9 floors · 108,282 sq ft · built 1930 · class O6 · owner of record: 10818 Qb Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 69 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3256). Agency page | Dec 31, 2026 in 69 days | Due this year |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-07-02 (Accepted). Agency page | Dec 31, 2026 in 69 days | 2 of 2 without an accepted 2026 report yet |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $45,500 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 121 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 108,282 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 11, 2026 | Construction CLASS - 2 OBSERVED WORK IN PROGRESS SUSPENDED SCAFFOLD IN USE UPON REQUESTING FOR DOCUMENTS TO BE KEPT ON SITE. DAILY INSPECTION REPORT- LAST UPDATE WAS 08-31-2026. NO PE LETTER FOR PARAPET CLAMPS, PULLTEST FOR TIEBACKS #39559067P | Nov 17, 2026 | $1,250 |
| Oct 23, 2020 | Boilers CLASS - 2 TITUSVILLE MODEL NO-SOH 182-0 BOILER LEAKING. CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION. #39030938L | Jan 18, 2022 IN VIOLATION | $0 |
| Jul 13, 2020 | Construction CLASS - 2 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,OM AN OFFICE BUILDING 100 FEET #37019948P | Oct 27, 2020 STIPULATION/IN-VIO | $0 |
| Nov 15, 2019 | Construction CLASS - 2 AC279291-FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BUILDING 100 FEE #37016887R | Mar 10, 2020 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #16998 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #16997 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 11, 2026 | ECB | Construction: OBSERVED WORK IN PROGRESS SUSPENDED SCAFFOLD IN USE UPON REQUESTING FOR DOCUMENTS TO BE KEPT ON SITE. DAILY INSPECTION REPORT- LAST UPDATE WAS 08-31-2026. NO PE LETTER FOR PARAPET CLAMPS, PULLTEST FOR TIEBACKS | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 9:33 PM ET. BBL 4032560001.