, 2026 | ECB | Construction: GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039555210K ISSUED 6.08.2026.. | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 4:40 AM ET. BBL 2027610018.