2 floors · 8,500 sq ft · built 1925 · class M1 · owner of record: New Bklyn Reformed Ch
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 27, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED AT ROOF LOOSE/DISLODGED METAL DRIP EDGE APPROX. 12"X14' AT THE CORNER OF EXP#1 (RIGHT SIDE) IN DANGER TO FALLING., REPAIR AND/REPLACE #39205753R | Dec 2, 2026 PENDING | $2,500 |
| Nov 25, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS # 39095733P., FILE A CERTIFICATE OF CORRECTION #39168352X | Feb 4, 2026 ADMIT/IN-VIO | $0 |
| Sep 25, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED, AT TIME OF INSPECTION IT WAS OBSERVED THAT APPROX. A 4'W X 2'H SECTION OF BRICK DISLODGED FROM THE TOP OF THE BELL TOWER ONTO THE STEPS OF THE FRO #39095733P | Aug 19, 2024 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 27, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED AT ROOF LOOSE/DISLODGED METAL DRIP EDGE APPROX. 12"X14' AT THE CORNER OF EXP#1 (RIGHT SIDE) IN DANGER TO FALLING., REPAIR AND/REPLACE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 5:45 AM ET. BBL 3015600017.