30 floors · 1,630,256 sq ft · built 1932 · class RB · owner of record: Unavailable Owner
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 102 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 1,630,256 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1146 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 854). Agency page | Dec 31, 2034 in 2972 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 9, 2026 | Construction CLASS - 2 29 STORY BUILDING ALT2 FACADE WORK ACTIVE SITE. ON 9 FLOOR EXP#4.OBSERVED SUSPENDED SCAFFOLD INSTALLED CONTRARY TO APPROVED PLANS. MASONRY FRAMES ATTACHED TO EXISTING RAILINGS.PLANS DO NOT SHOW DETAILS FOR WIRE #39558964K | Nov 19, 2026 PENDING | $1,250 |
| Jul 8, 2026 | Cranes and Derricks CLASS - 1 OBS SUSPENDED SCAFFOLDS IN USE AND READILY AVAILABLE. SAFE AND PROPER INSPECTION WAS NOT PERFORMED. C-HOOK INSTALLATIONS LACKED MANUFACTURER SPECIFICATIONS, CUT SHEETS, AND INSTALLATION INSTRUCTIONS UPON REQUES #39556436H | Sep 17, 2026 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 13, 2011 | ELEVATOR #9028/391898 | DOB VIOLATION - ACTIVE |
| Jul 13, 2011 | ELEVATOR #9028/391899 | DOB VIOLATION - ACTIVE |
| Jul 13, 2011 | ELEVATOR #9028/391899 | DOB VIOLATION - ACTIVE |
| Jul 8, 2011 | ELEVATOR #9028/389999 | DOB VIOLATION - ACTIVE |
| Jul 7, 2011 | ELEVATOR #9028/389998 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Sep 9, 2026 | ECB | Construction: 29 STORY BUILDING ALT2 FACADE WORK ACTIVE SITE. ON 9 FLOOR EXP#4.OBSERVED SUSPENDED SCAFFOLD INSTALLED CONTRARY TO APPROVED PLANS. MASONRY FRAMES ATTACHED TO EXISTING RAILINGS.PLANS DO NOT SHOW DETAILS FOR WIRE | Open |
| Aug 19, 2026 | DOB Safety | AEUHAZ: | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 9:37 AM ET. BBL 1008547501.