3 floors · 160,854 sq ft · built 1958 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 57 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 160,854 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 178 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 178 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2717). Agency page | Dec 31, 2027 in 422 days | Next due 2027 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1153 days | Next cycle year 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-28 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 24, 2026 | Construction CLASS - 2 REISSUE#35725167H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED ON 1ST FLOOR AT EXIT 1 & EXIT 4 DISCHARGE DOORS AND DOOR FRAMES ARE CORRODED AND RUSTED.REM:REPAIR AND/OR REPLACE. #35734395Y | Aug 21, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 REISSUE#35725170Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED ON FIRST FLOOR RM#113,THERE IS WINDOW THAT DOES NOT STAY OPEN AND SLAMS SHUT WHEN OPENED.REM:REPAIR AND/OR REPLACE. #35734394M | Aug 21, 2026 POP/IN-VIO | $0 |
| Sep 17, 2025 | Construction CLASS - 2 RE-ISSUE 35692535Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, ROOM #113 ON 1ST FLOOR HAS A WINDOW THAT IS SLAMMING SHUT. REMEDY: REPAIR AND/OR REPLACE. #35725170Z | Oct 31, 2025 POP/IN-VIO | $0 |
| Sep 17, 2025 | Construction CLASS - 2 RE-ISSUE 35692538J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, EXIT '1" AND "4" DISCHARGE DOORS AND FRAMES ARE CORRODED. EXIT DISCHARGE DOOR "U" SADDLE IS BUILDING/TRIPPIN #35725167H | Oct 31, 2025 POP/IN-VIO | $0 |
| Nov 7, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT 1 FLOOREXIT DOORS EXTERIOR & INTERIOR DOOR FRAMES AT BASE CORROSION AM RUST AND SADDLES AT EXIT 1 AND 4 ARE BULGING CAUSING TRIP HAZARDS.REM:REPAIR #35692538J | Jan 31, 2025 POP/IN-VIO | $0 |
| Nov 7, 2024 | Construction CLASS - 2 REISSUE#35663571Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT 1 FLOOR ROOM 113 DEFECTIVE WINDOW.REM:REPAIR AND/OR REPLACEWINDOW. #35692535Y | Jan 31, 2025 POP/IN-VIO | $0 |
| Jul 12, 2023 | Construction CLASS - 2 REISSUE #35665389L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT FIRST FLOOR, ROOM #113, ONE WINDOW DO NOT OPERATE PROPERLY. DO NOT OPEN AND SLAM SHUT. REMEDY: REPAIR/REPLACE WINDOW #35663571Z | Sep 22, 2023 POP/IN-VIO | $0 |
| Jul 6, 2022 | Construction CLASS - 2 REISSUE#35577412K DATE OF ISSUE:7.19.21 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION I OBSERVED&NOTED ATON 1ST FL RM#113 HAS A WINDOW THAT DOES NOT STAY OPEN&ONLY SLAMS SHUT #35665389L | Nov 18, 2022 POP/IN-VIO | $0 |
| Jul 19, 2021 | Construction CLASS - 2 REISSUE#35498109M FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: DURING INSPECTION OBSERVED ON 1ST FL-RM#113 HAS A WINDOW THAT DOES NOT STAY OPEN & ONLY SLAMS SHOT WHEN OPENED. REMEDY: REPAIR &/OR RE #35577412K | Oct 29, 2021 POP/IN-VIO | $0 |
| Jun 4, 2020 | Construction CLASS - 2 REISSUE#35442746M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER NOTED ROOM 113 PREK WINDOW SLAMS SHUT WHEN OPENED COMPLY WITH CODE #35498109M | Sep 4, 2020 POP/IN-VIO | $0 |
| Aug 9, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER NOTED: A(1ST FL)RM 113 WINDOW SLAMS SHUT WHEN TESTED RE-ISSUE #35335201Z. REM: REPAIR AND/OR REPLACE. #35442746M | Nov 1, 2019 POP/IN-VIO | $0 |
| May 25, 2018 | Construction CLASS - 2 NOTED: AT ROOM 113 (PRE-K) WINDOW SLAMS SHUT WHEN TESTED. RMDY: COMPLY WITH CODE. #35335201Z | Sep 7, 2018 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05997 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05998 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 24, 2026 | ECB | Construction: REISSUE#35725167H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED ON 1ST FLOOR AT EXIT 1 & EXIT 4 DISCHARGE DOORS AND DOOR FRAMES ARE CORRODED AND RUSTED.REM:REPAIR AND/OR REPLACE. | Open |
| Jul 24, 2026 | ECB | Construction: REISSUE#35725170Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED ON FIRST FLOOR RM#113,THERE IS WINDOW THAT DOES NOT STAY OPEN AND SLAMS SHUT WHEN OPENED.REM:REPAIR AND/OR REPLACE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 4, 2026, 12:16 AM ET. BBL 2027170005.