5 floors · 18 apartments · 11,130 sq ft · built 1889 · class C7 · owner of record: Sonora Associates,Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2024-09-30 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-08-29 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 10, 2026 | Construction CLASS - 1 FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39074831X FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER ISSUED ON 12/01/2022, REPAIR AND/REPLACE #39179921K | Mar 29, 2027 DEFAULT | $6,280 |
| Mar 10, 2026 | Construction CLASS - 1 FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39119916L FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER ISSUED ON 07/26/2024, REPAIR AND/REPLACE #39179920Z | Mar 29, 2027 DEFAULT | $6,280 |
| Mar 10, 2026 | Construction CLASS - 1 FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 37025690H FOR UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. ISSUED ON 10/11/2023, COMPLY WITH COMMISSIONER'S ORDER #39179919L | Mar 29, 2027 DEFAULT | $6,280 |
| Dec 31, 2025 | Construction CLASS - 1 AT TIME INSPECTION OBSERVED FACADE ON EXPOSURE # 1 IS IN DISREPAIR, MANY CRACKS ALSO FAILURE TO SUBMIT N1 ENGINEERING REPORT., COMPLY WITH COMMISSIONER'S ORDER #39172110P | Mar 16, 2027 DEFAULT | $25,000 |
| Jul 26, 2024 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED ENTIRE BUILDING STRUCTURE LEANING RIGHT TO LEFT, UNPLUMBED AND UNEVEN VERTICAL GAP ON EXPOSURE # 04 UP TOWARD. ALSO OBSERVED CRACKS, DISREPAIR AND SPALLING ON EXTERIOR THROUGHOUT. #39119916L | Oct 3, 2024 DEFAULT | $6,250 |
| Oct 11, 2023 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION 041823LL0702GM, DATED 4/18/2023. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF 10/11 #37025690H | Jun 12, 2025 IN VIOLATION | $2,500 |
| Aug 11, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTE: AT THE TIME OF INSPECTION OBSERVED (1) AT EXPOSURE #1 NORTH ELEVATION CRACK/SPALLING STUCCO CRACKED WINDOW SILLS. SPALLING MASONRY AT SEVERAL LOCATIO #35674438N | Oct 19, 2023 DEFAULT | $3,125 |
| Jul 6, 2023 | Construction CLASS - 1 UNLAWFUL ACTS.FAILURE TO COMPLY WITH COMMISSIONER'S ORDER.NOTE:RESPONDENT FAILURE TO COMPLY WITH PREVIOUS ISSUED ECB#35670144J DATED 04/18/2023 AND DOB#041823LL0701GM DATED 04/18/2023 WHICH REQUIRES RESPONDENT #35674366N | Sep 14, 2023 DEFAULT | $6,250 |
| Apr 18, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTE:AS OF TODAY 4/18/23 TIME OF INSPECTION OBSERVED AT EXP #1(NORTH EL)CRACKED/SPALLING STUCCO,CRACKED WINDOW SILLS,CRACK BUILDING CORNER.AT EXP #2(EAST EL #35670144J | Jun 22, 2023 DEFAULT | $6,250 |
| Dec 1, 2022 | Construction CLASS - 1 PREMISES SEMI-ATTACHED MASONRY BUILDING. BUILDING SETTLED APPROX. 10" ON TOP WHERE AS BOTTOM 0" GAP, UNPLUMBED & LEANING TOWARD EAST. INTERIOR STRUCTURAL WALL HAS SIGN OF VARIOUS CRACKS, PATCH & DISREPAIR CONDI #39074831X | Feb 9, 2023 DEFAULT | $6,250 |
| Sep 22, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER- FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS 35635787J ISSUED ON 01/12/2022 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-2 #39070620H | Nov 10, 2022 DEFAULT | $5,000 |
| Jan 12, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCE. NOTE AT FRONT FACADE EXP#1 CRACKS & PEELING PAINT THROUGHOUT SOME SPIDER CRACKS IN STUCCO & WINDOW MOULDING. REMEDY: MAINTAIN BLDG EXTERIOR WALLS. #35635787J | Apr 14, 2022 DEFAULT | $6,250 |
| Dec 1, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER I OBSERVED ATOI@5STYBFRONT FACADE EXP1 IN DISREPAIR,CRACKS SPALLING LIMESTONE&BROWNSTONE.INFRONT 2FL LEVEL LEFT SIDE CRACKS IN PLASTER.IN FRONT FACADE CRACKS IN #35635773Z | Mar 3, 2022 DEFAULT | $12,500 |
