Queens · Block 2218 · Lot 21 · 11375

108-32 68 Drive

3 floors · 36,962 sq ft · built 1930 · class W1 · owner of record: Nyc Department Of Education

2open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
69dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 69 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 36,962 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 190 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 190 days
Annual filing
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-24 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Jul 21, 2026Construction CLASS - 2
REISSUE#35725249L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT THE TIME OF INSPECTION OBSERVED IN ELECTRIC METER ROOM WATER DAMAGE ON THE FLOOR & ON BOTTOM OF EQUIPMENT HAS BECOME RUSTED DUE T
#35734199R
Aug 20, 2026
POP/IN-VIO
$0
Sep 11, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT CELLAR ELECTRIC METER RM C61 WITH WATER DAMAGE/PUDDERING TO WALLS/PANELS AND FLOORS RUSTING/SPALLING.REM:REPAIR AND/OR REPLACE.
#35725249L
Oct 9, 2025
POP/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 21, 2026ECBConstruction: REISSUE#35725249L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT THE TIME OF INSPECTION OBSERVED IN ELECTRIC METER ROOM WATER DAMAGE ON THE FLOOR & ON BOTTOM OF EQUIPMENT HAS BECOME RUSTED DUE TOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 5:56 PM ET. BBL 4022180021.

Look up another building