5 floors · 88,736 sq ft · built 1930 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-16 (Accepted). Agency page | Dec 31, 2026 in 63 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 88,736 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 428 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 10250). Agency page | Dec 31, 2030 in 1524 days | Next due 2030 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 29, 2026 | Construction CLASS - 2 RE-ISSUE #35725480Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: IN CAFETERIA KITCHEN AREA OBSERVED AIR VENT COVERED WITH A PIECE OF PLEXIGLASS APPROX: 12" X 12". REMEDY: REPAIR AND/OR REPLACE #35731766K | Jun 18, 2026 POP/IN-VIO | $0 |
| Oct 2, 2025 | Boilers CLASS - 2 FOUND LAARS HLW WATER HEATER INSTALLED WITH WRONG VENTING NEEDS TO BE IN BREECHING, MAINTAIN BOILER; CORRECT VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION #39162263R | Oct 20, 2025 POP/IN-VIO | $0 |
| Sep 23, 2025 | Construction CLASS - 2 REISSUE #35692274P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT CAFETERIA KITCHEM EXHAUST WAS TRUNCATED INSIDE THE KITCHEN AND COVERED WITH A SHEET OF PLEXIGLASS. REMEDY: REPAIR AND/OR REPLA #35725480Y | Oct 21, 2025 POP/IN-VIO | $0 |
| Oct 23, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS- DOB VIOLATION# 110311P11311P121DG ISSUED 11/03/2011., FILE A CERTIFICATE OF CORRECTION #39128217R | Nov 20, 2024 POP/IN-VIO | $0 |
| Oct 22, 2024 | Construction CLASS - 2 REISSUE #35674786J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT CAFETERIA KITCHEN, EXHAUST TRUNCATED INSIDE THE KITCHENAND COVERED WITH SHEET OF PLEXIGLASS. REMEDY: REPAIR AND/OR REPLACE. #35692274P | Dec 3, 2024 POP/IN-VIO | $0 |
| Jun 8, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT CAFETERIA,KITCHEN EXHAUST TRUNCATED IN THE KITCHEN. REMEDY: REPAIR/REPLACE. #35674786J | Oct 3, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 3, 2011 | PLUMBING SPRINKLER SYSTEM TAKEN OFF THE DOMESTIC WATER SYSTEM WITHOUT BACKFLOW PREVENTER INSTALLED #11311P121DG | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 8:15 PM ET. BBL 4102500001.