5 floors · 150,000 sq ft · built 1901 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 150,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2634). Agency page | Dec 31, 2034 in 2989 days | Next due 2034 |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-21 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 9, 2026 | Construction CLASS - 2 REISSUE ON ECB#35693395X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:CRACKED OR MISSING WIRE MESH PANELS AND/OR VISION PANELS ON STAIRWELLS AND VISION PANELS ON SMOKE DOORS ON 5TH FL TO 4TH FL S #35734666R | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 9, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:STORAGE OFCOMBUSTIBLE MATERIAL BOXES AND JANTORIAL EQUIPMENT IN ELECTRICAL SWITCH GEAR ROOM WHICH IS NOT ALLOWED AT BASEMENT LEVEL OBSERVED UPON INSPE #35734668K | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 9, 2026 | Construction CLASS - 2 REISSUE ON ECB#35693398L FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:FIRE RATED CLASSROOMS AND SMOKE DOORS NOT SELF CLOSING DUE TO BINDING,MISSING AND OR FAULTY HARDWARE ON CLASSROOMS 505,504,40 #35734663L | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 9, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT THE MAIN ENTRANCE AT EXPOSURE#1 AND 4 AT RAMP ACCESS WITH MISSING CONCRETE CREATING A DIVOT AND RAISED CONCRETE SPRAY PAINTED CAUSING A POTENTIAL A #35734667Z | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 9, 2026 | Construction CLASS - 2 REISSUE ON ECB#3569336H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER.NOTED:AT CELLAR LEVEL IN BOILER ROOM HAS MISSING TERRA COTTA CEILING BLOCK MISSING EXPOSING STEEL BEAMS MAKING IT EXPOSED AND NOT FIR #35734665P | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 9, 2026 | Construction CLASS - 2 REISSUE ON ECB#35693397J FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED DISCHARGES EXIT AND EX #35734664N | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 9, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT BULKHEAD LEVEL ON 8TH FLOOR TOWER LEADING TO BULKHEAD AND 7TH FL STAIRCASE HAS MISSING FIREPROOFING MONOKOTE IN SEVERAL LOCATIONS ON STEEL BEAMS OB #35734669M | Aug 7, 2026 POP/IN-VIO | $0 |
| Aug 20, 2025 | Construction CLASS - 2 REISSUE: 35679068H-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: GLASS PANELS ARE MISSING ON DOOR AND IN STAIRWELLS THROUGHOUT ENTIRE. REMEDY: COMPLY WITH CODE. #35693395X | Sep 12, 2025 POP/IN-VIO | $0 |
| Aug 20, 2025 | Construction CLASS - 2 REISSUE: 35679066Y-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381 EMERGENCY LIGHTS NOT WORKING THROUGHOUT ENTIRE SCHOOL #35693397J | Sep 12, 2025 POP/IN-VIO | $0 |
| Aug 20, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: CORRIDOR DOORS ON ALL FLOORS ARE NOT CLOSING PROPERLY. ALL WOODS THROUGHOUT CORRIDORSAND EXIT TO STAIRWAY NOT CLOSING PROPERLY. REMEDY: COMPLY WITH CODE. #35693398L | Sep 12, 2025 POP/IN-VIO | $0 |
| Aug 20, 2025 | Construction CLASS - 2 REISSUE: 35679067X-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. CELLAR LEVEL CEILING IN DISREPAIR. TERRA COTTA CEILING. REMEDY: COMPLY WITH CODE. #35693396H | Sep 12, 2025 POP/IN-VIO | $0 |
| Aug 16, 2024 | Construction CLASS - 2 REISSUE#35672131J FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.WIRE MESH GLASS PANEL ARE MISSING THROUGHOUT.REM:COMPLY WITH CODE. #35679068H | Nov 1, 2024 POP/IN-VIO | $0 |
| Aug 16, 2024 | Construction CLASS - 2 REISSUE#35672132L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.CELLAR LEVEL CEILING IN DISREPAIR THROUGHT.REM:COMPLY WITH CODE. #35679067X | Nov 1, 2024 POP/IN-VIO | $0 |
