2 floors · 1 apartments · 2,800 sq ft · built 1931 · class K4 · owner of record: Ultimate Realtors, Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-10-22 (Accepted). Agency page | Dec 31, 2026 in 45 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 289 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 776 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 2, 2026 | Construction CLASS - 2 CONTRARY TO CERTIFICATE OF OCCUPANCY. AT TIME OF INSPECTION RESPONDING TO AN INCIDENT OBSERVED AN APARTMENT AT 2FL SUBDIVIDED AND CREATED A COMMERCIAL SPACE AT 2FL. FIRE STARTED AT ILLEGAL COMMERCIAL SPACE AT 2 #39210434X | Jan 12, 2027 PENDING | $1,250 |
| Nov 2, 2026 | Construction CLASS - 2 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION RESPONDING TO AN INCIDENT OBSERVED FULL HEIGHT PARTITIONS SUB DIVIDING APT AT 2FL AND CREATING A COMMERCIAL SPACE AT FRONT OF 2FL. UPON REVIEW NO PERMITS WERE ISSUED #39210435H | Jan 12, 2027 PENDING | $1,250 |
| May 18, 2026 | Construction CLASS - 3 OBSERVED 3 NON-ILLUMINATED BUSINESS ACCESSORY SIGNS INSTALLED AT FRONT. TWO SIGNS APPROXIMATELY 2'X6' READ," RACHEL SALON". ONE SIGN APPROX. 2'X5', READS," BARBER SHOP". NO PERMIT FOR THESE SIGNS AT THE TIME OF #39189171J | Sep 8, 2026 DEFAULT | $500 |
| Nov 13, 2024 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS.ILLEGAL OCCUPANCY NOTED:2ND FLOOR CONVERTED/SUBDIVIDED/OCCUPIED AS AN UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT WITH 3 MASSAGE ROOMS.REM:DISCONTINUE ILLEGAL O #35684272L | Jan 21, 2025 DEFAULT | $6,250 |
| Nov 13, 2024 | Construction CLASS - 2 ILLEGAL USE IN A RESIDENTIAL DISTRICT.UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT.A PROHIBITED USE PER ZR 12-10 OPERATING IN A R6B ZONING DISTRICT ON THE 2ND FLOOR DOING BUSINESS AS M MASSAGE SPA WITH 3 MASSAGE #35684271J | Jan 21, 2025 DEFAULT | $6,250 |
| Nov 13, 2024 | Construction CLASS - 2 WORK WITHOUT A PERMIT AT 2ND FLOOR.NOTED:ERECTED FULL HEIGHT PARTITIONS TO CREATE 3 MASSAGE ROOMS AND SUBDIVIDE EXISTING CLASS A APARTMENT.INSTALLED WATER AND WASTE LINES FOR 2 PC BATHROOM.REM:OBTAIN PERMITS. #35684273N | Jan 21, 2025 DEFAULT | $6,250 |
| Mar 1, 2017 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDING. NOTED, PREMISES 2 STORY MIX USE DWELLING. 2ND FLOOR APT CONVERTED TO COMMERCIAL USE AND VIOLA #35227679J | Apr 18, 2017 WRITTEN OFF | $0 |
| Jan 21, 2017 | Construction CLASS - 2 WORK W/O PERMIT. NOTED: PREMISES 1 STY BARBER STORE(CUT MASTER)INSTALLED NEW OVER SIZED AWNING SIGNS AT THE FRONT TOP OF THE STORE. TOTAL FRONT LENGTH OF THE STORE APPROX 30'-0" & INSTALLED TOTAL 3 AWNING SIGNS #35215708L | Jul 25, 2017 WRITTEN OFF | $0 |
| Oct 22, 2010 | Construction CLASS - 2 OCCUPANCY CONTRARY TO DOB RECORDS DOB RECORDS JOB #401194444 INDICATES PREMISES AT 1ST FLOOR LVL ONLY 4 STORES W/ 1 CLASS A APT AT 2ND FLOOR LVL ILLEGAL OCCUPANCY NOTED AT 1ST FLOOR LVL FRONT CREATED 1 ADDITION #34888143N | Nov 22, 2011 WRITTEN OFF | $0 |
| Dec 2, 2005 | Construction Hazardous WORK WITHOUT PERMIT. NOTED: ERECTION OF PARTITION, WITH ELECTRIC TO CREATE 4 ROOMS IN CELLAR WITHOUT OBTAINING REQUIRED PERMITS. NOTED: LEGAL CELLAR USE, BOILER AND STORAGE ONLY. REMEDY: OBTAIN REQUIRED PERMITS #34503751R | Jan 17, 2006 IN VIOLATION | $0 |
