3 floors · 2 apartments · 2,400 sq ft · built 1930 · class S2 · owner of record: 102-106 Fifth Ave Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 65 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 309 days | Required only if the owner doesn't live there |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-22 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 7, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. DOB FTC VIOLATION #070226PI30602TC UNDER CONTROL #348567, DATED ON 07/02/2026, NO COMPLIANCE ONFILE FOR CORRECTIVE ACTION PLAN REQUIRED. REMEDY: COMPLY WITH THE COMM #35718651Y | Oct 28, 2026 PENDING | $2,500 |
| May 26, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. I OBSERVED HAZARDOUS CONDITION WITH THE WOOD CORNICE PARTLY DETACHED AT ROOF LEVEL AND FRONT EXPOSURE. MISSING COMPONENTS, LEANING FORWARD, EXPOSURE AT ROO #35718756K | Aug 5, 2026 DEFAULT | $12,520 |
| Issued | Violation | Status |
|---|---|---|
| Jul 2, 2026 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER 370504 VIO#052626PI30603HZ DATED 5/26/26 REQUIRING OWNER TO PROVIDE CORRECTIVE ACTION PLAN BY 6/26/26. AS OF 7/2/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER 370504 VIO#052626PI30603HZ #PI30602TC | DOB VIOLATION - ACTIVE |
| May 26, 2026 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1/4 CORNER ON 2FL CRACKED AND DISLODGED BRICKS AROUND WINDOW SILL & HEADER,ALSO DETACHING OF METAL SHEADING BEHIND METAL ROLL UP GATE @ 1/2 CORNER, CRACKED WINDOW SILL ON 3FL 1/4 CORNER. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL #PI30603HZ | DOB VIOLATION - ACTIVE |
| Jun 28, 2022 | CONSTRUCTION VIO22-50102 #E306KS | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 4, 2017 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT EAST | May 9, 2017 |
| Apr 4, 2017 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT EAST | May 9, 2017 |
| Mar 1, 2017 | A | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE BELL AND BUZZER RETURN INTERCOM FROM VESTIBULE 1 STORY TO SYSTEM LOCATED AT APT 2, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 4, 2017 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 7, 2026 | ECB | Construction: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. DOB FTC VIOLATION #070226PI30602TC UNDER CONTROL #348567, DATED ON 07/02/2026, NO COMPLIANCE ONFILE FOR CORRECTIVE ACTION PLAN REQUIRED. REMEDY: COMPLY WITH THE COMM | Open |
| Jul 2, 2026 | DOB | CONSTRUCTION: FTC W/COMMISSIONER'S ORDER 370504 VIO#052626PI30603HZ DATED 5/26/26 REQUIRING OWNER TO PROVIDE CORRECTIVE ACTION PLAN BY 6/26/26. AS OF 7/2/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER 370504 VIO#052626PI30603HZ | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 8:53 AM ET. BBL 3009370045.