2 floors · 6 apartments · 7,471 sq ft · built 2017 · class C2 · owner of record: Victory Highland, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 42 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 58 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 286 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 773 days | Next cycle year 2028 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 10, 2026 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 6th ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 15, 2026 |
| Sep 10, 2026 | B | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 15, 2026 |
| Sep 10, 2026 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE MECHANICAL AIR VENT AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 15, 2026 |
| Sep 10, 2026 | A | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 14, 2026 |
| Sep 10, 2026 | A | Apt 2B · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL LIGHT SWITCH COVER AT WEST WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 14, 2026 |
| Sep 10, 2026 | A | Apt 2B · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL LIGHT SWITCH COVER AT NORTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 14, 2026 |
| Sep 10, 2026 | A | Apt 2B · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING 1ST ELECTRICAL OUTLET COVER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 14, 2026 |
| Sep 10, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 2nd STORY | Oct 15, 2026 |
| Sep 10, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 3rd STORY | Oct 15, 2026 |
| Sep 10, 2026 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT CELLAR LEVEL AT PUBLIC HALL | Oct 15, 2026 |
| Sep 10, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT CELLAR LEVEL AT PUBLIC HALL | Oct 15, 2026 |
| Sep 10, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT CELLAR LEVEL AT PUBLIC HALL | Dec 14, 2026 |
| Sep 10, 2026 | A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SAFETY CAPS AT ELECTRICAL OUTLET AT WEST WALL AT PUBLIC HALL, 1st STORY | Dec 14, 2026 |
| Sep 10, 2026 | A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED CEILING AT CELLAR LEVEL AT PUBLIC HALL | Dec 14, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 10, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 6th ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 10, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 10, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE MECHANICAL AIR VENT AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 10, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 10, 2026 | HPD A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL LIGHT SWITCH COVER AT WEST WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 10, 2026 | HPD A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL LIGHT SWITCH COVER AT NORTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 10, 2026 | HPD A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING 1ST ELECTRICAL OUTLET COVER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 10, 2026 | HPD B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 2nd STORY | Open |
| Sep 10, 2026 | HPD B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 3rd STORY | Open |
| Sep 10, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT CELLAR LEVEL AT PUBLIC HALL | Open |
| Sep 10, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT CELLAR LEVEL AT PUBLIC HALL | Open |
| Sep 10, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT CELLAR LEVEL AT PUBLIC HALL | Open |
| Sep 10, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR AT NORTH AT PUBLIC HALL, 1st STORY | Closed |
| Sep 10, 2026 | HPD A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SAFETY CAPS AT ELECTRICAL OUTLET AT WEST WALL AT PUBLIC HALL, 1st STORY | Open |
| Sep 10, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT OBSERVED CEILING AT CELLAR LEVEL AT PUBLIC HALL | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 12:16 AM ET. BBL 5005930735.