3 floors · 31,500 sq ft · built 1931 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 31,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 164 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 164 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 774 days | Next cycle year 2028 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-24 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 4, 2026 | Construction CLASS - 2 RE-ISSUE #35692184L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: THE SCHOOL SIDEWALK ON TARGEE ST SIDED(EXP. 4) INSIDE THEFENCE IS CHIPPED, LOOSE AND FALLING APART. REMEDY: REPAIR/REPLACE CONC #35724915J | Mar 9, 2026 POP/IN-VIO | $0 |
| Feb 4, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: THE(VINLY) FLOOR TILES IN CLASSROOMS ON THE SECOND FLOOR AND 1ST FLOOR CORRIDORS ARE NOT STICKING. SOME CHIPPED, BROKEN AND COMING OF FLOOR. CAUSING #35724917N | Mar 9, 2026 POP/IN-VIO | $0 |
| Feb 4, 2026 | Construction CLASS - 2 RE-ISSUE #35692183J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1; 27-381. NOTED: SEVERAL EMERGENCY LIGHTS WERE NOT OPERATIONA #35724916L | Mar 9, 2026 POP/IN-VIO | $0 |
| Feb 24, 2025 | Construction CLASS - 2 RE-ISSUE #35679088P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1; 27-381. NOTED: AT T. O. I. THERE WERE SEVERAL EM. LIGHTS SC #35692183J | Apr 30, 2025 POP/IN-VIO | $0 |
| Feb 24, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT T. O.I. THE CONCRETE WALKWAY AT EXPOSURE 4 FROM TARQEE STREET TO THE SCHOOLYARD. CONCRETE IS CHIPPED, CRACKED DETERIORATING AND FALLING APART MAK #35692184L | Apr 30, 2025 POP/IN-VIO | $0 |
| Sep 16, 2024 | Construction CLASS - 2 RE-ISSUE #35672810L. FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. THERE WERE SEVERAL EMERGENCY LIGHTS THROUGHOUT T #35679088P | Oct 23, 2024 POP/IN-VIO | $0 |
| Apr 13, 2023 | Construction CLASS - 2 RE-ISSUE #35654941M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES +PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED:SEVERAL EMERGENCY LITES SCATTERED THROUGHOUT THE #35672810L | Jun 7, 2023 POP/IN-VIO | $0 |
| Aug 30, 2017 | Construction CLASS - 2 3307.6.5.11 THE PERMIT HOLDER FOR THE SHED SHALL NOTIFY THE DEPT NO MORE THAN TWO BUSINESS DAYS FOLLOWING THE COMPLETE REMOVAL OF SIDEWALK SHED. NOTED: AT TIME OF INSPECTION THERE IS NO SHED AT SITE PERMIT # #35259146N | Oct 18, 2017 IN VIOLATION | $0 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 10:41 AM ET. BBL 5028850001.