2 floors · 3 apartments · 2,604 sq ft · built 1901 · class C0 · owner of record: All In One Communication Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2024-09-30 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 51 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 67 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1147 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 26, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT. OF BUILDINGS FOR VIOLATION #35719277H, FILE A CERTIFICATE OF CORRECTION #39193966P | Sep 2, 2026 DEFAULT | $6,250 |
| Jun 26, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT. OF BUILDINGS FOR VIOLATION #35688374K, FILE A CERTIFICATE OF CORRECTION #39193965N | Sep 2, 2026 DEFAULT | $6,250 |
| Jun 26, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO OBTAIN WORK PERMITS FOR VIOLATION #39167196Z PREVIOUSLY ISSUED FROM VIOLATION #35690128H 3/19/2025. NO PERMIT/APPROVED PLANS TO CREATE CLASS "A" #39193967R | Sep 2, 2026 DEFAULT | $25,000 |
| Jun 26, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT. OF BUILDINGS FOR VIOLATION #35690127X, FILE A CERTIFICATE OF CORRECTION #39193968Z | Sep 2, 2026 DEFAULT | $6,250 |
| Nov 17, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT. OF BUILDINGS FOR VIOLATION #35688374K, FILE A CERTIFICATE OF CORRECTION #39167197K | Jan 28, 2026 DEFAULT | $6,250 |
| Nov 17, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO OBTAIN WORK PERMITS FOR VIOLATION #35690128H, COMPLY WITH COMMISSIONER'S ORDER #39167196Z | Jan 28, 2026 DEFAULT | $12,500 |
| Nov 17, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT. OF BUILDINGS FOR VIOLATION #35690127X, FILE A CERTIFICATE OF CORRECTION #39167198M | Jan 28, 2026 DEFAULT | $6,250 |
| Nov 17, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT. OF BUILDINGS FOR VIOLATION #35690241J, FILE A CERTIFICATE OF CORRECTION #39167199Y | Jan 28, 2026 DEFAULT | $6,250 |
| Sep 16, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NOTED; FAILURE TO FILE A CERTIFICATE OF CORRECTION UNDER FOLLOWING SUMMONS: 35690127X, 35690 #39160600J | Nov 26, 2025 DEFAULT | $6,250 |
| Aug 21, 2025 | Construction CLASS - 1 REMOVED OF DEFACED A WRITTEN POSTED VACATE ORDER. AT TIME OF INSPECTION, NOTED VACATE ORDER SUPPLEMENTAL STICKER #OP-64-25-00730 POSTED 08-04-2025 FOR VACATE ORDER #B143/25 ISSUED 03-19-2025 HAS BEEN REMOVED FR #35719277H | Nov 5, 2025 DEFAULT | $25,000 |
| Aug 4, 2025 | Construction CLASS - 1 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. AT TIME OF INSPECTION, NOTED VACATE ORDER SUPPLIMENTAL STICKER #OP-64-25-00626 POSTED 04-07-2025 FOR VACATE ORDER #B143/25 WHICH WAS PREVIOUSLY REMOVED, HAS BEE #35691082X | Oct 8, 2025 DEFAULT | $25,000 |
| Apr 7, 2025 | Construction CLASS - 1 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. AT TIME OF INSPECTION OBSERVED ACTIVE VACATE ORDER #B143/25 ISSUED 03/19/2025 AND POSTED 03/25/2025 REMOVED FROM FRONT ENTRY DOOR. POSTED VACATE STICKER #OP-64- #35690241J | Jun 11, 2025 DEFAULT | $25,000 |
| Mar 19, 2025 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPT. OF BUILDING'S RECORDS.ILLEGAL OCCUPANCY NOTED: AT TWO FAMILY DWELLING HAS BEEN ILLEGALLY CONVERTED TO A THREE FAMILY DWELLING. NOTED: CELLAR LEVEL ILLEGALLY CONVE #35688374K | May 28, 2025 DEFAULT | $12,500 |
| Mar 19, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER: LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY ROOM PER BC 1018.1(2008); 27-366; BC 1021.1(2014 CODE); AC 1006.3(2022 CODE), FOR CLASS 'A' APARTMEN #35690127X | May 28, 2025 DEFAULT | $12,500 |
| Mar 19, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR LEVEL HAS BEEN ERECTED FULL HEIGHT PARTITIONS TO CREATE A CLASS 'A' APARTMENT W/ TWO BED ROOMS,WATER AND WASTE LINE FOR A 3 PCS. BATHROOM(TOILET, SINK AND SHOWER) AN #35690128H | May 28, 2025 DEFAULT | $12,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 3, 2024 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Nov 24, 2025 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Dec 27, 2021 | B | Apt 3RDFLO · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 25 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 31, 2022 |
| Nov 8, 2021 | B | Apt 3 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CELING APPROXIMATELY 20 SQUARE FEET. IN THE BATHROOM LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 13, 2021 |
| Jun 6, 2007 | C | Apt 1 · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY | Jun 22, 2007 |
| Jun 6, 2007 | B | Apt BSMT · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR , WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Jul 21, 2007 |
| Jun 6, 2007 | B | Apt BSMT · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR , CEILING IN THE BATHROOM LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Jul 21, 2007 |
| Jun 6, 2007 | B | Apt BSMT · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR , WEST WALL, NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Jul 21, 2007 |
| Jun 6, 2007 | A | Apt BSMT · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, CEILING LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Sep 19, 2007 |
| Jun 6, 2007 | B | Apt BSMT · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR , WEST WALL, SOUTH WALL, CEILING IN THE KITCHEN LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Jul 21, 2007 |
| Jun 6, 2007 | B | Apt BSMT · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT SINK IN THE KITCHEN LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Jul 21, 2007 |
| Jun 6, 2007 | B | Apt BSMT · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR , CEILING IN THE 2nd BATHROOM LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Jul 21, 2007 |
| Jun 6, 2007 | A | Apt BSMT · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , 1st RISER FROM WEST AT NORTH WALL, CEILING IN THE 2nd BATHROOM LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Sep 19, 2007 |
| Jun 6, 2007 | B | Apt BSMT · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR , SOUTH WALL, NORTH WALL IN THE 2nd PRIVATE HALLWAY LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Jul 21, 2007 |
| Jun 6, 2007 | B | Apt BSMT · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING . IN THE ENTIRE APARTMENT LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Jul 21, 2007 |
| Jun 6, 2007 | B | Apt BSMT · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Jul 21, 2007 |
| Jun 6, 2007 | B | Apt BSMT · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Jul 21, 2007 |
| Jun 6, 2007 | B | Apt BSMT · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). IN THE ENTIRE APARTMENT LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WEST | Jul 21, 2007 |
| Jun 6, 2007 | C | Apt BSMT · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, 3rd DOOR FRAME FROM WEST AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT | Jun 22, 2007 |
| Jun 6, 2007 | C | Apt BSMT · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd PR | Jun 22, 2007 |
| Jun 6, 2007 | C | Apt BSMT · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL LOCATED | Jun 22, 2007 |
| Jun 6, 2007 | C | Apt BSMT · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME | Jun 22, 2007 |
| Jun 6, 2007 | C | Apt BSMT · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL, 2nd WINDOW FRAME FROM NORTH AT E | Jun 22, 2007 |
| Jun 6, 2007 | C | Apt BSMT · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM NORTH AT EAST WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL, 3r | Jun 22, 2007 |
| Jun 6, 2007 | C | Apt 1 · § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES - IN THE KITCHEN LOCATED AT APT 1, 1st STORY | Jun 22, 2007 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 3:04 PM ET. BBL 3036970027.