4 floors · 157,115 sq ft · built 2000 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 157,115 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3535). Agency page | Dec 31, 2035 in 3357 days | Next due 2035 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-17 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 27, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED FOR DIFECTIVE HARDWARE FPSC DOORS ARE NOTSELF CLOSING PROPERLY.AT 3RD FL 2 CORRIDOR EXIT DOOR 1ST FL EXIT-1 MAN #35732031Y | Jul 15, 2026 POP/IN-VIO | $0 |
| May 27, 2026 | Construction CLASS - 2 REISSUE:35691944K DATE OF ISSUE:04.30.2025 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AND NOTED AT BULKHEAD STAIR A AND STAIR B THE CEILING HAS EXCESSIVE SPALLING D #35732032X | Jul 15, 2026 POP/IN-VIO | $0 |
| May 27, 2026 | Construction CLASS - 2 REISSUE#35691945M DATE OF ISSUE:04.30.2025 EXIT DOOR NOT SELF-CLOSING PROPERLY AT THE TIME OF INSPECTION AT 1ST FLOOR EXIT-2,6,9,10 AND ONE MAIN ENTRANCE DOOR AT OUTSIDE EXIT DOOR ONE EXIT DOOR MAIN ENT AND EXI #35732030M | Jul 15, 2026 POP/IN-VIO | $0 |
| Apr 30, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: EXIT 6 THE DOOR ON THE LEFT, EXIT 2BOTH DOORS, THE CORRIDOR DOORS NEXT TO EXIT 9 AND STAIR A ONE DOOR. ALL THESE DOORS WERE NOT CLOSING PROPERLY. REMEDY: REPAIR/REPLACE DOOR. #35691945M | Jun 2, 2025 POP/IN-VIO | $0 |
| Apr 30, 2025 | Construction CLASS - 2 RE-ISSUE #35671911X. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NOTED: OBSERVED AT BULKHEAD STAIR A AND B THE CEILING HAS EXCESSIVE SPALLING DAMAGED DIE TO WATER PENETRATION, ALSO AT SECOND FLOOR LE #35691944K | Jun 2, 2025 POP/IN-VIO | $0 |
| May 21, 2024 | Construction CLASS - 2 REISSUE #35671911X. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF MY INSPECTION I OBSERVED AT THE 2ND FLOOR STAIRWELL G,ALL HAVE EXCESSIVE SPALLING AND PAINT IN VARIOUS AREAS THROUGHOUT CEIL #35682763R | Aug 21, 2024 POP/IN-VIO | $0 |
| Apr 5, 2023 | Construction CLASS - 2 REISSUE #35650985X NOTED:AT BULKHEAD STAIR A & B & AT 2ND FL STAIRWELL C, ALL HAVE EXCESSIVE SPALLING PLASTER & PAINT IN VARIOUS AREAS THROUGHOUT CEILING.REMEDY:REPAIR AND/OR REPLACE #35671911X | Jun 21, 2023 POP/IN-VIO | $0 |
| Apr 26, 2022 | Construction CLASS - 2 RE-ISSUED #35561012P FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER NOTED:AT ROOF LEVEL BULKHEAD STAIR "A" & "B" AT 2ND FLOOR LEVEL STAIR "C" CEILING DAMAGED/SPALLING PLASTER & PAINT DUCT WATER PENETRATI #35650985X | Oct 12, 2022 POP/IN-VIO | $0 |
| Apr 27, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER NOTED:@(ROOF)BULKHEADSTAIRB&(2FL)STAIRC WATER PENETRATION/DAMAGE W/SPALLING PLASTER&PAINT.REPAIR &/OR REPLACE. #35561012P | Sep 29, 2021 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 16) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 5:48 PM ET. BBL 3035350016.