| Aug 16, 2024 | Construction CLASS - 2 REISSUE#35672135R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381 EMERGENCY LIGHTS NOT WORKING THROUGHOUT ENTIRE SCHOOL.REM #35679066Y | Nov 1, 2024 POP/IN-VIO | $0 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 6, 7A, AND 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORTREQUIRED BY 28-302.5 FOR CONTROL #807699. REMEDY: FILE ACCEPTABLE REPO #37026019X | Jan 26, 2024 POP/IN-VIO | $0 |
| Jan 19, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT TIME OF INSPECTION OBSERVED EMERGENCY LIGHTS NOT OPERABLE WHEN TESTED.AT #35672135R | May 5, 2023 POP/IN-VIO | $0 |
| Jan 19, 2023 | Construction CLASS - 2 REISSUE#35644535H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT TIME OF INSPECTION OBSERVED AT CELLAR LEVEL BOILER ROOM CEILING HAS SPALLING/MISSING PLASTER EXPOSING STRUCTURAL STEEL BEAM.VIOLATION 3 #35672132L | May 5, 2023 POP/IN-VIO | $0 |
| Jan 19, 2023 | Construction CLASS - 2 REISSUE#35644536J FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT TIME OF INSPECTION OBSERVED MISSING WIRE MESH GLASS PANELS.AT STAIRCASE A,E,F & G THROUGHOUT VARIOUS FLOORS.AT EXIT 1 DOOR AND CLASSROO #35672131J | May 5, 2023 POP/IN-VIO | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#907699.REM:SUBMIT ACCEPTABLE REQUIRED T #37023494L | Feb 17, 2023 POP/IN-VIO | $0 |
| Mar 3, 2022 | Construction CLASS - 2 REISSUED #35540248Z FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT TIME OF INSPECTION OBSERVED AT CELLAR LEVEL BOILER ROOM CEILING HAS SPALLING AND MISSING PLASTER EXPOSING STRUCTURAL STEEL BEAM #35644535H | Jun 3, 2022 POP/IN-VIO | $0 |
| May 6, 2021 | Elevators CLASS - 1 97X17-CLASS 1 RTS REPAIR WHEEL CHAIR LIFT & RESTORE TO SERVICE IMMEDATELY CALL NYC DOB ELEVATION DIVISION FOR REINSPECTION. #38274107P | Aug 20, 2021 POP/IN-VIO | $0 |
| Feb 3, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER:NOTED:OBSERVED@CELLAR LEVEL,BOILERRM CEILING HAS SPALLING&MISSING PLASTER EXPOSING STRUCTURAL STEEL BEAMS@VARIOUS LOCATIONS,ALSO MISSING PIECES OF CEILING DRYWA #35540248Z | May 7, 2021 POP/IN-VIO | $0 |
| May 29, 2015 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE AMENDED CYCLE 7 REPORT TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW FISP REPORT. REMEDY: FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPAIR #36027670N | Aug 21, 2015 POP/IN-VIO | $0 |
| Nov 28, 2014 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE AMENDED CYCLE 7 REPORT TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW FISP REPORT. REMEDY: FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPAIR #36026542Y | Jan 30, 2015 POP/IN-VIO | $0 |
| Dec 29, 2011 | Local Law CLASS - 2 FAILURE TO FILE AN AMENDED 6TH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT. 36017139J. REMEDY: FILE AN AMENDED REPORT FOLLOWING RE #36017668P | Apr 20, 2012 POP/IN-VIO | $0 |
| Jun 14, 2011 | Local Law CLASS - 2 FAILURE TO FILE AN AMENDED 6TH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LL11/98REPORT.36014996K.REM:FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPAIRS #36017139J | Aug 5, 2011 POP/IN-VIO | $0 |
| Sep 17, 2010 | Construction CLASS - 2 FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT REM: FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPAIR #36014996K | Dec 17, 2010 PENDING | $0 |
| Dec 4, 2009 | Construction CLASS - 2 FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT REMEDY:FILE AN AMENDED REPORT FOLLOWING REPAIRS OF TH #36010580Z | Feb 5, 2010 WRITTEN OFF | $0 |
| May 22, 2009 | Construction CLASS - 2 FAILURE TO SUBMIT AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPARTMENT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT. FILE AN AMENDED REPORT FOLLOWING REMEDIAL RE #36009444X | Jul 24, 2009 WRITTEN OFF | $0 |
