2.5 floors · 41,756 sq ft · built 1997 · class M1 · owner of record: Allen A.M.E. Church
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-09-06 (Accepted). Agency page | Dec 31, 2026 in 67 days | 1 of 1 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 41,756 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 432 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 4, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSINER'S ORDER CONTAINED IN SUMMONS/VIOLATION #(39172587M) ISSUED ON 01-06-2026 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.NO PERMIT OR APPLICA #39199025K | Oct 13, 2026 DEFAULT | $2,530 |
| Jan 6, 2026 | Construction CLASS - 1 BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY FOR SUMMONS 39081124M. TEMPORARY CERTIFICATE OF OCCUPANCY Q400511380 EXPIRED 08/01/1998., OBTAIN A VALID CERTIFICATE OF OCCUPANCY #39172587M | Apr 21, 2026 ADMIT/IN-VIO | $0 |
| Nov 25, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, OBSERVED, NO CERTIFICATE OF CORRECTION FILED FOR SUMMONS # 39157972N #39168391Z | Feb 3, 2026 IN VIOLATION | $1,250 |
| Nov 25, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, OBSERVED, NO CERTIFICATE OF CORRECTION FILED FOR SUMMONS # 35369659X #39168390R | Feb 3, 2026 IN VIOLATION | $1,250 |
| Aug 21, 2025 | Construction CLASS - 1 BUILDING OR OPEN LOT OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. AT TIME OF INSPECTION, OBSERVED, THE BUILDING IS OCCUPIED WITHOUT CO. THE TCO# Q400511380 EXPIRED ON 08/01/1998., OBTAIN A VALID CERTIFICA #39157972N | Dec 4, 2026 DEFAULT | $12,500 |
| May 5, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, OBSERVED, NO CERTIFICATE OF CORRECTION FILED FOR THE SUMMONS# 3401191 #39147102K | Jun 16, 2026 DEFAULT | $0 |
| Mar 31, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION # 39081124M ISSUED ON 03/09/2023, AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1 RCNY 102-01(D)(2)., FILE A CERTIFI #39143318L | Sep 2, 2025 ADMIT/IN-VIO | $0 |
| Aug 13, 2024 | Construction CLASS - 2 FAILURE TO FILE A CERTIFICATE OF CORRECTION. NOTED SUMMONS#35502811L ISSUED ON 9/23/2020, A CERTIFICATE OF CORRECTION HAS NOT BEEN FILED., FILE A CERTIFICATE OF CORRECTION #39121793N | Oct 22, 2024 ADMIT/IN-VIO | $0 |
| Mar 9, 2023 | Construction CLASS - 1 BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. CERTIFICATE OF OCCUPANCY Q400511380 EXPIRED ON 08/01/1998., OBTAIN A VALID CERTIFICATE OF OCCUPANCY #39081124M | Aug 13, 2024 DEFAULT | $0 |
| Sep 23, 2020 | Construction CLASS - 1 REISSUE#35459578N ISSUED 11/4/19,NEW BLDG ON OPEN LOT OCCUPIED A VALIDCERT OF OCCUPANCY, IBSERVED RECORD OF TEMPORARY C OF O#Q400541380 FILED 12/15/91 EXP 8/1/98 CHURCH STATED MEETING ROOM/OFFICE/ACCESSORY CHUR #35502811L | Jun 15, 2021 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #02345 | DOB VIOLATION - ACTIVE |
| Dec 1, 2022 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2201941 | DOB VIOLATION - ACTIVE |
| Jun 1, 2022 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01232 | DOB VIOLATION - ACTIVE |
| Aug 2, 2021 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01246 | DOB VIOLATION - ACTIVE |
| Jun 2, 2021 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01901 | DOB VIOLATION - ACTIVE |
| Feb 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01104 | DOB VIOLATION - ACTIVE |
| Nov 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01375 | DOB VIOLATION - ACTIVE |
| Aug 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #02003 | DOB VIOLATION - ACTIVE |
| May 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #03588 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 1, 2022 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Jun 1, 2022 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2021 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jun 2, 2021 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Feb 2, 2021 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Feb 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Feb 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Aug 4, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSINER'S ORDER CONTAINED IN SUMMONS/VIOLATION #(39172587M) ISSUED ON 01-06-2026 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.NO PERMIT OR APPLICA | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 6:44 PM ET. BBL 4102700047.