3 floors · 3 apartments · 3,093 sq ft · built 2005 · class C0 · owner of record: 109 Hart 11206 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 302 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 789 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 29, 2013 | Plumbing CLASS - 1 GAS BEING SUPPLIED TO BLDG W/O INSPECTION AND CERTIFICATION BY DOB. OWNER INSTALLED ILLEGAL GAS CONNECTION FROM 2ND FLR HOT WATER HEATER TO SUPPLY GAS TO 3RD FLR APT HWH 3RD FLR APT GAS METER WAS LOCKED AND #35014151M | Jun 17, 2013 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 31, 2013 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00147 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 31, 2013 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 18, 2013 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AND CARDBOARD BOXES AT 1ST AND 3RD STORY AT PUBLIC HALL | Apr 22, 2013 |
| Mar 15, 2013 | C | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ALL STORIES AT PUBLIC HALL | Mar 21, 2013 |
| Mar 15, 2013 | B | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRING RUNING THROUGH OUT ALL STORIES AT PUBLIC HALL | Apr 19, 2013 |