| Oct 13, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.I OBSERVED AT THE TIME OF INSPECTION AT FIVE STORY BUILDING IN FRONT FACADE EXP-1 DISREPAIR.CRACKS SPALLING LIME STONE AND BROWN STONE.WINDOW DECRATIVES ALS #35592093H | Jan 13, 2022 DEFAULT | $12,500 |
| Aug 19, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT TIME OF INSPECTION OF FIVE STORY MD WITH CRACKS SPALLING LIMESTONE AND BROWNSTONE ALSO WINDOW DECORATIVE ABOVE AND BELOW WINDOWS NEED MODERIZATION #35581406X | Nov 4, 2021 DEFAULT | $12,500 |
| Jan 14, 2015 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. DEFECT NOTED: AT FRONT FACADE EXP1 BUILDING APPEARS TO LEANING TOWARDS EAST SIDE BLDG SHOWS SEPARATION GAPS APPRX 6" TO 10" AT TOP OF BUILDING'S HISTORY OF NON #35153537P | Jul 9, 2015 IN VIOLATION | $0 |
| Mar 9, 2014 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG. NOTED: BLDG IS OUT OF PLUMB APPROX 10" & LEANS EASTWARD. NO OBSERVED CRACKS IN LINTELS AT EXPOSURE #1 OR CRACKS BETWEEN WALLS & CEILING AT UPPER FLOOR. SAME CONDITION CITED IN PRIOR #35085814M | May 28, 2014 WRITTEN OFF | $0 |
| Jan 21, 2014 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED: AT FRONT FACADE EXPOSURE 1,BUILDING APPEARS TO BE LEANING TOWARDS THE LEFT OR EAST SIDE,BUILDING SHOWS A SEPARATION GAP THAT IT IS WIDER AS IT GETS #35081362M | Mar 13, 2014 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00013 | DOB VIOLATION - ACTIVE |
| Jul 5, 2023 | CONSTRUCTION ADDITIONAL INFO.EXP4 HAD A GAP TOWARDS THE ROOF ADJACENT TO NEIGHBOR BLDG.BLDG APPEARD TO BE LEANING TOWARDS EXP2.ON THE INTERIOR,DIAGONAL CRACKS WERE OBSERVD ALONG THE WALLS NEXT TO THE COMMON STAIR.FAIL TO COMPLY W/COMMISH ORDR#341370(060723FEU10701ZT)RQRING OWNR INSTLL MONITOR DEVICE.IMMED COMPLY #FEU10703ZT | DOB VIOLATION - ACTIVE |
| Jun 7, 2023 | CONSTRUCTION FTM.1.THE FACADE ON EXP1 HAD SEVERELY DETERIORATED.SOME BROWNSTONE FACADE APPEARD TO BE LOOSE.THE WNDW LINTEL&SILL HAD CRACKED WNDOW FRAMES HAD NOT DTERIORATD,2.BLDG HAD VISIBLE LEAN TOWARDS EXP2.OWNR TO IMMED HIRE A NYS PE TO EVAL ENT BLDG,DET STRCTURAL STBILITY,&PREPARE/ FILE RPAIR DRWNGS.BLDG TO #FEU10702ZT | DOB VIOLATION - ACTIVE |
| Jun 7, 2023 | CONSTRUCTION ADDITIONAL INFO.EXP4 HAD A GAP TOWARDS THE ROOF ADJACENT TO NEIGHBOR BLDG.BLDG APPEARED TO BE LEANING TOWARDS EXP2.ON THE INTERIOR,DIAGONAL CRACKS WERE OBSERVED ALONG THE WALLS NEXT TO THE COMMON STAIR.OWNR TO IMMED HIRE MONITORING COMPANY TO INSTALL OPTICAL MONITOR DEVICE,&CRACK MONITOR DEVICE FOR #FEU10701ZT | DOB VIOLATION - ACTIVE |
| Apr 18, 2023 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE.AT EXPOSURE#1(NORTH EL) OBSERVED CRACKED/SPALLING/CRACK STUCCO IN SEVERAL LOCATION .ALSO OBSERVED DAMAGED WINDOW SILLS IN MULTIPLE LOCATIONS.REMEDY:IMMEDIATELY PROVIDE SAFETY MEASURES AT EX#1(NORTH EL)TO SECURE/PROTECT THE PUBLIC AND REPAIR THE DEFECTIVE #LL0701GM | DOB VIOLATION - ACTIVE |
| Apr 18, 2023 | CONSTRUCTION FAILURE TO MAINTAIN BLDG-THE BUILDING STRUCTURE IS LEANINGOUT OF PLUMB TOWARDS EXP2.GAP SEPARATION OBSERVED BETWEEN 104 W 83 ST& NEIGHBORING BLDG@ EXP4 WHICH INCREASES VERTICALLY TO ROOF BOTH STRCT.IMMED RETAIN NYSPE-INSPECT ENTIRE STRUCTURAL STABILITY.PE TO PROVD DELTD RPT NLT 5/3/23 TO FORENSICENG #LL0702GM | DOB VIOLATION - ACTIVE |
| Dec 1, 2022 | CONSTRUCTION PREMISES 5-STORY SEMI-ATTACHED MASONRY BUILDING. BUILDING SETTLED APPROXIMATELY 10" ON TOP WHERE AS BOTTOM 0" GAP, UNPLUMBED & LEANING TOWARD EAST. INTERIOR STRUCTURAL WALL HAS SIGN OF VARIOUS CRACKS, PATCH & DISREPAIR CONDITIONS BY THE STAIRCASE WALL. ALSO EXTERIOR DISREPAIR CONDITIONS ON FRONT FAC #22-04286 | DOB VIOLATION - ACTIVE |
| Mar 2, 2022 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00075 | DOB VIOLATION - ACTIVE |
| Jan 5, 2022 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00047 | DOB VIOLATION - ACTIVE |
| Nov 10, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00059 | DOB VIOLATION - ACTIVE |
