4 floors · 9 apartments · 7,964 sq ft · built 1914 · class C7 · owner of record: Francine Realty Kings, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-21 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 30, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED A APARTMENT 2 ON 2ND FLOOR, 2 BEDROOMS, BATH, LIVING ROOMS AT CEILINGS & WALLS VERTICAL CRACKS & BULGING PLASTER, HALLWAY FL #39206197J | Dec 9, 2026 PENDING | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Jul 22, 2026 | LANDMARK #27-0032 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #34976 | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 5, 2023 | C | Apt 5 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 1, 2023 |
| May 28, 2019 | C | Apt 5 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 18, 2019 |
| May 28, 2019 | C | Apt 5 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 18, 2019 |
| Nov 30, 2018 | B | Apt 4 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APPROXIMATELY 6 SQ. FT AT CEILING AND 2 SQ. FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 4, 3rd STORY, APARTMENT AT NORTH | Jan 4, 2019 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 30, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED A APARTMENT 2 ON 2ND FLOOR, 2 BEDROOMS, BATH, LIVING ROOMS AT CEILINGS & WALLS VERTICAL CRACKS & BULGING PLASTER, HALLWAY FL | Open |
| Jul 22, 2026 | DOB | LANDMARK: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 1:42 PM ET. BBL 3001830037.