| Oct 25, 2001 | Construction Hazardous FAILURE TO MAINTAIN. DEFECT IS 1 STORY EXTENSION WOOD FLOOR. JOISTS AT CELLAR SEVERELY ROTTED WERE JOIST END IN POCKETS OF MASONEY WALL FLOORS OUT OF PLAN AND SAGGING. CONCRETE ON FLOOR IS 8 INCHES THICH AND CA #34304898J | Dec 11, 2001 WRITTEN OFF | $0 |
| Oct 6, 2000 | Construction Hazardous WORK WITHOUT A PERMIT (HAZARDOUS)WORK NOTED:ERECTED NEW WOOD STAIRS FROM 1ST FLOOR TO CELLAR ALSO ERECTED PARTITIONS IN CELLAR TO SUBDIVIDE CREATING STORAGE ROOMS IN BOILER ROOM NO FIRE PROOFING IN CEILING AND #34263427P | Nov 21, 2000 WRITTEN OFF | $0 |
| Sep 12, 2000 | Construction Hazardous WORK WITHOUT A PERMIT BUILT STAIRCASE FROM 1ST FLOOR TO THE CELLAR,PARATITIONS,BOILER,DUCT WORK AT BASEMENT.ALSO-N FIRE RATED CEILING AT CELLAR AND NO BOILER ENCLOSURE.REMEDY:OBTAIN A PERMIT IF FEASIBLE OR REST #34258821R | Oct 31, 2000 WRITTEN OFF | $0 |
| Sep 11, 2000 | Construction Hazardous FAILURE TO MAINTAIN BUILDING-HAZARDOUS DEFECT IS:ENTIRE FLOOR SUPPORT BY TEMPORARY WOOD COLUMNS AND ROTTEN BEAMS AND TEMPORARY GIRDERS IN BASEMENT.REMEDY:MAKE SAFE IMMEDIATELY OBTAIN ENGINEERING REPORT,MAINTAIN #34258820P | Oct 31, 2000 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 2, 2026 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE DAMAGES AT A 2-STORY NFP BUILDING. AT TIME OF INSPECTION RESPONDING TO AN INCIDENT OBSERVED BROKEN WINDOWS, BROKEN/DAMAGED WALLS AND CEILINGS, ALSO OBSERVED BROKEN SKY LIGHT AND ROOF OPEN LEAVING IT EXPOSED TO THE ELEMENTS. #26-02510 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #22739 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #24206 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #28673 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #30323 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #29150 | DOB VIOLATION - ACTIVE |
| Oct 6, 2000 | CONSTRUCTION #10OC1 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Sep 12, 2000 | CONSTRUCTION #10BA01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #29451 | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #29331 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Nov 2, 2026 | DOB | CONSTRUCTION: STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE DAMAGES AT A 2-STORY NFP BUILDING. AT TIME OF INSPECTION RESPONDING TO AN INCIDENT OBSERVED BROKEN WINDOWS, BROKEN/DAMAGED WALLS AND CEILINGS, ALSO OBSERVED BROKEN SKY LIGHT AND ROOF OPEN LEAVING IT EXPOSED TO THE ELEMENTS. | Open |
| Nov 2, 2026 | ECB | Construction: CONTRARY TO CERTIFICATE OF OCCUPANCY. AT TIME OF INSPECTION RESPONDING TO AN INCIDENT OBSERVED AN APARTMENT AT 2FL SUBDIVIDED AND CREATED A COMMERCIAL SPACE AT 2FL. FIRE STARTED AT ILLEGAL COMMERCIAL SPACE AT 2 | Open |
| Nov 2, 2026 | ECB | Construction: WORK WITHOUT A PERMIT. AT TIME OF INSPECTION RESPONDING TO AN INCIDENT OBSERVED FULL HEIGHT PARTITIONS SUB DIVIDING APT AT 2FL AND CREATING A COMMERCIAL SPACE AT FRONT OF 2FL. UPON REVIEW NO PERMITS WERE ISSUED | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 1:30 PM ET. BBL 4095330011.