3 floors · 4 apartments · 5,938 sq ft · built 2024 · class C3 · owner of record: 105 Diamond Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 24, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN/INSTITUTE SAFETY EQUIPMENT MEASURE/TEMPORARY CONSTRUCTION NO HANDRAIL.AS NOTED:AT TIME OF INSPECTION OF AN ACTIVE SITE FOR A PROPOSED 3 STORY BUILDING ALREADY AT THE BULKHEAD/ROOFTOP LEVEL,O #35729955R | Oct 7, 2026 IN VIOLATION | $2,500 |
| Dec 29, 2025 | Site Safety CLASS - 1 4-STORY NB. MISSING REQUIRED DOCS TO BE KEPT ON SITE. CRACKS NOTED ON ADJACENT PROPERTY AT EXPO2 (103 DIAMOND ST) UPON REQUEST NO PRE-CONSTRUCTION SURVEY OR MONITORING REPORTS PROVIDED. CONSTRUCTION FENCE DRAWI #39548546Z | May 20, 2027 DEFAULT | $6,250 |
| Dec 29, 2025 | Unknown CLASS - 2 ACTIVE JOBSITE 4-STORY NB. OBSERVED INADEQUATE WINDOW PROTECTION FOR ADJACENT PROPERTY AT EXPO 2 IN REAR OF SITE. WINDOWS NOT BEING PROTECTED AS PER CODE AND AS PER SSP. SSP PROVIDED SHOWS NETTING REQUIRED FOR #39548547K | May 20, 2027 DEFAULT | $6,250 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 24, 2026 | ECB | Construction: FAILURE TO MAINTAIN/INSTITUTE SAFETY EQUIPMENT MEASURE/TEMPORARY CONSTRUCTION NO HANDRAIL.AS NOTED:AT TIME OF INSPECTION OF AN ACTIVE SITE FOR A PROPOSED 3 STORY BUILDING ALREADY AT THE BULKHEAD/ROOFTOP LEVEL,O | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 3:23 AM ET. BBL 3026510017.