33open violations
$15,280ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 60 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 60 days
Annual
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-13 (Accepted). Agency page

Dec 31, 2026
in 60 days
1 of 3 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 76 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 216,139 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 181 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 181 days
Annual filing
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $24,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 477 days
No Cycle 10 report on record yet
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1500). Agency page

Dec 31, 2030
in 1521 days
Next due 2030

Open violations

ECB / OATH (3) · $15,280 owed
IssuedViolationHearingBalance
Apr 29, 2026Unknown CLASS - 2
APARTMENT 2F UNDER RENOVATION AT THE TIME OF INSPECTION. I OBSERVED UNSAFE UNSUITABLE ELECTRICAL CONDITIONS GENERAL WIRING, LIGHT FIXTURES,RECEPTACLES AND BREAKER PANEL DAMAGE DUE TO FIRE AND WATER, COMPLY WITH
#39186512P
Jul 9, 2026
DEFAULT
$4,000
Apr 20, 2026Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #905499. REMEDY: FILE ACCEPTABLE REPORT.
#37036770L
Aug 13, 2026
DEFAULT
$6,250
Mar 17, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING FACADE WALLS AND APPURTENANCES.NOTE:AT THE TIME OF INSPECTION I OBSERVED AT EX#1,EAST ELEVATION,CRACKED AND SPALLING CONCRETE BETWEEN 14TH AND 15TH FLOOR.AT EX#4,NORTH ELEVATION,CRA
#35726884P
Apr 19, 2027
DEFAULT
$5,030
DOB (10)
IssuedViolationStatus
Apr 29, 2026CONSTRUCTION
APARTMENT 2F ELECTRICAL GENERAL WIRING, LIGHT FIXTURES,RECEPTACLES AND BREAKER PANEL DAMAGE DUE TO FIRE AND WATER
#26-01148
DOB VIOLATION - ACTIVE
Jun 23, 2024FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
#00294
DOB VIOLATION - ACTIVE
Nov 1, 2023FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
FAILURE TO CORRECT SWARMP CONDITIONS
#00172
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#26284
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#03530
DOB VIOLATION - ACTIVE
Apr 22, 2023FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
#00793
DOB VIOLATION - ACTIVE
Mar 20, 2023HAZARDOUS CONDITION (FACADE)
CYCLE 9B UNSAFE REPORT FILED
#910985
DOB VIOLATION - ACTIVE
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#00078
DOB VIOLATION - ACTIVE
Aug 21, 2022FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2021
#10141
DOB VIOLATION - ACTIVE
Sep 27, 2019ELEVATOR

#9028/649635
DOB VIOLATION - ACTIVE
DOB NOW Safety (20)
IssuedViolationStatus
Sep 25, 2026Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Jul 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 8)
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Jun 23, 2024Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 1, 2023Facades FISPFCS
CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 22, 2023Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Mar 20, 2023Facades FISPHAZ
CYCLE 9B UNSAFE REPORT FILED
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Aug 21, 2022Retro-Commissioning - LL87 FTF-EN-EARCX
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Open
Jul 30, 2026DOB SafetyAEUHAZ: Open