Brooklyn · Block 937 · Lot 45 · 11217

106 5 Avenue

3 floors · 2 apartments · 2,400 sq ft · built 1930 · class S2 · owner of record: 102-106 Fifth Ave Llc

8open violations
$15,020ECB/OATH penalties owed
0HPD class C (immediately hazardous)
65dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 65 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 309 days
Required only if the owner doesn't live there
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-22 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $15,020 owed
IssuedViolationHearingBalance
Aug 7, 2026Construction CLASS - 1
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. DOB FTC VIOLATION #070226PI30602TC UNDER CONTROL #348567, DATED ON 07/02/2026, NO COMPLIANCE ONFILE FOR CORRECTIVE ACTION PLAN REQUIRED. REMEDY: COMPLY WITH THE COMM
#35718651Y
Oct 28, 2026
PENDING
$2,500
May 26, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. I OBSERVED HAZARDOUS CONDITION WITH THE WOOD CORNICE PARTLY DETACHED AT ROOF LEVEL AND FRONT EXPOSURE. MISSING COMPONENTS, LEANING FORWARD, EXPOSURE AT ROO
#35718756K
Aug 5, 2026
DEFAULT
$12,520
DOB (3)
IssuedViolationStatus
Jul 2, 2026CONSTRUCTION
FTC W/COMMISSIONER'S ORDER 370504 VIO#052626PI30603HZ DATED 5/26/26 REQUIRING OWNER TO PROVIDE CORRECTIVE ACTION PLAN BY 6/26/26. AS OF 7/2/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER 370504 VIO#052626PI30603HZ
#PI30602TC
DOB VIOLATION - ACTIVE
May 26, 2026CONSTRUCTION
CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1/4 CORNER ON 2FL CRACKED AND DISLODGED BRICKS AROUND WINDOW SILL & HEADER,ALSO DETACHING OF METAL SHEADING BEHIND METAL ROLL UP GATE @ 1/2 CORNER, CRACKED WINDOW SILL ON 3FL 1/4 CORNER. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL
#PI30603HZ
DOB VIOLATION - ACTIVE
Jun 28, 2022CONSTRUCTION
VIO22-50102
#E306KS
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (3) · C 0 · B 2 · A 1
IssuedClassViolationCorrect by
Apr 4, 2017BApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT EASTMay 9, 2017
Apr 4, 2017BApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT EASTMay 9, 2017
Mar 1, 2017AApt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE BELL AND BUZZER RETURN INTERCOM FROM VESTIBULE 1 STORY TO SYSTEM LOCATED AT APT 2, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHJun 4, 2017

Issued in the last 120 days

DateSourceWhatNow
Aug 7, 2026ECBConstruction: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. DOB FTC VIOLATION #070226PI30602TC UNDER CONTROL #348567, DATED ON 07/02/2026, NO COMPLIANCE ONFILE FOR CORRECTIVE ACTION PLAN REQUIRED. REMEDY: COMPLY WITH THE COMMOpen
Jul 2, 2026DOBCONSTRUCTION: FTC W/COMMISSIONER'S ORDER 370504 VIO#052626PI30603HZ DATED 5/26/26 REQUIRING OWNER TO PROVIDE CORRECTIVE ACTION PLAN BY 6/26/26. AS OF 7/2/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER 370504 VIO#052626PI30603HZOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 8:53 AM ET. BBL 3009370045.

Look up another building