2 floors · 1 apartments · 2,800 sq ft · built 1920 · class K4 · owner of record: Sylhet Realty, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 43 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-11-16 (Payment Verification In Progress). Agency page | Dec 31, 2026 in 43 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 287 days | Required only if the owner doesn't live there |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #11774 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #13122 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 17, 2026 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 11, 2026 |
| Nov 17, 2026 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT | Dec 11, 2026 |
| Nov 13, 2026 | A | Apt 2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 16, 2027 |
| Nov 13, 2026 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 18, 2026 |
| Nov 13, 2026 | C | Apt 2 · § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 19, 2026 |
| Nov 13, 2026 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCES AT WINDOW LOWER AND UPPER SASHES AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 18, 2026 |
| Nov 13, 2026 | C | Apt 2 · § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 19, 2026 |
| Nov 13, 2026 | A | Apt 2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 16, 2027 |
| Nov 13, 2026 | A | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 16, 2027 |
| Nov 13, 2026 | C | Apt 2 · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 19, 2026 |
| Nov 10, 2026 | C | Apt 2 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Dec 4, 2026 |
| Nov 9, 2026 | A | Apt 2 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT WEST, THE FOYER , THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 12, 2027 |
| Nov 9, 2026 | A | Apt 2 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 12, 2027 |
| Nov 9, 2026 | C | Apt 2 · § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 15, 2026 |
| Nov 9, 2026 | C | Apt 2 · § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT HOT WATER FIXTURES THROUGHOUT THE APT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 15, 2026 |
| Nov 9, 2026 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER SASH SPRING BALANCE AT 1ST, 2ND AND 3RD WINDOWS FROM WEST AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 14, 2026 |
| Nov 9, 2026 | A | Apt 2 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM SOUTH AT WEST WALL, 1st DOOR FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 12, 2027 |
| Nov 9, 2026 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTME | Dec 3, 2026 |
| Nov 9, 2026 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1s | Dec 3, 2026 |
| Nov 9, 2026 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT A | Dec 3, 2026 |
| Nov 9, 2026 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 2, 2nd | Dec 3, 2026 |
| Nov 9, 2026 | B | Apt 2 · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 14, 2026 |
| Jan 5, 2023 | B | Apt 2 · § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES LOW WATER PRESSURE IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 9, 2023 |
| Jan 4, 2023 | B | Apt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 8, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Nov 17, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 17, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT | Open |
| Nov 13, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 13, 2026 | HPD B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 13, 2026 | HPD C | § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 13, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCES AT WINDOW LOWER AND UPPER SASHES AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 13, 2026 | HPD C | § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 13, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 13, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 13, 2026 | HPD C | § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 10, 2026 | HPD C | § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Open |
| Nov 9, 2026 | HPD A | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT WEST, THE FOYER , THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 9, 2026 | HPD A | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 9, 2026 | HPD C | § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 9, 2026 | HPD C | § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT HOT WATER FIXTURES THROUGHOUT THE APT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 9, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER SASH SPRING BALANCE AT 1ST, 2ND AND 3RD WINDOWS FROM WEST AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 9, 2026 | HPD A | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM SOUTH AT WEST WALL, 1st DOOR FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Nov 9, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTME | Open |
| Nov 9, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1s | Open |
| Nov 9, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT A | Open |
| Nov 9, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 2, 2nd | Open |
| Nov 9, 2026 | HPD B | § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 9:26 PM ET. BBL 4092980079.