Manhattan · Block 53 · Lot 33 · 10006

110 Greenwich Street

13 floors · 60 apartments · 57,941 sq ft · built 1929 · class D8 · owner of record: 110 Greenwich I Llc As Tenant In Common, 71.48%

26open violations
$13,780ECB/OATH penalties owed
0HPD class C (immediately hazardous)
46dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 46 days
Annual
Annual boiler inspection (5 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-12-03 (Accepted). Agency page

Dec 31, 2026
in 46 days
5 of 5 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 62 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 57,941 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 290 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 777 days
Next cycle year 2028
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $36,750 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 829 days
Filing window not open yet
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 53). Agency page

Dec 31, 2033
in 2603 days
Next due 2033

Open violations

ECB / OATH (2) · $13,780 owed
IssuedViolationHearingBalance
Aug 13, 2026Construction CLASS - 2
NO CERTIFICATE OF CORRECTION ON FILE PER COMMISSIONER'S REQUEST FOR CLASS 1 MECHANICAL WORK-WITHOUT-PERMIT VIOLATION #39157202R ISSUED 8/14/2025. SIGNED-OFF PERMITTED JOB FILING #M01273891-I1-GC-CX ISSUED 11/24
#39200529J
Oct 22, 2026
DEFAULT
$1,280
Aug 14, 2025Construction CLASS - 1
ATOI OBSERVED GREE AIR HANDLING UNIT INSTALLED AT APT 6F BEDROOM.AS PER DOB NO PERMIT ON FILE. MECHANICAL WORK 25% COMPLETE AT APT 6F., OBTAIN PERMIT
#39157202R
Oct 23, 2025
DEFAULT
$12,500
DOB (6)
IssuedViolationStatus
Dec 1, 2024FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2400016
DOB VIOLATION - ACTIVE
Feb 21, 2024HAZARDOUS CONDITION (FACADE)
CYCLE 9C UNSAFE REPORT FILED
#911725
DOB VIOLATION - ACTIVE
Apr 29, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2000031
DOB VIOLATION - ACTIVE
Feb 3, 2010ELEVATOR

#9028/325535
DOB VIOLATION - ACTIVE
Jun 16, 2000ELEVATOR
1P1366
#9011/124637
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#00029
DOB VIOLATION - ACTIVE
DOB NOW Safety (12)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Dec 1, 2024Energy Grade - LL33 FTP-EN-EGRDEA
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Feb 21, 2024Facades FISPHAZ
CYCLE 9C UNSAFE REPORT FILED
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Apr 29, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
HPD (6) · C 0 · B 4 · A 2
IssuedClassViolationCorrect by
Aug 17, 2020BApt PH · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT PH, 13th STORY, 1st APARTMENT FROM WEST AT NORTHSep 21, 2020
Aug 17, 2020BApt PH · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT PH, 13th STORY, 1st APARTMENT FROM WEST AT NORTHSep 21, 2020
Aug 17, 2020BApt PH · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR at north wall IN THE 2nd ROOM FROM EAST LOCATED AT APT PH, 13th STORY, 1st APARTMENT FROM WEST AT NORTHSep 21, 2020
Aug 17, 2020BApt PH · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT PH, 13th STORY, 1st APARTMENT FROM WEST AT NORTHSep 21, 2020
Mar 1, 2019AApt 5F · § 27-2005 ADM CODE REFIT WINDOWS UPPER AND LOWER (7WINDOWS IN TOTAL) IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTHJun 4, 2019
Jun 3, 2010AApt 12B · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM IN THE BATHROOM LOCATED AT APT 12B, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTSep 6, 2010

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen
Aug 13, 2026ECBConstruction: NO CERTIFICATE OF CORRECTION ON FILE PER COMMISSIONER'S REQUEST FOR CLASS 1 MECHANICAL WORK-WITHOUT-PERMIT VIOLATION #39157202R ISSUED 8/14/2025. SIGNED-OFF PERMITTED JOB FILING #M01273891-I1-GC-CX ISSUED 11/24Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 9:19 PM ET. BBL 1000530033.

Look up another building