Bronx · Block 2371 · Lot 1 · 10456

1088 Washington Avenue

6 floors · 21 apartments · 21,816 sq ft · built 1918 · class C7 · owner of record: 163rd Street Bronx Housing Development F Und Co,Inc

20open violations
$7,500ECB/OATH penalties owed
2HPD class C (immediately hazardous)
51dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 51 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 51 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 67 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 295 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 782 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-14 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3) · $7,500 owed
IssuedViolationHearingBalance
Sep 16, 2026Construction CLASS - 1
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER DOB PARAPET VIO#060326PI20302AG AND DOB CONTROL #348592 DATED 06/03/2026. NO COMPLIANCE ON FILE FOR ANNUAL PARAPET OBSERVATION REPORT. REMEDY: COMPLY WITH THE COMMISS
#35733238X
Dec 4, 2026
PENDING
$2,500
Aug 14, 2026Construction CLASS - 1
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. DOB-FTC VIOLATION #071026PI20304SB UNDER CONTROL #370539, DATED ON 07-10-2026, NO COMPLIANCE ONFILE FOR CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'
#35718766Y
Dec 14, 2026
PENDING
$2,500
Jun 3, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. SUBJECT IS A 6-STORY BUILDING, MIXED USE OCCUPANCY. SEMI-DETACHED ON A CORNER LOT. EXP 2(MAIN ENTRANCE) IS ALONG WASHINGTON AVENUE, EXP 1 IS ALONG 166 ST
#35718642M
Aug 7, 2026
IN VIOLATION
$2,500
DOB (3)
IssuedViolationStatus
Jul 10, 2026CONSTRUCTION
FTC W/COMMISSIONER'S ORDER CONTROL#348591 VIO#060326PI20301AG DATED 06/03/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 07/03/26, AS OF 07/10/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#348591 VIO#060326PI20301AG
#PI20304SB
DOB VIOLATION - ACTIVE
Jun 3, 2026CONSTRUCTION
CORRECTIVE ACTION PLAN REQ'D-OBSVD ON EXP1 MULT VERT MASONRY CRACKS BTWN WINDOW OPENINGS. EXP2 HAS MULT STONE HEADERS W/CRACKS AT VARIOUS LOCATIONS/WINDOW OPENINGS. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING WITH DOB/NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN
#PI20301AG
DOB VIOLATION - ACTIVE
Jun 3, 2026CONSTRUCTION
FTM BLDG IN A CODE COMPLIANT MANNER-EXP2 @ PARAPET WALL HAS VERT MASONRY STEP CRACK @ RIGHT SIDE OF DUCT RISER. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING 2024 SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 TO BE REC'D BY DOB NO LATER THAN 6/17/26
#PI20302AG
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
HPD (13) · C 2 · B 10 · A 1
IssuedClassViolationCorrect by
Jul 30, 2026BApt 5C · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORYSep 3, 2026
Jul 30, 2026CApt 5C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORYAug 25, 2026
Jul 30, 2026CApt 5C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORYAug 25, 2026
Jul 30, 2026BApt 5C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER AND LOWER WINDOW SASH AT 2ND WINDOW FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5C, 5th STORYSep 3, 2026
Jul 30, 2026BApt 5C · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORYSep 3, 2026
May 13, 2025BApt 2A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL SADDLE IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJun 17, 2025
Jul 11, 2023BApt 5A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BATHTUB REGLAZE WITH PORCELAIN FINISH IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EASTAug 15, 2023
May 14, 2018BApt 4B · § 27-2005, 2012 HMC & § 309 MDL: ABATE THE NUISANCE CONSISTING OF EXCESSIVE STORAGE OF MATERIAL .... IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTJun 18, 2018
May 14, 2018BApt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE FOYER LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTJun 18, 2018
Dec 26, 2013BApt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTJan 30, 2014
Dec 26, 2013BApt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTJan 30, 2014
Dec 26, 2013AApt 4B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING, DOORS AND WOOD TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTMar 31, 2014
Dec 26, 2013BApt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTJan 30, 2014

Issued in the last 120 days

DateSourceWhatNow
Sep 16, 2026ECBConstruction: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER DOB PARAPET VIO#060326PI20302AG AND DOB CONTROL #348592 DATED 06/03/2026. NO COMPLIANCE ON FILE FOR ANNUAL PARAPET OBSERVATION REPORT. REMEDY: COMPLY WITH THE COMMISSOpen
Aug 14, 2026ECBConstruction: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. DOB-FTC VIOLATION #071026PI20304SB UNDER CONTROL #370539, DATED ON 07-10-2026, NO COMPLIANCE ONFILE FOR CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'Open
Jul 30, 2026HPD C§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF VINYL FLOOR TILES IN THE FOYER LOCATED AT APT 5C, 5th STORYClosed
Jul 30, 2026HPD B§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORYOpen
Jul 30, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORYOpen
Jul 30, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORYOpen
Jul 30, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER AND LOWER WINDOW SASH AT 2ND WINDOW FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5C, 5th STORYOpen
Jul 30, 2026HPD B§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORYOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 10, 2026, 5:29 AM ET. BBL 2023710001.

Look up another building