Queens · Block 3256 · Lot 1 · 11375

108-18 Queens Boulevard

9 floors · 108,282 sq ft · built 1930 · class O6 · owner of record: 10818 Qb Llc

10open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
69dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 69 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3256). Agency page

Dec 31, 2026
in 69 days
Due this year
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-07-02 (Accepted). Agency page

Dec 31, 2026
in 69 days
2 of 2 without an accepted 2026 report yet
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $45,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 121 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 108,282 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 190 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 190 days
Annual filing

Open violations

ECB / OATH (4) · $1,250 owed
IssuedViolationHearingBalance
Sep 11, 2026Construction CLASS - 2
OBSERVED WORK IN PROGRESS SUSPENDED SCAFFOLD IN USE UPON REQUESTING FOR DOCUMENTS TO BE KEPT ON SITE. DAILY INSPECTION REPORT- LAST UPDATE WAS 08-31-2026. NO PE LETTER FOR PARAPET CLAMPS, PULLTEST FOR TIEBACKS
#39559067P
Nov 17, 2026
$1,250
Oct 23, 2020Boilers CLASS - 2
TITUSVILLE MODEL NO-SOH 182-0 BOILER LEAKING. CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION.
#39030938L
Jan 18, 2022
IN VIOLATION
$0
Jul 13, 2020Construction CLASS - 2
27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,OM AN OFFICE BUILDING 100 FEET
#37019948P
Oct 27, 2020
STIPULATION/IN-VIO
$0
Nov 15, 2019Construction CLASS - 2
AC279291-FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BUILDING 100 FEE
#37016887R
Mar 10, 2020
STIPULATION/IN-VIO
$0
DOB (2)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#16998
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#16997
DOB VIOLATION - ACTIVE
DOB NOW Safety (5)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 11, 2026ECBConstruction: OBSERVED WORK IN PROGRESS SUSPENDED SCAFFOLD IN USE UPON REQUESTING FOR DOCUMENTS TO BE KEPT ON SITE. DAILY INSPECTION REPORT- LAST UPDATE WAS 08-31-2026. NO PE LETTER FOR PARAPET CLAMPS, PULLTEST FOR TIEBACKSClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 9:33 PM ET. BBL 4032560001.

Look up another building