4 floors · 183,070 sq ft · built 2001 · class W1 · owner of record: Nyc Department Of Education

36open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
178dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 57 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 183,070 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 178 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 178 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 788 days
Next cycle year 2028
Energy audit and retro-commissioning (2032) Likely applies
Local Law 87 · Calendar year 2032
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 9172). Agency page

Dec 31, 2032
in 2249 days
Next due 2032
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-19 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (8)
IssuedViolationHearingBalance
Apr 16, 2026Construction CLASS - 2
REISSUE:35691775Z DATE OF ISSUE:04.10.2025 ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-118.3.2.TEMPORARY CERTIFICATE OF OCCUPANCY C/O#401146808T005 EXP.11/28/
#35727219J
May 26, 2026
POP/IN-VIO
$0
Apr 16, 2026Construction CLASS - 2
REISSUE#35691776K DATE OF ISSUE:04.10.2025 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT STAIRCASE C BULKHEAD 10'VERTICAL CRACK IN CMU BLOCK WALL.ALSO AT
#35727218H
May 26, 2026
POP/IN-VIO
$0
Apr 10, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT STAIRCASE C BULKHEAD. 10' VERTICAL CRACK IN CMU BLOCK WALL. ALSO AT CELLAR BOILER ROOM, BEHIND BOILERS 12' VERTICAL CRACK IN FOUNDATION WALL. REME
#35691776K
Nov 7, 2025
POP/IN-VIO
$0
Apr 10, 2025Construction CLASS - 2
REISSUE #35677154P. ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-118.3.2. TCO #401146808 EXPIRED ON 11/28/2026, NO RENEWAL OR FINAL C OF O ON FILE. BUILDING WA
#35691775Z
Nov 7, 2025
POP/IN-VIO
$0
Apr 25, 2024Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT BULKHEAD AT STAIR C CMU CRACK AND PLAYGROUND FLOORING CRACKS THROUGHOUT. REMEDY: REPAIR AND/OR REPLACE.
#35677152L
Aug 20, 2024
POP/IN-VIO
$0
Apr 25, 2024Construction CLASS - 2
REISSUE #35495392N. ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-118.3.2. TEMPORARY C/O #401146808T005 EXP:11/28/2006. REMEDY: OBTAIN VALID C OF O DISCONTINUE
#35677154P
Aug 20, 2024
POP/IN-VIO
$0
Mar 23, 2021Construction CLASS - 2
REISSUE: 35495392N ALTERED/CHANGED BLDG OCCUPIED W/O A VALID CERT OF OCCUPANCY AS PER 28-118.3.1;28-118.3.2. NOTED: BLDG ERECTED UNDER NB APPLICATION#401146808 NOW ITS A SCHOOL. REMEDY: COMPLY W/OCDE.
#35555760J
Jul 13, 2021
POP/IN-VIO
$0
May 12, 2020Construction CLASS - 2
ALTERED/CHANGE BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-118.3.2.NOTED BUILDING ERECTED UNDER NB APPLICATION #401146808 AND UNDER A TEMPORARY CERTIFICATE OF OCCUPANCY THAT
#35495392N
Sep 8, 2020
POP/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (28)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 4, 2026, 9:57 AM ET. BBL 4091720001.

Look up another building