| Nov 28, 2008 | Construction CLASS - 2 FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT REMEDY:FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPA #36005891J | Apr 17, 2009 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05883 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05882 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05880 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05881 | DOB VIOLATION - ACTIVE |
| May 1, 2024 | RETAINING WALL FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 #00037 | DOB VIOLATION - ACTIVE |
| May 1, 2024 | RETAINING WALL FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 #00038 | DOB VIOLATION - ACTIVE |
| May 1, 2024 | RETAINING WALL FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 #00015 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #27968 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #44211 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00834 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #10722 | DOB VIOLATION - ACTIVE |
| Jul 23, 2018 | FACADE SAFETY PROGRAM #HAZ87526 | DOB VIOLATION - ACTIVE |
| Apr 26, 2012 | LL11/98-LOCAL LAW 11/98 - FACADE UNSAFE LOCAL LAW 11/98 REPORT FILED #HAZ73554 | DOB VIOLATION - ACTIVE |
| Mar 31, 2008 | EMERGENCY POWER #NRF01160 | DOB VIOLATION - ACTIVE |
| Jun 25, 2007 | LOCAL LAW 11/98 - FACADE #HAZ1491 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02028 | DOB VIOLATION - ACTIVE |
| Feb 16, 1989 | ELEVATOR #144504/02 | DOB VIOLATION - ACTIVE |
| Feb 16, 1989 | ELEVATOR #144504/03 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Apr 23, 2025 | Retaining Walls | Active |
| Apr 23, 2025 | Retaining Walls | Active |
| Apr 23, 2025 | Retaining Walls | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| May 1, 2024 | Retaining Walls FTF-RW-INITL | Active |
| May 1, 2024 | Retaining Walls FTF-RW-INITL | Active |
| May 1, 2024 | Retaining Walls FTF-RW-INITL | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jul 23, 2018 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Apr 26, 2012 | Facades LL11/98 UNSAFE LOCAL LAW 11/98 REPORT FILED | Active |
| Mar 31, 2008 | Emergency Power FTF-EL-ENRF | Active |
| Jun 25, 2007 | Facades L1198 CYCLE 6 UNSAFE REPORT FILED | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 9, 2026 | ECB | Construction: REISSUE ON ECB#35693395X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:CRACKED OR MISSING WIRE MESH PANELS AND/OR VISION PANELS ON STAIRWELLS AND VISION PANELS ON SMOKE DOORS ON 5TH FL TO 4TH FL S | Open |
| Jul 9, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:STORAGE OFCOMBUSTIBLE MATERIAL BOXES AND JANTORIAL EQUIPMENT IN ELECTRICAL SWITCH GEAR ROOM WHICH IS NOT ALLOWED AT BASEMENT LEVEL OBSERVED UPON INSPE | Open |
| Jul 9, 2026 | ECB | Construction: REISSUE ON ECB#35693398L FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:FIRE RATED CLASSROOMS AND SMOKE DOORS NOT SELF CLOSING DUE TO BINDING,MISSING AND OR FAULTY HARDWARE ON CLASSROOMS 505,504,40 | Open |
| Jul 9, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT THE MAIN ENTRANCE AT EXPOSURE#1 AND 4 AT RAMP ACCESS WITH MISSING CONCRETE CREATING A DIVOT AND RAISED CONCRETE SPRAY PAINTED CAUSING A POTENTIAL A | Open |
| Jul 9, 2026 | ECB | Construction: REISSUE ON ECB#3569336H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER.NOTED:AT CELLAR LEVEL IN BOILER ROOM HAS MISSING TERRA COTTA CEILING BLOCK MISSING EXPOSING STEEL BEAMS MAKING IT EXPOSED AND NOT FIR | Open |
| Jul 9, 2026 | ECB | Construction: REISSUE ON ECB#35693397J FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED DISCHARGES EXIT AND EX | Open |
| Jul 9, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT BULKHEAD LEVEL ON 8TH FLOOR TOWER LEADING TO BULKHEAD AND 7TH FL STAIRCASE HAS MISSING FIREPROOFING MONOKOTE IN SEVERAL LOCATIONS ON STEEL BEAMS OB | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)