5 floors · 22 apartments · 24,360 sq ft · built 1907 · class C4 · owner of record: The Joe Housing Development Fund Corpora Tion
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-27 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 24, 2012 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. INSIDE APT #3A - 3RD FLR. APPROVED GATE AT FIRE ESCAPE WINDOW IS DEFECTIVE, DIFFICULT TO CLOSE AND OPEN. REMEDY: REMOVE OBSTRUCTION. #34956850Y | Nov 16, 2012 WRITTEN OFF | $0 |
| Jul 20, 2012 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED,EXIT PASSAGWAY.INSIDE APT3A,3 FLR GATE @ FIRE ESCAPE WAINDOW DEFECTIVE HARD TO OPEN.ALSO NOTED PLANTS @ FIRE ESCAPE,HOUSEHOLD ITEMS @ 5 FLR FIRE ESCAPE @ FRONT OF BLDG.REM:REMOVE #34956625H | Jul 17, 2015 IN VIOLATION | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 2, 2026 | C | Apt 4D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 28, 2026 |
| Jul 2, 2026 | B | Apt 4D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 6, 2026 |
| Jul 2, 2026 | C | Apt 4D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 28, 2026 |
| Jun 22, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUILDING ENTRANCE DOOR LOCK AND ASSEMBLY FROM STREET TO VESTBULE AT PUBLIC HALL, 1st STORY | Jul 27, 2026 |
| May 26, 2026 | C | Apt 4D · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | May 23, 2026 |
| May 26, 2026 | B | Apt 4D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOORS AT WEST CLOSET IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 30, 2026 |
| May 26, 2026 | C | Apt 4C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 21, 2026 |
| May 26, 2026 | B | Apt 4C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 30, 2026 |
| May 26, 2026 | B | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR AT ENTRANCE IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 30, 2026 |
| May 26, 2026 | B | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR AT ENTRANCE IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 30, 2026 |
| May 26, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK ASSEMBLY AT BUILDING ENTRANCE DOOR , 1st STORY | Jun 30, 2026 |
| May 26, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK ASSEMBLY AT VESTIBULE DOOR , 1st STORY | Jun 30, 2026 |
| May 26, 2026 | B | Apt 4C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 30, 2026 |
| May 26, 2026 | B | Apt 4D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 30, 2026 |
| May 26, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Jun 1, 2026 |
| May 26, 2026 | C | Apt 4D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 21, 2026 |
| May 26, 2026 | C | Apt 4D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 21, 2026 |
| May 26, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT VESTIBULE DOOR 2 AT PUBLIC HALL, 1st STORY | Jun 30, 2026 |
| May 26, 2026 | B | Apt 4D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 30, 2026 |
| May 26, 2026 | B | Apt 4D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 30, 2026 |
| May 26, 2026 | B | Apt 4D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 30, 2026 |
| May 21, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE DOOR , 1st STORY | Jun 25, 2026 |
| Apr 27, 2026 | C | Apt 4C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | May 23, 2026 |
| Apr 27, 2026 | B | Apt 4C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT THE LOWER WINDOW SASH AT 2ND WINDOW FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 1, 2026 |
| Nov 3, 2025 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ... WOOD FLOOR IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 8, 2025 |
| Mar 25, 2025 | A | Apt 4C · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR KNOBS, IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 28, 2025 |
| Oct 20, 2023 | C | Apt 3C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3C , 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 15, 2023 |
| Dec 10, 2019 | C | Apt 4D · SECTION 27-2056.7 ADM CODE: Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to Local Law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities. | Dec 16, 2019 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 2, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Jul 2, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Jul 2, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 2:48 AM ET. BBL 2026910109.