5 floors · 65,742 sq ft · built 1907 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-09-26 (Accepted). Agency page | Dec 31, 2026 in 61 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 65,742 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1389). Agency page | Dec 31, 2029 in 1157 days | Next due 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 23, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, THERE WAS A BROKEN EXTERIOR WINDOW IN STAIRCASE "F" BETWEEN 2ND AND 1ST FLOOR, IN EXIT #2 VESTIBULE THERE WAS SPALLING AND EFFLO #35727578L | Apr 17, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). AT THE TIME OF INSPECTION THE FOLLOWING ROOM DOORS HAD TURN KNOB HANDLES"-308D, 112, 113 #35727576H | Apr 17, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, THE FOLLOWING DOORS WERE NOT SELF-CLOSING:-313, 308D, 304(FRAME WAS SPLIT/DAMAGED) 112, 113, 103, 101, STAIRCASE "D" ON 3RD FLOO #35727575X | Apr 17, 2026 POP/IN-VIO | $0 |
| Mar 23, 2026 | Construction CLASS - 2 RE-ISSUED 35691726M. AT THE TIME OF INSPECTION, THE FOLLOWING EMERGENCY LIGHTS WERE INOPERABL:-2 LIGHTS IN LIBRARY, 1-I, C-1, C-2, C-3, C-4,C-5, 3-1. REMEDY: REPAIR/REPLACE LIGHTING. #35727577J | Apr 17, 2026 POP/IN-VIO | $0 |
| Apr 2, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:IN THE CAFETERIA TWO LIGHTS WERE NOT OPERATIONAL WHEN TESTED.REM:REPAI #35691726M | Jul 9, 2025 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 16, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. CRACKED WINDOW PANES ON EXPOSURE #1 SOUTH ELEVATION AND EXPOSURE #4 N.E. CORNER AND AT EXPOSURE #3 NORTH ELEVATION, AT 4TH FLOOR N.E. CORNER AND AT 2ND FLOOR NEAR "EXIT 6" OF BUILDING. REMEDY: REPAIR AND/OR REPLACE #SR30809NS | DOB VIOLATION - ACTIVE |
| Sep 16, 2026 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO: CRACKED/SPALLING STONES AT EXPOSURE #3 NORTH ELEVATION @ 4FL N.E. CORNER AND AT 2FL NEAR "EXIT 6" OF BUILDING REMEDY: IMMEDIATELY INSTALL SIDEWALK SHEDS @ EXPOSURE #3 NORTH ELEVATION AT N.W. CORNER AND AT EXIT 6 DOORWAY UNDER DIRECTION OF A LICENSED PROFESSIONAL #SR30810NS | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #09550 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #09551 | DOB VIOLATION - ACTIVE |
| Jun 23, 2024 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) #00619 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 23, 2024 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 16, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. CRACKED WINDOW PANES ON EXPOSURE #1 SOUTH ELEVATION AND EXPOSURE #4 N.E. CORNER AND AT EXPOSURE #3 NORTH ELEVATION, AT 4TH FLOOR N.E. CORNER AND AT 2ND FLOOR NEAR "EXIT 6" OF BUILDING. REMEDY: REPAIR AND/OR REPLACE | Open |
| Sep 16, 2026 | DOB | CONSTRUCTION: EMERGENCY WORK ORDER DUE TO: CRACKED/SPALLING STONES AT EXPOSURE #3 NORTH ELEVATION @ 4FL N.E. CORNER AND AT 2FL NEAR "EXIT 6" OF BUILDING REMEDY: IMMEDIATELY INSTALL SIDEWALK SHEDS @ EXPOSURE #3 NORTH ELEVATION AT N.W. CORNER AND AT EXIT 6 DOORWAY UNDER DIRECTION OF A LICENSED PROFESSIONAL | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 9:56 AM ET. BBL 3013890035.