7 floors · 41,212 sq ft · built 2018 · class H3 · owner of record: American Dream Ii Hotel Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 116 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 41,212 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 795 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 22, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION OBSERVED AT EXPOSURE 3(SOUTH) DISPLACED OR BRICKS THAT APPEAR TO HAVE MOVEMENT. REMEDY: PROVIDE ADEQUATE SAFETY MEASUR #35731040L | Nov 25, 2026 PENDING | $5,000 |
| Apr 6, 2026 | Elevators CLASS - 2 CLASS 2: ELEVATOR DEVICE INSTALLED IN 2020 HAS NOT UNDERGONE THE REQUIRED CATEGORY 5 FULL LOAD SAFETY TEST SINCE INSTALLATION, IN VIOLATION OF PERIODIC INSPECTION AND TESTING REQUIREMENTS. REMEDY: PERFORM A CAT #39183329N | Jun 10, 2026 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| May 21, 2026 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT EXPO#4 A SECTION OF MASONRY BRICK VENEER HAS DISLODGED ALONG WITH VERTICAL CRACK AT EXPOSURE#1/4, DAMAGED WINDOWS AT 3RD, 4TH FLOOR DUE TO FIRE AT ADJOINING PROPERTY 1086 MYRTLE AVENUE. #26-01359 | DOB VIOLATION - ACTIVE |
| May 21, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPOSURE#4 A SECTION APPROXIMATELY 4'X3' OF BRICK VENEER HAS DISLODGED ALONG WITH A 3' VERTICAL CRACK AT EXPOSURE#1/4 DUE TO FIRE AT ADJOINING PROPERTY 1086. #26-01358 | DOB VIOLATION - ACTIVE |
| Sep 21, 2021 | ELEVATOR #9027/709003 | DOB VIOLATION - ACTIVE |
| Sep 21, 2021 | ELEVATOR #9027/709004 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Sep 23, 2026 | Parking Structures FTF-PS-INITL Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
| Sep 23, 2026 | DOB Safety | Parking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Open |
| Jul 22, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION OBSERVED AT EXPOSURE 3(SOUTH) DISPLACED OR BRICKS THAT APPEAR TO HAVE MOVEMENT. REMEDY: PROVIDE ADEQUATE SAFETY MEASUR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 7:47 AM ET. BBL 3015860008.