Queens · Block 11476 · Lot 71 · 11420

109-09 Rockaway Boulevard

2 floors · 2 apartments · 7,985 sq ft · built 1971 · class K9 · owner of record: 109-15 Llc

17open violations
$4,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
48dto Annual boiler inspection (4 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 48 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-09-10 (Accepted). Agency page

Dec 31, 2026
in 48 days
4 of 4 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 292 days
Required only if the owner doesn't live there
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 779 days
Next cycle year 2028

Open violations

ECB / OATH (3) · $4,250 owed
IssuedViolationHearingBalance
Feb 26, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 39122921N, FILE A CERTIFICATE OF CORRECTION
#39178421J
May 5, 2026
IN VIOLATION
$625
Aug 23, 2024Construction CLASS - 1
AT TIME OF INSPECTION OBSERVED AT ROOF LEVEL STORED EXCESSIVE AMOUNT DEBRIS AND MERCHANDISE (CHAIRS,TABLES, BUCKETS,TENT AND ETC.) ALSO EXIT DOOR OBSTRUCTED BY REFRIGERATOR., REPAIR AND/REPLACE
#39122921N
Oct 29, 2024
DEFAULT
$3,125
Aug 2, 2024Construction CLASS - 3
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT FIRST FLOOR GROUND LEVEL OBSERVED CANOPY WITH TARPS, WOOD, METAL POLES, ON SIDEWALK IN DISREPAIR IMPOSING HAZARD., REPAIR AND OR REPLACE
#39120744M
Oct 8, 2024
DEFAULT
$500
DOB (4)
IssuedViolationStatus
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#20703
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#20704
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#20705
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#20706
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
HPD (6) · C 0 · B 4 · A 2
IssuedClassViolationCorrect by
Feb 13, 2026BApt 2A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 20, 2026
Feb 13, 2026BApt 2A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 20, 2026
Feb 13, 2026AApt 2A · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMay 19, 2026
Jan 30, 2026BApt 2A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 6, 2026
Jan 30, 2026BApt 2A · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMar 6, 2026
Jan 30, 2026AApt 2A · § 27-2010, 2011, 2012 ADMIN CODE: CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE EVIDENCE OF MOLD AT CAULKING ALONG BATHTUB IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMay 5, 2026

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 13, 2026, 5:38 PM ET. BBL 4114760071.

Look up another building