1 floors · 1,170 sq ft · built 1931 · class K1 · owner of record: Elizabeth A Luna
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 21, 2026 | Unknown CLASS - 1 OBSERVED UNPERMITTED NEW ELECTRICAL WORK THROUGHOUT THE COMMERCIAL PLACE. INSTALLED JUNCTION BOXES, NEW LIGHT FIXTURES. NO ELECTRICAL PERMIT FOR THIS SCOPE OF WORK AT THE TIME OF INSPECTION., OBTAIN PERMIT #39204903Z | Dec 2, 2026 PENDING | $2,500 |
| Sep 21, 2026 | Construction CLASS - 1 OBSERVED UNPERMITTED NEW PLUMBING WORK AT PREP AREA. INSTALLED NEW CUT OFF VALVES ALONG WITH NEW COPPER PIPING. NEW DRAINAGE PIPE INSTALLED. NO PLUMBING PERMIT FOR THIS SCOPE OF WORK AT THE TIME OF INSPECTION., #39204902R | Dec 2, 2026 PENDING | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 21, 2026 | ECB | Unknown: OBSERVED UNPERMITTED NEW ELECTRICAL WORK THROUGHOUT THE COMMERCIAL PLACE. INSTALLED JUNCTION BOXES, NEW LIGHT FIXTURES. NO ELECTRICAL PERMIT FOR THIS SCOPE OF WORK AT THE TIME OF INSPECTION., OBTAIN PERMIT | Open |
| Sep 21, 2026 | ECB | Construction: OBSERVED UNPERMITTED NEW PLUMBING WORK AT PREP AREA. INSTALLED NEW CUT OFF VALVES ALONG WITH NEW COPPER PIPING. NEW DRAINAGE PIPE INSTALLED. NO PLUMBING PERMIT FOR THIS SCOPE OF WORK AT THE TIME OF INSPECTION., | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 5:42 PM ET. BBL 3031550026.