| Sep 14, 2015 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO HIRE A PROFESSIONAL SUR VEY TEAM TO PERFORM REGULAR MONITORING OF BUILDING. PLAN OF ACTION TO BE SUBMITTED TO ERIC HOYT FOR REVIEW BY 3/3/15 AND FIRST REPORT TO BE SUBMITTED BY 3/13/15. NOTHING HAS BEEN RECEIVED #FEU10701DEH | DOB VIOLATION - ACTIVE |
| Jan 15, 2015 | CONSTRUCTION FAILURE TO MAINTAIN,5STORY O.L.T. BUILT 1900 BLDG DEFLECTS EAST.OWNER TO HIRE PROFRESSIONAL SURVEY TEAM TO PERFORM REQULAR MONITORING OF BLDG DEFLECTION PROPOSED MONITORING MEANS METHOD &SCHEDULE TO BE SUBMITTED TO ERIC, FIRST REPORT TO BE SUBMITTED BY 03/13/15 #FEU10701DEH | DOB VIOLATION - ACTIVE |
| Aug 18, 1997 | CONSTRUCTION #07A04 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Oct 2, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 2, 2022 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 5, 2022 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 10, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 31, 2024 | I | §27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WIL | — |
| Nov 17, 2025 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Nov 22, 2024 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Apr 29, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 2, 2026 |
| Jun 4, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 7, 2025 |
| Nov 8, 2024 | C | Apt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 4, 2024 |
| Nov 8, 2024 | C | Apt 5B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 4, 2024 |
| Nov 8, 2024 | B | Apt 4B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AROUND THE REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 13, 2024 |
| Nov 8, 2024 | C | Apt 5B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 4, 2024 |
| Aug 12, 2024 | C | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRIC WIRES AT THE ELECTRIC METER BOXES AT BASEMENT | Aug 18, 2024 |
| Jul 31, 2024 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ERODED MORTAR JOINTS FROM THE 3RD STORY TO THE BASEMENT AT THE REAR EXTERIOR WALL OF THE BUILDING | Aug 6, 2024 |
| Jul 31, 2024 | B | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING AT THE REAR YARD | Sep 4, 2024 |
| Feb 16, 2024 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SPALLING AT BUILDING FRONT FROM 1ST STORY TO 5TH STORY | Feb 22, 2024 |
| Jan 23, 2024 | C | Apt 5B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 18, 2024 |
| Jan 23, 2024 | C | Apt 5B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 18, 2024 |
| Aug 8, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLAKING STUCCO AT EXTERIOR WALLS AT BUILDING FRONT AT , 2nd STORY | Sep 12, 2023 |
| Aug 8, 2023 | C | § 27-2005 ADM CODE MAKE SAFE BY PROPERLY REPAIRING THE STRUCTURAL DEFECT BUILDING LEANING TO EAST SIDE | Aug 14, 2023 |
| Aug 8, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLAKING STUCCO AT EXTERIOR WALLS AT BUILDING FRONT AT , 3rd STORY | Sep 12, 2023 |
| Aug 8, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CORNICE AT ROOF AT BUILDING FRONT | Sep 12, 2023 |
| May 8, 2023 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SPALLING AT BUILDING FRONT FROM 1ST STORY TO 5TH STORY | May 14, 2023 |
| May 8, 2023 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CORNICE AT ROOF AT BUILDING FRONT | Jun 12, 2023 |
| Dec 5, 2022 | C | § 27-2005 ADM CODE MAKE SAFE BY PROPERLY REPAIRING THE STRUCTURAL DEFECT BUILDING LEANING TO EAST SIDE | Dec 11, 2022 |
| Sep 23, 2022 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLAKING STUCCO AT 2ND AND 3RD STORIES AT EXTERIOR WALLS AT FRONT OF BUILDING | Oct 28, 2022 |
| Oct 6, 2021 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE STUCCO AT ALL STORIES AT BUILDING FRONT | Nov 10, 2021 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 4:32 AM ET. BBL 1012130037.