Brooklyn · Block 1695 · Lot 42 · 11233

11 Sumpter Street

3 floors · 37,941 sq ft · built 2007 · class M1 · owner of record: Christ Fellowship Bap

11open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
184dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 37,941 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 794 days
Next cycle year 2028

Open violations

ECB / OATH (6)
IssuedViolationHearingBalance
May 15, 2024Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #35554669Y ISSUED ON 3/29/2021, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERTI
#37028275Y
Apr 8, 2025
IN VIOLATION
$0
May 15, 2024Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #35554668M ISSUED ON 3/29/2021, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERTI
#37028274M
Apr 8, 2025
IN VIOLATION
$0
Mar 29, 2021Construction CLASS - 2
27-MISC,28-MISC BC-MISC MISC. VIOLATIONS NOTE:AT TIME OF INSPECTION,OBSERVED THE ABOVE PREMISES OCCUPIED & FAILS TO SIGN-OFF UNDER JOB #302041859 APPROVED ON 12/21/2006.REMEDY:COMPLY WITH CODE.
#35554668M
Aug 11, 2021
STIPULATION/IN-VIO
$0
Mar 29, 2021Construction CLASS - 2
ALTERED/CHANGED BLDG OCCUPIED W/OUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28.118.3.1- 28-118.3.2 NOTE:AT TIME OF INSPECTION,OBSERVED BLDGOCCUPIED AS PLACE OF ASSEMBLY W/OUT A VALID CERTIFICATE OF OCCUPANCY.
#35554669Y
Aug 11, 2021
STIPULATION/IN-VIO
$0
Nov 4, 2020Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS.VIOLATION #35475403L ISSUED ON 07-10-20 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.COMPLY WITH COMMISSIONER
#35520267X
Mar 17, 2021
IN VIOLATION
$0
Mar 30, 2014Construction CLASS - 1
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.NOTED:@ ROOF LEVEL THE STEEPLE WAS LOOSE & IN DANGER OF FALLING,STEEPLE WAS APPROX.35' IN HEIGHT AND THE UPPER TWO SECTIONS WERE LOOSE,LEANING & DETATCHING FROM
#35091015R
May 19, 2014
IN VIOLATION
$0
DOB (3)
IssuedViolationStatus
Dec 30, 2020CONSTRUCTION
FTM:STEEPLE@TOP ROOF SUFFRD MULTI FAILURES BOLTD CONNCT W/IN ITS STRCT MOVED IN WIND@VARIOUS POINTS.PER DSGN DWGS BLD PROV BY OWNR STEEPLE TO BE STEEPLE UNT#10 PER RPT DTD 9/24/20.STEEPLE DOES NOT MATCH DSGN DWGS &SUPP STRCT.OWNR RETN NYSPE &DOBREG CONTR EVAL STEEPLE-SUPPT-STRCT&RPR ALL WRK PERFM UN
#FEU30301IK
DOB VIOLATION - ACTIVE
Dec 30, 2020CONSTRUCTION
FTM:SEE DOB# 123020FEU30301IK FOR DESCRIPTION OF VIOLATING CONDNS.OWNR TO RETN NYS LIC'D PE&SURVEYOR TO DEVLP & IMPLMNT A MONITRNG CAMPAGN OF DEFCTVE STEEPLE MONITRNG PLN TO BE SUBM TO DOB-FEU NO LTR THN 1/15/21 MONITRNG TO CONTINE TIL STEEPLE SUPPRT STRCT HAS BEEN REPR'D AS REQ BY DOB# 123020FEU303
#FEU30302IK
DOB VIOLATION - ACTIVE
Jul 2, 2014FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00233
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Nov 14, 2016Elevators ACC1
Active
Jul 2, 2014AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 9:09 AM ET. BBL 3016950042.

Look up another building