Manhattan · Block 854 · Lot 7501 · 10010

11 Madison Avenue

30 floors · 1,630,256 sq ft · built 1932 · class RB · owner of record: Unavailable Owner

8open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
102dto Facade inspection report (Cycle 10A)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 102 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 1,630,256 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1146 days
Next cycle year 2029
Energy audit and retro-commissioning (2034) Likely applies
Local Law 87 · Calendar year 2034
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 854). Agency page

Dec 31, 2034
in 2972 days
Next due 2034

Open violations

ECB / OATH (2) · $1,250 owed
IssuedViolationHearingBalance
Sep 9, 2026Construction CLASS - 2
29 STORY BUILDING ALT2 FACADE WORK ACTIVE SITE. ON 9 FLOOR EXP#4.OBSERVED SUSPENDED SCAFFOLD INSTALLED CONTRARY TO APPROVED PLANS. MASONRY FRAMES ATTACHED TO EXISTING RAILINGS.PLANS DO NOT SHOW DETAILS FOR WIRE
#39558964K
Nov 19, 2026
PENDING
$1,250
Jul 8, 2026Cranes and Derricks CLASS - 1
OBS SUSPENDED SCAFFOLDS IN USE AND READILY AVAILABLE. SAFE AND PROPER INSPECTION WAS NOT PERFORMED. C-HOOK INSTALLATIONS LACKED MANUFACTURER SPECIFICATIONS, CUT SHEETS, AND INSTALLATION INSTRUCTIONS UPON REQUES
#39556436H
Sep 17, 2026
ADMIT/IN-VIO
$0
DOB (5)
IssuedViolationStatus
Jul 13, 2011ELEVATOR

#9028/391898
DOB VIOLATION - ACTIVE
Jul 13, 2011ELEVATOR

#9028/391899
DOB VIOLATION - ACTIVE
Jul 13, 2011ELEVATOR

#9028/391899
DOB VIOLATION - ACTIVE
Jul 8, 2011ELEVATOR

#9028/389999
DOB VIOLATION - ACTIVE
Jul 7, 2011ELEVATOR

#9028/389998
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Sep 9, 2026ECBConstruction: 29 STORY BUILDING ALT2 FACADE WORK ACTIVE SITE. ON 9 FLOOR EXP#4.OBSERVED SUSPENDED SCAFFOLD INSTALLED CONTRARY TO APPROVED PLANS. MASONRY FRAMES ATTACHED TO EXISTING RAILINGS.PLANS DO NOT SHOW DETAILS FOR WIREOpen
Aug 19, 2026DOB SafetyAEUHAZ: Closed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 9:37 AM ET. BBL 1008547501.