Brooklyn · Block 3155 · Lot 26 · 11237

1050 Flushing Avenue

1 floors · 1,170 sq ft · built 1931 · class K1 · owner of record: Elizabeth A Luna

3open violations
$5,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
68dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 68 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)

Open violations

ECB / OATH (2) · $5,000 owed
IssuedViolationHearingBalance
Sep 21, 2026Unknown CLASS - 1
OBSERVED UNPERMITTED NEW ELECTRICAL WORK THROUGHOUT THE COMMERCIAL PLACE. INSTALLED JUNCTION BOXES, NEW LIGHT FIXTURES. NO ELECTRICAL PERMIT FOR THIS SCOPE OF WORK AT THE TIME OF INSPECTION., OBTAIN PERMIT
#39204903Z
Dec 2, 2026
PENDING
$2,500
Sep 21, 2026Construction CLASS - 1
OBSERVED UNPERMITTED NEW PLUMBING WORK AT PREP AREA. INSTALLED NEW CUT OFF VALVES ALONG WITH NEW COPPER PIPING. NEW DRAINAGE PIPE INSTALLED. NO PLUMBING PERMIT FOR THIS SCOPE OF WORK AT THE TIME OF INSPECTION.,
#39204902R
Dec 2, 2026
PENDING
$2,500
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 4)
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 21, 2026ECBUnknown: OBSERVED UNPERMITTED NEW ELECTRICAL WORK THROUGHOUT THE COMMERCIAL PLACE. INSTALLED JUNCTION BOXES, NEW LIGHT FIXTURES. NO ELECTRICAL PERMIT FOR THIS SCOPE OF WORK AT THE TIME OF INSPECTION., OBTAIN PERMITOpen
Sep 21, 2026ECBConstruction: OBSERVED UNPERMITTED NEW PLUMBING WORK AT PREP AREA. INSTALLED NEW CUT OFF VALVES ALONG WITH NEW COPPER PIPING. NEW DRAINAGE PIPE INSTALLED. NO PLUMBING PERMIT FOR THIS SCOPE OF WORK AT THE TIME OF INSPECTION.,Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 5:42 PM ET. BBL 3031550026.

Look up another building